Download presentation
Presentation is loading. Please wait.
Published byBlaise Greene Modified over 9 years ago
1
Restoring Flooded Buildings Kenneth Hellevang, Ph.D., P.E. Extension Engineer and Professor North Dakota State University Fargo, ND
2
Initial Steps Use personal protective equipment – Gloves, boots, eye and respiratory protection Shut off electricity if there is water on the floor Shut off gas if heating system has been affected Check for structural damage Document damage Contact insurance agent
3
Remove Water Slowly Remove 2 to 3 feet of water from the basement Wait 24 hrs, if the water level rises, wait 24 hrs. Remove another 2 to 3 feet Continue process until water is removed.
4
Water Damage Restoration IICRC S500 Standard and Reference Guide for Professional Water Damage Restoration Third Edition 2006 – Institute of Inspection Cleaning and Restoration Certification Authored by application and technical experts
5
Categories of Water Clean Water – Category 1 – Broken water pipes, rainwater, etc Gray Water – Category 2 – Contains contamination & microorganisms – Toilets with urine,sump pump,dishwashers Black Water – Category 3 – Contains pathogenic agents – Sewage, surface water flooding, pesticides
6
Contaminated Water Restoration Dispose – carpet cushion – absorbent stuffed fabrics – Saturated absorbent materials Ceiling tile, dry wall, paper, etc. Evaluate structural materials for degree of contamination and physical damage
7
Contaminated Water Restoration Discard carpet saturated with category 3 water Category 2 water carpet contamination may be cleaned with hot water extraction and biocide Remove floor if water reached subflooring – Subflooring must be cleaned, disinfected, dried
8
Remove Mud Shovel out wet mud Flush non-porous surfaces with water Clean non-porous walls starting at the bottom or where damage is worst Clean then disinfect
9
Biocide Must be used according to label (specific application) – The label is the law Must be applied to clean surface Must have required exposure time Must use PPE Ventilate the area Common biocides – Alcohol, sodium hypochlorite (chlorine bleach), hydrogen peroxide, iodine, quaternary ammonium chloride, synthesized phenolic compound
10
Electrical All electrical fixtures (switches, outlets, breakers, wire) submerged in flood water need to be replaced. Electrical motors will need to be professionally reconditioned. Contact an electrician or an electrical inspector.
11
Mold Occurs within 2 to 3 days
12
Health Effect Scientific evidence links mold and other factors related to damp conditions in buildings to: Asthma symptoms in those with the chronic disorder Coughing, wheezing, and upper respiratory symptoms in otherwise healthy individuals Hypersensitivity Pneumonitis in susceptible people Lower respiratory illness in children Institute of Medicine of the National Academies 2004
13
Canadian Department of Health Mold cell walls contain a compound with inflammatory properties Mold spores and mycelial fragments contain allergens Exposure to indoor mold is associated with an increased prevalence of asthma-related symptoms such as chronic wheezing, irritative, and non-specific symptoms http://www.ec.gc.ca/CEPARegistry/notices/NoticeText.cfm?intNotice=400&intDocument=2692 March 12, 2007
14
Respiratory Protection Respirators – Minimum N-95 respirator or mask – Proper fit – Labored breathing
15
Eye Protection Goggles must prevent entry of dust and small particles
16
GUIDELINES AND RECOMMENDATIONS The Institute for Inspection, Cleaning, and Remedial Certification (IICRC) IICRC S520 “Standard and Reference Guide for Professional Mold Remediation” EPA Remedial Guidelines – www.epa.gov www.epa.gov http://www.extension.org/ EDEN – the Extension Disaster Education Network
17
REMOVAL OF MOLD CONTAMINATION People react to active, dormant and dead mold - Biocides are not adequate! Porous Materials (ceiling tiles, carpeting, upholstered furniture, wallboard) – Remove and replace Non-porous surfaces – Vacuum with HEPA filters – Wash with a detergent solution – Sanitize with a biocide if desired – Thorough drying Semi-porous (floor joist, sill plates) – Remove mold, HEPA filter, biocide, dry
18
Structural Drying Open enclosed areas (walls, floors) Reduce indoor relative humidity to <40% Ambient temperature <72°F Circulate air across drying surfaces Drying may take several days or longer Monitor with moisture meters Monitor relative humidity
19
Acceptable Moisture Level Material type affects potential for mold growth Wood moisture >15% may lead to mold growth Relative humidity >70% Do not enclose wet/damp materials
20
Moisture Meters
21
Rebuilding Vinyl or ceramic tile flooring Dry floor under vinyl
22
Rebuilding Wood Air moves from stud wall cavity into living space
23
HVAC
24
Test for Water Vapor Movement Clear plastic taped to surface – Watch for several days – Moisture accumulation indicates problem Basement wall or floor http://www.rd.com/64970/article64970.html
25
Crawl Space Dry soil Place plastic Ventilate?
26
Air Cleaners Filters remove only some spores & do not remove proteins or VOCs Ozone units should not be used in an occupied space and are not effective!
27
Search for NDSU Flood Information http://www.ag.ndsu.edu/disaster/flood.html
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.