AGS PP Progress Haixin Huang Time Meeting January, 31, 2012.

Similar presentations


Presentation on theme: "AGS PP Progress Haixin Huang Time Meeting January, 31, 2012."— Presentation transcript:

1 AGS PP Progress Haixin Huang Time Meeting January, 31, 2012

2 Haixin Huang2 Status AGS setup is stable over past one week. Polarization is around 70% at extraction. The focus of last week was injection polarization measurement with e880 polarimeter. Many thanks to Dave Underwood, Hal Spinka and Steve Gliske who worked on e880 polarimeter after their STAR shifts. Compared to the past, the injection asymmetry (polarization) is higher this year.

3 Date Time Asymmetry Error Pol(200MeV) Normalized Asym. 5/14-29/2005 64.0 0.64 79.064.81 3/26/2006 66.7 1.24 80.866.04 6/20-21/2006 64.9 0.55 82.263.16 2/15/2008 61.4 0.20 76.064.63 2/5/2011 63.8 1.10 79.164.52 1/23-27/2012 68.0 0.46 79.668.34 AGS Injection Polarization Measurements Injection polarization is higher this year by a few percent. The gain vs. last year could be different harmonic correction.


Download ppt "AGS PP Progress Haixin Huang Time Meeting January, 31, 2012."

Similar presentations


Ads by Google