Download presentation
Presentation is loading. Please wait.
Published byMatthew Harrison Modified over 9 years ago
1
Projects Preview 2015 NUCA March 19, 2015 Colorado Springs Utilities
2
Projects in solicitation phase Tesla Reservoir Liner Rehabilitation – RFP documents on RMEPS, proposals due 04/01/215 Solicitations 2 nd quarter Homestake Suction Pipeline Replacement – Design RFP, 66-inch PCP along Arkansas River, repair/selective replacement of 5,830 feet Rampart Dam Low Level Seepage – Design RFP, mitigation of seepage at toe of Dam Solicitations 3 rd quarter Homestake Suction Pipeline Replacement – Industry Day followed by RFP for CM/GC Rampart Dam Low Level Seepage – RFP for CMAR Sanitary Sewer Directional Drill – IFB Woodmen Valley Tank – 2.0 MG – IFB for repairs Ute Pass Tank – IFB for repairs Biological Nutrient Removal Improvements at the LVWWTP Treatment Plant – SOQ/IFB
3
Solicitations 4 th quarter Little Mesa Tank Replacement – 5.0 MG, new tank Nichols Dam and Spillway Modifications - SOQ/IFB Solicitation Projects schedule TBD Cheyenne Mountain 24” Directional Drill 24” 400 feet Wilson Tank – 5.0 MG – Repairs Upper Woodmen Tank -.50 MG - Repairs
4
Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.