Story of a Cellar Conversion Click to start Slideshow
2
Excavating the window well which is then used wherever possible as the access point for the Damp Treat team avoiding disruption to the remainder of the property
3
Digging out the floor
4
Sinking the sump into the floor
5
Drainage channel is laid around the perimeter and covered with pea gravel First fix plumbing is installed ready for installation of radiators etc
6
Application of cavity drainage membrane to the walls and floor
7
Application of cavity drainage membrane to the stairs
8
A reinforced screed has been laid over the floor membrane and independent studwork erected around the walls
9
Insulation is incorporated into the studwork
10
Plasterboard is applied to studwork and any internal studwork walls required erected
11
Plasterboard is skimmed
12
Stairs are clad with wood
13
Installation of second fix plumbing including radiators and any sanitary ware
14
The finished product showing windows and cupboards created around meters
15
The finished product showing retained arch features, radiators and down lighting