Download presentation
Presentation is loading. Please wait.
Published byAmie Spencer Modified over 9 years ago
1
1 PG&E’s 2006-2008 Portfolio Performance December 11, 2006 Duane Larson Senior Manager Customer Energy Efficiency Pacific Gas and Electric Company DFL2@pge.com
2
2 Today’s Update Portfolio Performance – Are we on track? 2006 Additional Measures
3
3 Megawatts Paid
4
4 Gigawatt-hours Paid
5
5 Million Therms Paid
6
6 Megawatts Committed
7
7 Gigawatt-hours Committed
8
8 Million Therms Committed
9
9 Summary Achieved 2006 MW and GWH goals Achieving Therm goal is going to be close at year end All delivery channels are now producing savings Increasing numbers of paid calculated savings projects Program staff are analyzing 2006 performance and developing forecasts and goals for 2007
10
10 Targeted Markets Core Greydon H. Hicks Manager Targeted Markets Pacific Gas and Electric Company GHH1@pge.com
11
11 Megawatts Paid TM contribution to 11/30/06 YTD Core Mass Market Paid Accomplishments: 25.71 MW or 22% of total
12
12 Gigawatt-hours Paid TM contribution to 11/30/06 YTD Core Mass Market Paid Accomplishments: 705 GWH or 13% of total
13
13 Million Therms Paid The TM contribution to 11/30/06 YTD Core Mass Market Paid Accomplishments: 1.63 MM Thm or 21% of total
14
14 Megawatts Committed
15
15 Gigawatt-hours Committed
16
16 Million Therms Committed
17
17 What’s new in Targeted Markets? Server Farm Virtualization Software and High Efficiency Servers – High Tech Pumping Efficiency Program – Ag/Food Wine tartrate removal using electrodialysis -Ag/Food PG&E Core Retro-Commissioning Offering – Retail, Medical, Large Office, Private Colleges Building Commissioning - Retail, Medical, Large Office, Private Colleges LED case lighting demonstration– Retail, Hospitality California Solar Initiative Coordination – All segments Federal Tax Credits Coordination – All Segments
18
18 What is working in Targeted Markets? High Tech Ag and Food Processing Industrial/Fabrication Retail Large Office Building
19
19 Challenges in Targeted Markets Schools - Emphasis on deemed measures and streamlining new construction Hospitality – focus on deemed for dispersed smaller motels, and concentrate TM resources on greater Bay Area larger hotels Medical – emphasis on deemed measures, new construction for pipeline development and retro-commissioning BioTech – develop new construction for long-term pipeline
20
20 Targeted Markets Questions/Comments/Suggestions
21
21 PG&E Core - Mass Markets Keith Reed Manager Mass Markets Pacific Gas and Electric Company KNR3@pge.com
22
22 Megawatts Paid
23
23 Gigawatt-hours Paid
24
24 Million Therms Paid
25
25 Incentives Paid
26
26 Core MM Channel MW Comparison
27
27 Core MM Channel GWH Comparison
28
28 Core MM Channel MM Therm Comparison
29
29 Mass Market: What’s New? LED Refrigerator Case Demo Report Regional Vendor Meetings Trade Professionals Newsletter Direct Mail Campaigns Water Agencies Steam Traps Advertising (Appliances/Summer) Cool Roofs
30
30 Mass Market: What’s working? Upstream Channel Midstream Channel Refrigerant Charge & Airflow Duct Test & Seal Increased interest from upstream distributors/manufacturers –(Lighting, Appliances, etc)
31
31 Mass Market: Challenges Therm Savings Vendor Participation Downstream participation slow statewide Commercial Pool System expansion Double Dipping monitoring SBEE (Small Business Energy Edge)
32
32 Mass Market: Program Design Changes Revamp evaporative cooler delivery E-rebate to allow vendors to submit electronically Bundled Building Performance Incentive –HVAC installation/design, lighting, windows, insulation, etc. Midstream HVAC Distributors Delivery –Out
33
33 Questions/Comments/Suggestions Mass Market:
34
34 Third Party Program Update Misti Bruceri / Mona Yew Supervisors Third Party Programs Pacific Gas and Electric Company M1BT@pge.com / MxY9@pge.com
35
35 Third Party Program Status All 32 RFP I programs are underway –Audits and marketing in progress for nearly all programs –21 programs are accepting applications and/or conducting direct implementation activities –Savings through October: 1.0 MW, 6.01 GWh, 0.18 MTherms
36
36 Third Party Program – RFP II RFP II completed –17 programs selected –12 contracts signed to-date 21.8 MW 83.9 GWh 4.37 MTherms –5 contracts in final stages of completion
37
37 Third Party Programs – RFP II Ag and Food Processing –Light Exchange Program (Richard Heath and Associates) Fabrication, Process and Heaving Manufacturing –AIM Compressed Air Efficiency (Air Power USA) –Value Energy Stream Mapping Advantage Plus (California Manufacturing Technology Consulting) –Compressed Air Program (Ecos Consulting)
38
38 Third Party Program – RFP II High Technology –Laboratory Airflow Control Systems Re-Commissioning Program (Newmatic Engineering) Large Commercial –Energy Efficiency Partnership Program for California State-Leased Facilities (Enovity) –Boiler Energy Efficiency Program (Enovity) –Retrocommissioning Program (Portland Energy Conservation Inc.)
39
39 Third Party Program – RFP II Mass Market –Heatwise (Energy Solutions) –Fan Time Delay Relay Program (Proctor Engineering Group) Retail –Big Box Cool and Light (Energy Solutions) Schools, Colleges and Universities –California Preschool Energy Efficiency Program (Low Income Investment Fund)
40
40 PG&E Residential New Construction Cece Barros CEE Solar Integration Coordinator CABE1@pge.com Shagun Boughen Supervisor/Program Manager Residential New Construction SXBQ@pge.com
41
41 Background CSI – March 2, 2006 CPUC opened a proceeding to develop rules and procedures for the California Solar Initiative (CSI) SB 1 - August 21, 2006, Governor signed Senate Bill 1, which directs the Commission and the CEC to implement the CSI program NSHP - CEC manages a $350 million program to encourage solar installations in new home construction through its NSHP
42
42 Challenges in RNC ENERGY STAR Market Slow down Homes not selling Solar new and costly Purpose: To align with NSHP to encourage solar in residential new construction Encourages builders to exceed minimum EE requirements when installing solar by offering increased incentives
43
43 What’s new in RNC Existing: ES New Homes –15% better than T-24 –QII/TBC Mandatory –$400 Coastal –$500 Inland Prescriptive - measure based Proposed: ES New Homes –15% better than T-24 –QII/TBC Mandatory –$400 Coastal –$500 Inland Prescriptive - measure based NSHP Tier II: 35% better than T-24 40% cooling reduction ES Appliances $2,000 Solar Only NSHP Tier I: 15% better than T-24 ES Appliances $400 or $500 Solar Qualified
44
44 RNC continued Cost Effectiveness Existing TRC:.83 PAC: 1.54 Proposed TRC:.88 PAC: 1.40 Energy Savings: 15% = 375kWh; 137Therms – 2006 Program 35% = 699kWh; 225Therms Energy Calculations: State approved software for Res Energy Standards and Tax credits – Micropas Includes distribution of housing stock by CZ Weighted average for PG&E for Tier II
45
45 Residential New Construction Questions/Comments/Suggestions
46
46 PG&E’s 2006-2008 Water-Embedded Energy Pilot December 11, 2006 Bill Miller Principal Regulatory Analyst Customer Energy Efficiency Pacific Gas and Electric Company WCM2@pge.com
47
47 The Water-Embedded Energy Pilot CPUC announced consider of W-E energy in R. 06-04-010 Summer 2006: Workshop and Comments ACR Ruling directing an Application for a W-E Energy Pilot be filed January 15, 2006
48
48 ACR Issues in the W-E Pilot Ruling Issues raised in the Pilot Ruling –Will counting embedded energy savings related to water conservation now produce real new benefits or simply give credit for savings that would have occurred anyway –“Another matter of considerable discussion is that the amount of energy needed to produce, convey, and treat water differs dramatically form place-to place” –Pumped water often moves through more than one service territory –Reducing water usage may produce benefits in the service territory of a water-upstream electric utility
49
49 ACR Directive on W-E Pilot To be filed January 15, 2006 One-year pilot programs to begin by July 1, 2007 Partner with one (or more) large water provider to jointly fund programs Funding separate from 2006-2008; suggest limit to total of $10 million No credit for savings toward 2006-2008 risk/reward; count to better understand program benefits Encouraged to be innovative! Workshop in 2007 2 nd quarter to prepare for full incorporation for water-related programs for 2009-2011 Workshop also addresses: savings determination methods; EM&V; procedural guidelines; outreach; training
50
50 What Can the Pilot Accomplish What actually needs to be resolved to introduce W-E energy saving programs into 2009-2011 programs?
51
51 Pilot Design Demonstrate how to calculate embedded water-energy intensity (kWh/gallon) for specific program activity Demonstrate how to calculate net embedded water-energy savings (kWh) Identify the sources contributing to the embedded water-energy for specific program activity Demonstrate the potential for future embedded water-energy savings programs Work toward sample EM&V protocol (work with ED)
52
52 How will PG&E achieve objectives? Partner with strategic water utilities Focus on measurement and verification Target market segment that will best accommodate objectives
53
53 Current Thinking: Partner with strategic water utilities Work with: –East Bay Municipal Utilities District (EBMUD) –Santa Clara Valley Water District (SCVWD) –Sonoma County Water Agency (SCWA) Because each: –Have good baseline embedded water-energy data –Have significant experience with water conservation programs, coupled with budget and staff –Have strong relationship with PG&E
54
54 Focus on M&V Data exists on: –Water conservation programs & potential –Programs that save water and onsite energy –EM&V protocol for water savings, and for energy savings But what we don’t know: –What is the embedded water-energy intensity for a specific region? –How do you measure embedded water-energy? –Who’s energy is it? –What is this energy worth? –What is suitable embedded energy protocol?
55
55 Target market segments: CI&I –Water districts identify as opportunity for water savings –PG&E has good contacts within segment –Significant potential water savings, coupled with better ability to meter water & energy, will provide best set of data/experience for EM&V development Multi-region –Will have set of diverse embedded water-energy intensity data –Will have set of diverse embedded energy supply source data
56
56 CI&I Market Opportunities Schools Food Processing Food Service Laundries Biotech Health Services
57
57 Detailed Example: Water Savings In Schools Boiler blow down & condensate return Process lines Food steamers Evaporative coolers Cooling towers Ice machines Dishwashers Fixtures
58
58 Detailed Example: Food Processing Rinse / wash process lines Scalding / cooking processes Recycling process water Boiler blow down & condensate return
59
59 Detailed Example: Food Service Food steamers Evaporative coolers Ice machines Dishwashers Process lines Cooling towers
60
60 Discussion The Water-Embedded Energy Pilot
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.