Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hydrology Project - II Salient Features & Progress Implementing Agency: CGWB 8 th May, 2014.

Similar presentations


Presentation on theme: "Hydrology Project - II Salient Features & Progress Implementing Agency: CGWB 8 th May, 2014."— Presentation transcript:

1 Hydrology Project - II Salient Features & Progress Implementing Agency: CGWB 8 th May, 2014

2 ItemsCostReimbursement Project Cost (CGWB) As per Original PIP – Rs 27.95 Crore As per RCT 2013 - Rs 66.32 CroreRs 66.32 Crore Expenditure Incurred upto March, 2014 38.45 Crore32.27 Crore Likely Expenditure by May 31, 2014 (allotted-2.02 Cr, Addl.fund sought – 11.17 Cr) 13.19 Crore13.28 Crore Total under HP 51.64 Crore45.55 Crore Likely Spill Over eGEMS 15.97 Crore Dev- 1.52 Crore SW /HW- 14.45 Crore Pilot project on Aquifer Mapping 0.89 Crore10% of consultancy Total Spill over 16.86 Crore

3 Name of Activities/ProgramAchievements Upgrading of Hardware19 Server and 59 workstation procured Hardware procured (Pilot Aquifer Mapping) i) Work Station -12 Nos ii) Laser Printer- 5Nos iii) Note Book- 14Nos iv) Scanner - 5 Nos. Software procured ERDAS Imagine, Arc GIS, Rockworks Aquifer Test Pro for Pilot Aquifer Mapping Visual Modflow, Aquifer Test Pro, Modflow Surfact, Hydrogeoanalyst, GMS V 8.1, FEFLOW FMH3 & Temporal Analyst for Ground Water Modeling Centre Data Procured  All India GIS digital data set at Village Boundary Level  Digital Toposheets for Pilot Aquifer Mapping Areas Decision Support System (DSS) The DSS for the water resources planning developed by NIH, Roorkee and technical feedback provided by CGWB with respect to GW component.

4 Name of Activities/ProgramAchievements Awareness Raising Training32 Training on Domain & Software 27 International Training and Study Tour Officers of CGWB deputed for 8 International Training courses Purpose Driven Study 1)Specific Yield Study for Planning and Designing AR Structures in Sub-urban in Chennai – Completed. 2)Real Time Ground Water Monitoring System in NCT, Delhi – Procurement of DWLR (30 nos.) with Telemetry System not materialised. However, the study has been completed using manual measurement 3)Pilot project on Aquifer Mapping- Continuing Construction of Piezometers 114 (Punjab-65, Goa-49) Construction of Wells 35 - under Chennai PDS 76 – Under Pilot Project on Aquifer Mapping Analytical Quality Control Exercise (for CGWB Lab) Completed

5 Name of Activities/ProgramAchievements Award Date (Consultancy for development of e-GEMS) 06.11.12 Start Date End Date 20.11.12 19.11.13 Extension of Consultancy Extension sought from Ministry upto 31 May, 2014 after getting approval of HLTG Members Revised Project Plan Progress Data Entry modules developed Few Reports and Charts developed Software development in progress Procurement of Software The proposal for procurement of Arc GIS is being sent to PCS, MoWR for financial sanction Tender for procurement of Oracle, SAP & Visual Studio under preparation

6 Name of Activities/ProgramAchievements Procurement of Hardware Proposal for hiring of BSNL Data Centre services for hosting of e-GEMS is under submission The cost of the proposal is Rs 13.36 Crore Out of this 0.247 Crore is proposed from HP-II and 13.113 Crore from GWM&R Scheme

7

8 Name of StudyMajor Findings Specific Yield Study for Planning and Designing AR Structures in Sub-urban in Chennai The artificial recharge structure suitable for the region is the percolation pond with injection wells. Injection wells can be constructed inside the tanks to a depth of 13 to 20 mbgl. The top of the injection well should be kept at the flood point level of the tanks. Study of Ground Water Dynamics and Installation of Real Time Ground Water Monitoring System in NCT, Delhi Under the study it was proposed to install automatic Data Logger on Piezometer at selected locations. But the procurement of data logger could not be materialized due to certain reasons beyond control. However, the study has been completed using manual measurement

9 Pilot Project AreasKm 2 Baswa-Bandikui Watershed, Dausa District, Rajasthan - I – AQRAJ 598 Maner-Khagaul Area, Patna Dist, Bihar (Watershed GNDK013) - II – AQBHR 521 Watershed WGKKC-2, Nagpur district, MaharashtraWatershed WGKKC-2, Nagpur district, Maharashtra - III – AQMAH 360 Parts of Tumkur District, KarnatakaParts of Tumkur District, Karnataka - IV – AQKAR 376 Lower Vellar, Cuddalore district, Tamil Nadu - V – AQTND 344 Part of Thar Desert, Jaisalmar District, Rajasthan. - VI – AQDRT 675 Pilot Project on Aquifer Mapping was taken up under Purpose Driven Study component in six different Hydrogeological terrains of the country.

10 Collection and Compilation of existing data completed. Various thematic layers prepared. Identification of data gap completed. Additional data generated using hydrogeological and geophysical techniques to fill the data gap.  Water Level Data  Water Quality Data  Ground Water Exploration data through drilling  Determination of Aquifer parameters through Pumping test  Generation of Geophysical Data using Ground and Heliborne survey through NGRI as consultant The integration of geophysical & hydrogeological data is under progress. On the basis of hydrogeological data, conceptualization of aquifer system has been made for all pilot areas. Modeling through simulation is under progress.

11 ActivityTargetAchievement Pre-SkyTEMPost SkyTEMTOTAL 1D Surface Geophysics VES54016583248 GTEM115222162384 Sub-Surface Geophysics Logging 120101727 2D Surface Geophysics ERT7551.7240.0491.76 HRSS0.0 4.34.30 Heliborne Geophysics TEM SkyTEM 1380013860

12 2D & 3D aquifer disposition have been envisaged on the basis of Conceptual model. Different Aquifer systems have been demarcated.  Bihar – Three Aquifers delineated and Palaeochannel have been characterized.  Maharashtra - The zones of each flow depicting intertrappean, weathered and compact basalt could be identified and Gondwanas & Basalts have been precisely demarcated.  Tamil Nadu - Four aquifer systems have been clearly indicated in Pilot area of Tamil Nadu; Palaeochannel showing fresh water aquifer comprising of coarse sand is seen at the depth of 100-110 m running N-S and occurrence of limestone at shallow depth along the coast at places may indicate fault.  Karnataka - Potential zones identified at select locations. The project is under progress and integration of results would bring out the refinement in sub surface disposition of aquifer; the efficacy of different techniques and protocol for use of Geophysical methods.

13 Aquifer- I Aquifer- II

14

15

16

17

18 Figure 12: TEM sounding results at AQDRT area Marly Limestone with bentonite gypseous clay Saturated saline water alluvium underlain by limestone/s andstone Dray sand underlain by saline zone

19 First Layer (Sandstone) First Layer ( Sea (Bay of Bengal) Aquifer - I (Sandston e) Aquifer – IV (Sandstone) Second Layer (Clay) Aquifer – II (sandstone) Sixth layer (Clay) Fourth Layer (Clay & Lignite) Aquifer - III (Sandstone) Perumal Eri Neyveli Lignite Mine 45,000 GPM pumping Aquifer Management Plan (aquifer unit wise) (lower Vellar water shed, TN) basement AquiferIssues I - Aquifer o Pumping for irrigation, Industries & Domestic. o Sea water intrusion II- Aquifer o Pumping for irrigation, Industries & Domestic. o Sea water intrusion III- Aquifer o Heavy withdrawal for Lignite mining (45,000 GPM) o Sea water intrusion AquiferManagement I - AquiferDesilting of Perumal Eri (will induce recharge) II - AquiferManaged Aquifer Recharge III - AquiferPlanned Pumping schedule & Managed Aquifer Recharge, after completion of mining IV - AquiferFuture allocation for drinking purposes

20 Item Amount as per Contract Agreement Paid to NGRI up to 31.04.14 Consultancy Charges 8,98,04,000 6,28,62,800 (70% = 10%+20%+40%) Heliborne Survey Services 12,24,00,000 Payment to Aarhus University for Heliborne Survey 6,76,19,558 (2,93,50,000 +3,82,69,558) (80% paid – 3 installment out of 4) Payment for Hiring of Helicopter Services 175,83,260 (first four areas-AQRAJ, AQDRT, AQMAH & AQBHR) Equipment cost 6,18,50,0001,03,87,434 Total27,40,54,00015,84,53,052

21 HeadActivityContracted value/ Estimated Cost (Rs. in Lakhs) Expenditur e incurred by March 31, 2014 (Rs. in Lakhs) Likely expenditure to be incurred by May 31, 2014 (Rs. in Lakhs) Head Wise Total (Rs. in Lakhs) BE 2014- 15 (Rs. in Lakhs) Requirement of Additional Fund (Rs. in Lakhs) PS NGRI Consultancy charges898.04628.63269.42 618.30192.00426.30 Heliborne Survey Services (Payment to Aarhus University by NGRI) 864.07676.20187.87 Hiring of Helicopter Services (by NGRI) 230.44175.8363.40 Consultancy for Development of e- GEMS 253.7424.6049.21 Hiring of BSNL services for Hosting of e-GEMS 1336.000.0048.40 M&E Multi-Electrode Multi Channel Resistivity Systems (NGRI) 194.720.00192.02 472.680.00472.68 Advanced Resistivity Meters (NGRI)39.2228.299.59 Syscal Pro (by NGRI)45.5034.088.52 DGPS (by NGRI)18.7212.573.15 Server & Workstation-Payment86.8682.083.78 Software for e-GEMS331.000.00255.62 Major Works Construction of wells through outsourcing under Pilot Project 394.60128.61265.99 0.00265.99 FTEForeign Training--10.00 0.00 Total1790.891366.97 202.001164.97

22 From the experience of the scheme, following suggestions are made Since the HP-I and HP-II was not implemented in few states, there is a need of upscaling the three major components of HP-II through strengthening of State Ground Water departments by improving of institutional and organisational arrangements

23 1.Introduction of e-GEMS to non-HP states on mutual consent of respective state governments 2.Development of Standard protocol for use of geophysical techniques for aquifer mapping from the results of Pilot Project on Aquifer Mapping, which will be used for National Aquifer Mapping programme. 3.Transfer and dissemination of hydrological and water quality data for basic water resource evaluations between central and all the state agencies

24 Application of HIS: Following reports have been published using HIS data:  State Report - Regional Groundwater Scenario depicting the occurrence, development potential and management options for groundwater resources of the state  District report - Groundwater Scenario & formulation of sustainable groundwater development Strategy at the district level  Ground Water Year Books - Groundwater Year Book for each region & Groundwater Year Book consolidated for the country are published every year  Groundwater Estimation Report as in 2004, 2009 & 2011 by each States - Assessment of Groundwater resources for each state  Water Supply Investigation report - Feasibility report for sustainable groundwater development  Groundwater Exploration Report - Summary of exploration carried out by Central Ground Water Board In addition, application of HIS data in Artificial Recharge Scheme formulation and water quality investigations.

25 Data Dissemination: Data disseminated to various Central and State government departments, Central & state universities and research students for different academics and scientific investigations.

26 Thanks A Journey from Ground Water Development to Aquifer Management Pilot Project on Aquifer Mapping

27 HP III Proposed Activity for Hydrology Project III Up-scaling to Other States (A)Institutional Strengthening Procurement of Hydrogeological equipment Procurements of Geophysical equipment Procurement of software Procurement of chemical equipment: (B) Vertical Extension Identification of the issues related to public concern in water management in the existing states. Hydro-geological support data collection at micro level increased frequency of water level monitoring Compilation and Integration of existing data


Download ppt "Hydrology Project - II Salient Features & Progress Implementing Agency: CGWB 8 th May, 2014."

Similar presentations


Ads by Google