Download presentation
Presentation is loading. Please wait.
Published byGervase Lyons Modified over 9 years ago
1
AMEU Convention Durban 16 October 2007 ESKOM UNIVERSAL ACCESS TO ELECTRICITY BUSINESS PLAN Anton Theron Peter Sebola
2
1. CONTENTS Introduction UAP Context Methodology Results Critical Success Factors Conclusion
3
2. INTRODUCTION Our state president, in his state of the nation address in May 2004, set a target for all South Africans to have access to electricity by 2012. Universal Access is not a new concept, been on government’s agenda since the 90’s. However, in 2004 a committed timetable was officially extended to the nation.
4
3. UAP CONTEXT 2005 DME contracted Eskom for approach. 2006 statistics presented: - Current: 3 million - By 2012: 5 million Workshop identified need for plan to manage “Universal Access”. DME contracted Eskom to undertake the work.
5
3. UAP CONTEXT - Programme PHASE 1 Medium Term Planning Proposal Per Municipality 3-year MTEF cycle PHASE 3 Integrated Network Plan PHASE 2 Short Term High Level UAP Planning Proposal In line with Government Objectives 3 months STAGE 1 Electrification Universal Access Business Plan Master Plans For Accelerated Growth Composed of 2 Stages STAGE 2 Integrated Network Plan Long Term
6
Data Management Verify with the Regions Gather & Analyse Data Handover to Electrification and Network Planning Electrification and Network Planning Analysis & Workshop with Regions Compile plans, agree with regions on plans Strategic Studies Determine best guess growth figures based on econometric and demographic modeling PMO Finalise Business Case Handover to Electrification and Network Planning Input to Bus. Case 3. UAP CONTEXT – Phase 3 Stage 1
7
4. METHODOLOGY Definition of Universal Access -Grid electrification option of choice with alternate technologies as interim solution -Alternate technologies replaced through process of continuous improvement Determining Backlog -All existing authorised housing units with no access -Brownfields (Infills) & Greenfields -Exact locality of backlog -Census 2001official source for backlog statistics
8
BACKLOG PROCESS: Combination of HELP, DWAF & Census data GIS buffer around all electrification transformers; Count homesteads inside and outside this buffer; Brownfields (Infills) = Inside count - Prepaid customers Greenfields = Outside count - existing land rate customers Strategic Studies Team adjusted results for growth and Census alignment
9
4. METHODOLOGY Continued… Planning Process (3 months) –Qualitative planning approach –Workshops (Demand side & Supply side plan) –Iterative process Load & Energy Estimates –Past load research data –Function of income GIS Platform
10
Has Capacity Limited Capacity No Capacity 4. METHODOLOGY Continued…
11
5. RESULTS - Backlog per province 2 million households in Eskom supply area
12
5. RESULTS - Accelerated Plan: No constraints 2.5 million connections by 2012 with growth
13
5. RESULTS – Pragmatic Plan with 07/08 Funding 2.5 million connections by 2012 with growth
14
5. RESULTS – Total Forecasted Demand
15
5. RESULTS - Summary
16
6. CRITICAL SUCCESS FACTORS Inclusion of municipal backlog areas Data update (satellite imagery) Maintain geospatial planning platform Stage 2 to proceed Detailed Industry supplier capacity assessment Understanding of REDS impact Operational expansion
17
7. CONCLUSION UAP shows that although great strides have already been made, much work still lies ahead to provide universal access to electricity Task is not limited to electrification projects only as we remember it in the 90’s but also requires substantial upstream network expansion & strengthening
18
Thank You Q’s ?