1
Network Design and Implementation
Chapter 14 Network Design and Implementation
2
Agenda Analysis and Design Implementation LAN Voice Network Design
3
Analysis and Design Phases
Request Feasibility Study Analysis (requirement) Alternatives (cost and benefit) Design Selection Cost Documentation Management approval
4
Implementation Phases
Purchasing and vendor agreement Installation Training, and testing Conversion Follow up audit
5
Request Source Form: formal or informal
User Senior managers Communication department External environment (customer, government, etc.) Form: formal or informal Prioritization (costs & benefits analysis) Outcome: approval, deny, or on hold by management
6
Feasibility Study Team Problems
User, specialist, and management Problems Technical or non-technical Analysis (technical, operational, economical, legal, schedule) Report and presentation Go or stop
7
Analysis Analysis items Documentation and reports
Geographic requirement (scope) Traffic load analysis Peak load (no. of message and length) National & international busy hour Traffic flow pattern by individual location (map) Response time, reliability, & availability (cost) Terminal operators (end users & their education background and needs) Capacity growth projection (6 months to 5 years) Constraint: time, cost, and compatibility Documentation and reports
8
Alternatives Sources (vendors)
Availability (enchancements or new products) Incompatibility issues Costs/services trade off
9
Design Items Simulation Configuration diagram
Routing time (peak and average) Response time (peak and average) Delay consideration (queue) Simulation What if for routing, response, and delay
10
Selection Procedures Request for proposal (RFP) or request for quotation (RFQ) Selection criteria and its weight
11
Request for Proposal Title Table of contents
Description of organization Problem definition Operation requirements Format of response Evaluation criteria Decision schedule References
12
Description of Organization
Organization chart Organization locations Overview of system
13
Problem Definition Error rate Misrouting Time consuming Security
14
Operation Requirements
Reliability Down time Misrouting Lost message Transmission error Performance Throughput Response time Error rate
15
Format of Response - I Title Table of contents Overview
Software (function & feature) Hardware (function, feature, & capacity) Performance (future growth) Site requirement Conversion (installation, testing, & schedule)
16
Format of Response - II Maintenance (support) Costs Warranty Coverage
User Training References Other related information
17
Selection criteria Proposed solution Compatibility Security and backup
Price Technical support Product maintenance Repair service Financial viability
18
Vendor Response to RFP - I
Introduction Executive summary Table of contents System design System feature Growth capacity Installation and testing methods Maintenance arrangements Ongoing support Installation schedule Pricing and timing of payments Warranty coverage Training and education Other Recommendation
19
Documentation Diagrams and maps Components list
Configuration and wiring Components list Hardware: model and specification Software: version, release, no. of copies Implementation plan (Gantt chart) Milestones Activities Schedule
20
Management Approval Review and verification Management: budget Users
Operators Management: budget
21
Purchasing Vendor agreement Get a experienced lawyer
Equipment configuration specification Acceptance test Schedule: delivery, installation, testing, operation Location: delivery, installation, testing, operation Other terms and conditions: payment, warranty, maintenance Get a experienced lawyer
22
Training Types of instruction Educating Security and backup Classroom
Hand on In house Outside Educating Users Operators Maintenance crew Security and backup
23
Testing Testing time Testing Tools Testing areas Software & hardware
IBM’s Telecommunication Network Simulator Testing areas Performance Stress testing (load) Error handling Error recovery procedures
24
Conversion Types Help desk Vendor technicians or consultants
Parallel Cut over Pilot Piece by piece Help desk Vendor technicians or consultants Implementation problems cleanup
25
Audit After six months Check performance or success criteria
Formal report to management for proper actions
26
LAN Design Number of nodes Usage Traffic: day and time Disk storage
Speed Security and backup Compatibility Management
27
Voice Network Design Peak load and average load Grade of service
Capacity & usage of circuits Overdesigning or planned delay
28
Points to Remember Analysis and Design Implementation LAN
Voice Network Design
29
Discussion Develop a simple request for proposal to add e-business to a traditional department store.
Similar presentations