1
Cleaning out the stable for the girls
2
Bathroom window – we have to leave the stained glass and sash and install the new window on the outside of them
3
Inside the bathroom
4
Screen needs replacing, two tiny holes
5
New windows in the upper north bedroom
6
This one is finished, just outer edges of trim to paint
7
Bathroom window installed
8
Tackling the dormer – three new windows go here
9
One new window fits in the opening for the original two
10
Then we create openings for new windows on each side. This way the roof is supported
11
Ready to rip and tear
12
I’ll have a nap after lunch
13
Door at the top of the stairs
14
Vent pipe in the way so Pete helps Ryan remove it and patch the roof. It had been cut off in the basement but never removed when the new one was installed
15
Three new windows in the dormer, repairs underway
16
Checking the chimney flashing
17
Inside the dormer, new windows installed
18
Carter likes to steal gloves and run around the house with them
19
Window jambs for the replacement windows
20
Kitchen gets new windows in a box, this is the base
21
You can see the angle braces
22
Insulating the floor
23
Small patch on the basement concrete floor
24
Prest Electric has ‘ HUGGIES’
25
Kitchen window box taking shape
26
A better view
27
A view of the new kitchen window through the old window opening.
28
The new windows installed
29
Ready for trim
30
Gloves on the ladder top protect the wood
31
Caulking finished, ready for primer and paint