Agenda Safety Topic Overview of Agenda Introductions

Similar presentations


Presentation on theme: "Agenda Safety Topic Overview of Agenda Introductions"— Presentation transcript:

1

2 Agenda Safety Topic Overview of Agenda Introductions
Richard Rife, Deputy Project Manager Lori Baker, Acquisition Services Manager Behle Burns, Design Manager John Walczyk, Construction Area Superintendent Evan Carlson, Field Procurement Manager Glenn Franklin, Project Procurement Manager

3

4 Overview Identification, Prequalification and Selection of Potential Bidders – What is the process and what are the requirements Request for Proposal – Section by Section Review Complete Proposals – What does it take to provide a complete proposal eRFP (Electronic Request for Proposal) R:/Administration/Presentation/SubcontractorTraining/Prequalification Requirements for Subcontractors June 2006

5 Prequalification Process Potential Bidders List
Potential Bidders are identified as follows: Bechtel Global Supplier Information System Expressions of Interest through the BGCAPP Website Industrial Search Engines (Thomas Register, Construction Blue Book, etc.) Small Business Advocate input

6 Information needed by Supplier for FREE Registration Dunn and Bradstreet Number Bonding capacity, bid range Annual sales Area of expertise, work experience to enter commodity code information Business size classification

7 Identification, Qualification and Selection of Potential Bidders
Prequalification Procurement Professional issues Prequalification Requirements to Potential Bidders Potential Bidders MUST respond completely and timely Subcontractor’s Certification Form to be completed/signed Satisfactory completion of the Prequalification requirements normally qualifies that the prospective offeror will be issued an RFP (Request for Proposal) Prequalification Requirements are unique to each Request for Proposal (Scope of Work). Prequalification Requirements will typically be divided between Commercial Technical

8 Identification, Qualification and Selection of Potential Bidders
Commercial Is the potential supplier capable of furnishing a complete scope for the materials/equipment? Contact Information has been completed Similar Scope Experience List, including a summary of performance and Customer Contact Information Audited Financial Statements and/or current Comprehensive Dun and Bradstreet Report

9 Identification, Qualification and Selection of Potential Bidders
2) Technical Is the Bidder capable to perform the Scope of Work? What is the Bidder’s experience with this Scope of Work? Do they have capable personnel? What work is Subcontracted? (Work performed by others) Does the Bidder have an acceptable QA Program (e.g. ISO Certificate, or Table of Contents) ? Shop Capacity, and Work Load - does the Bidder have the ability to meet the shipment schedule?

10 Request for Proposal BGCAPP will issue formal, written Request for Proposals (RFP) for all permanent plant equipment The content for each RFP will be unique depending on the requirements of the Material Requisition. An RFP typically includes the following documents: Request for Proposal Letter (including attachments) Information and Instructions to Bidders Representations and Certifications Commercial Form of Proposal (including attachments) Technical Form of Proposal (Evaluation criteria)

11 RFP Letter - SAMPLE

12 RFP Form of Proposal ALL FIELDS MUST BE COMPLETE! If field is not applicable state N/A

13 RFP Section 1 Scope of Work and Pricing

14 RFP Section 2 Technical Specifications
2.3 – Drawings 2.4 – Technical Notes

15 RFP - Section 3 Drawings and Data Requirements
G321-E SAMPLE

16 RFP - Section 3 Drawings and Data Requirements
G321-EX SAMPLE

17 RFP - Section 3 Drawings and Data Requirements
G321-V - SAMPLE

18 Material Safety Data Sheet
Product Name: Adhesion Promoter AP8000 Issue Date: 11/09/2005 Print Date: 10 Aug 2006 * Indicates a Trademark Page 1 of 8 The Dow Chemical Company encourages and expects you to read and understand the entire (M)SDS, as there is important information throughout the document. We expect you to follow the precautions identified in this document unless your use conditions would necessitate other appropriate methods or actions. Material Safety Data Sheet Product Name: Adhesion Promoter AP8000 Issue Date: 11/09/2005 Print Date: 10 Aug 2006 * Indicates a Trademark Page 1 of 8 The Dow Chemical Company encourages and expects you to read and understand the entire (M)SDS, as there is important information throughout the document. We expect you to follow the precautions identified in this document unless your use conditions would necessitate other appropriate methods or actions. The Dow Chemical Company

19 RFP– Sections 4a, Flow-Downs, and Section 4b
Section 4a: General Conditions Flow-Downs (Appendix FOA-1) are an appendix of the General Conditions and are specific points contained in our Prime Contract that MUST BE flowed down to the Suppliers Section 4b: Special Conditions Remember, exceptions to Terms and Conditions is an evaluation consideration!

20 RFP - Section 5 Supplier Quality Surveillance
INSPECTION

21 RFP Section 6 Expediting Instructions
Expediting Instructions offer specific guidance on submission of: Schedules Progress reports Organization charts Seller purchase orders Packing lists Shop loads/schedules Supplier Deviation Disposition Requests BUYER’s Expediting Contact

22 RFP Section 7 Packing, Marking, and Shipping Instructions
Provides specific instructions on the requirements for Packing, Marking and Shipping equipment/goods including US Export Control Compliance

23 RFP Section 8 Invoicing Instructions
Invoicing Instructions are provided to summarize the Invoice payment process requirements. It includes instructions on: Payment Terms (where they are located) Electronic Payment Invoice Preparation Instructions Bechtel Electronic Funds Transfer Authorization Form FAILURE TO PROVIDE A PROPERLY PREPARED INVOICE MAY RESULT IN THE INVOICE BEING REJECTED!

24 RFP Section 9 Supplier Quality Assurance Program

25 RFP Representations and Certifications
Representations and Certifications are required with all proposals. This document requires the Offeror to make Representations and Certifications about their company. Reps and Certs must be completed by an authorized agent of the company Failure to complete Reps and Certs may result in removal of your proposal from further consideration

26 Complete Proposals What constitutes a complete proposal?
The million dollar question, literally. It is IMPERATIVE that a Bidders proposal is complete and on time. Incomplete or untimely proposals may not be considered. What it takes to provide a complete proposal: READ THE ENTIRE RFP. Even if you are an experienced offeror, the requirements may change from RFP to RFP. It is IMPERATIVE that Bidders read and understand the entire RFP. In a typical RFP, the following documents are required to be provided with the proposal: Any requirements of the Information and Instruction to Bidders. Examples are as follows: Financials Experience Statements Copies of Code Stamps Resumes Execution Plans Copy of QA Manuals

27 Complete Proposals What constitutes a complete proposal?
Continued A completed Form of Proposal. THAT MEANS NO BLANKS. EVERY FIELD SHOULD BE FILLED OUT, IF IT IS NOT APPLICABLE, TELL US! Include all attachments, such as (but not limited to): Optional Pricing Worksheets Unit price breakdowns A summary of Commercial or Technical Exceptions (if any) Technical Form of Proposal, including any submittal requirements A completed Section 1 Scope of Work and Pricing. If your company requires you to use a specific application to provide an offer, that’s fine, but the Section 1 document must be complete! Signed and dated Representations and Certifications form.

28 Review What you should know now
QUESTIONS?

29 Procurement Status 32% Complete

30 Forecast of Acquisitions
Construction Materials Construction Equipment, Tools, & Consumables Trucks and Gators Welding Machines, Shop Fabrication Equipment Electrical Materials Miscellaneous and Specialty Fabrication Pipe/Fitting/Valves/Pumps/Flanges Schedule is subject to change!

31 Forecast of Acquisitions
Engineered Equipment & Materials Vertical Embeds Carbon Steel Pressure Vessels Bridge Monorail Crane Stainless Steel, Carbon Steel Clad & High Alloy Pressure Vessels Jib Crane Observation Windows Evaporative Coolers Chiller and Air Compressors Shield Doors

32 Forecast of Acquisitions
Subcontracts and Service Contracts Potable Fire/Water Tanks Firewater Pump House Non-Destructive Examination Services Architectural Doors, Windows & Hardware Snow Removal & Road Sweeping Parking Lot Paving Personnel Maintenance Building Utility Building Laboratory Building

33 BGCAPP Project Website
Website Link: Please click on the link below to view a forecast of upcoming opportunities Construction and Services Awarded Company-138kv Main Substation and Pole Lines Awarded Company- Maintenance Building Awarded Company- Personnel Support Building Engineered Equipment Materials

34 Tips for Doing Business with Bechtel Parsons Blue Grass
Complete and current registration on Bechtel Supplier and Contractor Portal Look for opportunities on the project website Market directly to project via Small Business Advocate and other Acquisition staff Identify small business socioeconomic status Complete documents for prequalification Fully read and understand Request for Proposal Ask questions

35 Contact Information Diane Osbourne Small Business Program Advocate 301 Highland Park Dr. Richmond, KY 40475 (859)