Download presentation
Presentation is loading. Please wait.
Published byNelson Tyler Modified over 9 years ago
1
Palm Beach County Traffic Division – October 2014 1
2
BEELINE HWY NORTHLAKE BLVD 60TH STREET N. PERSIMMON BLVD ORANGE GROVE BLVD SEMINOLE PRATT WHITNEY RD STATE RD 7 CRESTWOOD BLVD ROYAL PALM BEACH BLVD OKEECHOBEE BLVD FOLSOM RD N. STATE RD 7 COCONUT BLVD MINTO WEST STATE RD 80 ORANGE BLVD COUNTY RD 880 CONNORS HWY GL NORTH BLOCK IOTA (EB) GL AP GL SOUTH LION COUNTRY HIGHLAND LEONARD FLEMING 9.2 MILES 8.7 MILES AVENIR
3
Palm Beach County Traffic Division – October 2014 3
4
BEELINE HWY 4 LANE DIVIDED NORTHLAKE BLVD 60TH STREET N. PERSIMMON BLVD ORANGE GROVE BLVD SEMINOLE PRATT WHITNEY RD STATE RD 7 CRESTWOOD BLVD ROYAL PALM BEACH BLVD OKEECHOBEE BLVD FOLSOM RD N. STATE RD 7 COCONUT BLVD ORANGE BLVD UNDER CONSTRUCTION 2015 CONSTRUCTION STATE RD 80 MINTO WEST IBIS BLVD 140TH AVE. N.HALL BLVD FUTURE CONSTRUCTION
5
Palm Beach County Traffic Division – October 2014 5 COMMUNITIES AREA (AC) FLU RESIDENTIAL UNITS NON-RESIDENTIAL UNITS NET DAILY TRIPS GENERATED Acreage 1 3,750RR103,000-30,000 Minto West (Ag Enclave)3,791AGE2,996235,00038,007 Block (Nurseries)643RR1064-640 GL Homes North3,027RR10302-3,020 GL Homes South571RR1057-570 GL Homes AP1,336AP--- IOTA (EB)1,284RR10128-1,280 Leonard-Fleming943RR1093-930 Avenir (Gardens)3,148RR10314-3,140 Avenir (Gardens)1,603RR2080-800 TOTAL 20,096 7,034235,000 78,387 1 Out of 17,000 total lots in the acreage, 3,000 lots are currently vacant
6
Palm Beach County Traffic Division – October 2014 CURRENT PROPOSAL Residential - Single Family3,446DU Residential - Multi-Family Townhomes600DU Residential - Single Family 55+ Detached300DU Residential - 55+ Attached200DU Hotel150Room Community College3,000Students General Office450,000SF Research & Development600,000SF Light Industrial450,000SF Retail500,000SF Park192AC Private Civic - Church70,000SF Private Civic - Community Centers70,000SF Private Civic - Day Care Center10,000SF FLU Residential - Single Family2,996DU Retail/Office235,000SF CURRENT PROPOSAL - NET NEW TRIPS DAILY AMPM INOUTTOTALINOUTTOTAL 63,5622,3842,2784,6622,2812,6514,932 FLU - NET NEW TRIPS DAILY AMPM INOUTTOTALINOUTTOTAL 38,0076571,7432,3991,7571,2022,959 DIFFERENCE DAILY AMPM INOUTTOTALINOUTTOTAL 25,5551,7275352,2635241,4491,973 31% 30%
7
Palm Beach County Traffic Division7 7 DAILYAM PEAK HOURPM PEAK HOUR Existing FLU (2,996 DU)5.9%1.9%6.4% Current Proposal23.4%16.8%30.0%
8
MINTO WEST 15.5 %20.0 % 22.5 % 27.0 % 38.0 % 10.0 % 19.0 % 10.0 % 17.0 % 16.5 % 18.0 % 3.0 % 13.5 % BEELINE HWY NORTHLAKE BLVD 60TH STREET N. PERSIMMON BLVD SEMINOLE PRATT WHITNEY RDSR-7 CRESTWOOD BLVD ROYAL PALM BEACH BLVD OKEECHOBEE BLVD FOLSOM RD COCONUT BLVD SOUTHERN BLVD ORANGE BLVD FLORIDA’S TURNPIKE PGA BLVD HAVERHILL RD MILITARY TRAIL BENOIST FARMS RD SANSBURYS WAY ROEBUCK RD BELVEDERE RD BIG BLUE TRACE 45TH ST JOG RD N. SR-7 AVOCADO BLVD BLUE HERON BLVD HALL BLVD 140TH AVE. N. TEMPLE BLVD SR -7
9
Palm Beach County Traffic Division – October 2014 9 CURRENT PROPOSAL - NET NEW TRIPS PERSIMMON BOULEVARD – 2-WAY AMPM 769813 EXISTING FLU - NET NEW TRIPS PERSIMMON BOULEVARD – 2-WAY AMPM 8281020
10
NORTHLAKE BLVD 60TH STREET N. PERSIMMON BLVD SEMINOLE PRATT WHITNEY RD CRESTWOOD BLVD ROYAL PALM BEACH BLVD OKEECHOBEE BLVD FOLSOM RD COCONUT BLVDORANGE BLVD N. SR-7 AVOCADO BLVD HALL BLVD 140TH AVE. N. TEMPLE BLVD SR -7 MINTO WEST ROEBUCK RD Palm Beach County Traffic Division – October 2014 10 First Eastern Connection No Later Than 1,300 Dwelling Units Second Eastern Connection No Later Than 3,000 Dwelling Units Western Connection No Later Than 2,600 Dwelling Units ** Based upon proposed Zoning conditions.
11
8+ LANE 6 LANE BEELINE HWY NORTHLAKE BLVD SEMINOLE PRATT WHITNEY RD CRESTWOOD BLVD OKEECHOBEE BLVD FOLSOM RD COCONUT BLVD SOUTHERN BLVD ORANGE BLVD FLORIDA’S TURNPIKE HALL BLVD 140TH AVE. N. PGA BLVD HAVERHILL RDMILITARY TRAIL BENOIST FARMS RD SANSBURYS WAY ROEBUCK RD BELVEDERE RD BIG BLUE TRACE 45TH ST JOG RD BLUE HERON BLVD 4 LANE 8 LANE MINTO WEST AVOCADO BLVD TEMPLE BLVD 60TH STREET N. PERSIMMON BLVD SR-7 N. SR-7 SR -7 ROYAL PALM BEACH BLVD ROEBUCK RD Minto Study – Identified Link Improvements
12
ROADWAYLINK 2018 LANEAGE PROPOSED LANES ESTIMATED COST COMMENTS Coconut Blvd Orange Blvd to Temple Blvd2L4LD$5,893,520 Re-evaluate and prioritize following the extension of SR-7 from 60 th Street N to Northlake Boulevard Temple Blvd to Northlake Blvd2L4LD$6,804,624 Northlake Blvd 140th Ave N to Coconut Blvd4LD6LD$7,538,700 Coconut Blvd to Ibis Blvd4LD8LD$22,585,120 Ibis Blvd to SR-74LD8LD$7,406,280 SR-7 to Beeline Hwy4LD6LD$13,848,240 Okeechobee Blvd E Rd to Folsom Road2L4LD$8,334,624 Crestwood Blvd to RPB Blvd4LD6LD$3,462,060 RPB Blvd to Wildcat Way6LD8LD$9,126,788 Only 21 vehicles over the capacity of a 6-lane roadway RPB Blvd60th Street N to Orange Blvd2L5L$5,985,520 Re-evaluate and prioritize after the extension of SR-7 Estimated Cost of County Links to be Re-Evaluated = $35,349,152 Estimated Cost of Other County Links = $55,636,324 Palm Beach County Traffic Division – October 2014 12
13
Developer Funded Estimated Cost of State Links = $57,742,988 Palm Beach County Traffic Division – October 2014 13 ROADWAYLINK 2018 LANEAGE PROPOSED LANES ESTIMATED COST COMMENTS Seminole Pratt- Whitney Road Persimmon Blvd to 60th St N 4LD---- Developer Funded Persimmon Blvd to 60th St N 4LD6LD Developer Funded Southern Blvd Big Blue Trace to Forest Hill Blvd 6LD8LD$3,353,748 County will Participate in FDOT SR-80 Action Plan in 2015 Forest Hill Blvd to RPB Blvd 6LD8LD+$13,971,960 RPB Blvd to SR-7 8LD8LD+$15,525,840 SR-7 to Sansbury's Way 8LD8LD+$8,226,720 Sansbury's Way to Benoist Farm Rd 8LD8LD+$5,209,120 Benoist Farms Rd to Pike Rd 8LD8LD+$5,520,640 SR-710/B. Line HwyNorthlake Blvd to Jog Rd 4LD6LD$5,934,960 Segment included in the PD&E Study in 2014
14
Total State Intersection Improvements = $83,001,476 Total County Intersection Improvements = $4,435,044 Palm Beach County Traffic Division – October 2014 14 INTERSECTION LOCATION ESTIMATED COST RESPONSIBLE AGENCY Northlake Boulevard and Beeline Highway (Urban Interchange) $34,700,000FDOT Okeechobee Boulevard and SR-7 (Urban Interchange) $40,000,000FDOT Okeechobee Boulevard and Jog Road $1,828,823FDOT Persimmon Boulevard and Royal Palm Beach Boulevard $1,733,280County Southern Boulevard and Seminole Pratt Whitney Road $336,920FDOT Southern Boulevard and Forest Hill Boulevard $6,135,733FDOT Nine (9) Miscellaneous Intersections $2,701,764County
15
Palm Beach County Traffic Division – October 2014 15 IMPROVEMENT SUMMARYESTIMATED COST County Links to be Re-Evaluated$35,349,152 Other County Roadway Links$55,636,324 County Intersection Improvements$4,435,044 Sub-Total (County)$95,420,520 State Roadway Links$57,742,988 State Intersection Improvements$83,001,476 Sub-Total (State)$140,744,464 Total$236,164,984
16
Palm Beach County Traffic Division – October 2014 16 Minto West Proportionate Share Payments $51,217,580 Minto West Okeechobee Boulevard CRALLS $3,363,800 Sub Total Minto West $54,581,380 Future Sub-Area Wide Impact Fees (Non-Minto) (4,038 DU x $7,280.56) $29,398,901 Total $83,980,281 Statewide Funding Strategic Intermodal System (SIS) Approximately $96 Million in Eligible Projects Palm Beach County Metropolitan Planning Organization (MPO)
17
Widening of Seminole Pratt Whitney Road 4-Lane Divided Roadway - North of the High School by 2018 $51 Million – Based Upon 2014 Estimates 1 st Payment of $8 Million Due Before 873 rd Dwelling Unit 9 Additional Payments After the First Payment Escalation Cost Adjustments (PPI) No Defined Projects for Prop-Share Payments Palm Beach County Traffic Division – October 2014 17 Comprehensive Plan and Proposed Zoning Condition Proposed Zoning Conditions
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.