1
Locating and Eliminating Illicit Connections June 28, 2006 James Walls
2
Agenda 1.Background and Organization 2.Previous Methods 3.Current Methods 4.Questions and Comments
3
Regulation Background Harris County is a Phase I community Joint MS4 permit became effective October 1, 1998 Joint MS4 permit with City of Houston, Harris County Flood Control District, Texas Department of Transportation- Houston District, and Harris County; aka “Storm Water Joint Task Force” Harris County is a Phase I community Joint MS4 permit became effective October 1, 1998 Joint MS4 permit with City of Houston, Harris County Flood Control District, Texas Department of Transportation- Houston District, and Harris County; aka “Storm Water Joint Task Force”
4
Regulation Background Web site is www.cleanwaterclearchoice.org Currently awaiting renewal of MS4 permit by the TCEQ Web site is www.cleanwaterclearchoice.org Currently awaiting renewal of MS4 permit by the TCEQ
6
Organization Harris County Harris County Public Health and Environmental Services Harris County Public Infrastructure Division Environmental Public Health Engineering Division Harris County Storm Water Quality Section
7
Previous Methods Respond to citizen complaints Dry and Wet Weather Screening of major outfalls (conveyance of >36” or drainage of an area >50 acres) Screened more than 1300 major outfalls during dry weather with less than 5% success rate of locating and eliminating illicit connections Screened more than 130 major outfalls during wet weather and discovered no illicit connections Previous Methods Respond to citizen complaints Dry and Wet Weather Screening of major outfalls (conveyance of >36” or drainage of an area >50 acres) Screened more than 1300 major outfalls during dry weather with less than 5% success rate of locating and eliminating illicit connections Screened more than 130 major outfalls during wet weather and discovered no illicit connections
8
Current Methods Citizen complaints Major Outfall screening Multi-Sector General Permit inspections Commercial inspections Citizen complaints Major Outfall screening Multi-Sector General Permit inspections Commercial inspections
9
Citizen Complaints
10
Agency created November 1953 Estimated 1.5 million people in unincorporated Harris County Respond to approximately 250 water based complaints per year Provide a 24 hour citizen complaint hotline Agency created November 1953 Estimated 1.5 million people in unincorporated Harris County Respond to approximately 250 water based complaints per year Provide a 24 hour citizen complaint hotline
11
Citizen Complaints
12
Major Outfall Screening
13
Have currently inventoried more than 3,000 Major Outfalls in Harris County and stored them in a centralized database The outfalls that had a discharge or evidence of a recent discharge are scheduled for a return inspection Have currently inventoried more than 3,000 Major Outfalls in Harris County and stored them in a centralized database The outfalls that had a discharge or evidence of a recent discharge are scheduled for a return inspection Major Outfall Screening
14
Conduct at least 110 of these inspections per year during dry weather conditions Conduct at least 11 inspections per year during wet weather conditions Receive a biannual list from TCEQ of utility districts that have submitted unauthorized discharge reports Conduct at least 110 of these inspections per year during dry weather conditions Conduct at least 11 inspections per year during wet weather conditions Receive a biannual list from TCEQ of utility districts that have submitted unauthorized discharge reports Major Outfall Screening
16
Multi-Sector General Permit Inspections
17
Texas Pollutant Discharge Elimination System (TPDES) Multi-Sector General Permit (MSGP) became effective in August 2001 Inspect approximately 150 new sites per year (required to do 10 per year) Conduct follow-up inspections to ensure compliance If necessary forward to enforcement coordinator Texas Pollutant Discharge Elimination System (TPDES) Multi-Sector General Permit (MSGP) became effective in August 2001 Inspect approximately 150 new sites per year (required to do 10 per year) Conduct follow-up inspections to ensure compliance If necessary forward to enforcement coordinator
18
Multi-sector General Permit Inspections
19
Commercial Inspections
20
Program was implemented in July 2004 Identified five different business sectors we felt could have a negative impact on storm water Developed sector specific literature about storm water impacts
21
Commercial Inspections Conduct at least 110 site visits per year Program focuses on outreach as well as enforcement Goal is to be proactive as opposed to reactive
22
Commercial Inspections Main idea is to be more effective by stopping the pollution before it enters the system as opposed to finding its origin once in the pipe The five sectors are restaurants, plant nurseries, vehicle and equipment washing,fueling stations, and automotive and boat care
23
Commercial Inspections
25
James Walls jwalls@harriscountyhealth.com www.harriscountyhealth.com James Walls jwalls@harriscountyhealth.com www.harriscountyhealth.com