Download presentation
Presentation is loading. Please wait.
Published byPercival Lang Modified over 9 years ago
1
USCG Hurricane Response & HMS BOUNTY SAR Case North Carolina 2013 All-Hazards Conference 12 March 2013 CDR Tim Cummins– Deputy Sector Commander LT Kevin Sullivan – Sector NC Command Center Chief
2
Hurricane Response Overview Command Structure Assets/Capabilities Missions Partners
3
Command Structure ICS Structure Decision Point Scalability Interoperability
4
Assets/Capabilities Sector Assets Surge Capabilities Personnel Reservists Assets Aviation Cutters ATON Strike Teams Facility Support
5
Missions SAR Limitations Inland/Coastal/Offshore Missions Marine Transportation System Recovery (MTSR) Ferry System Ports (Disaster Recovery Supplies) Aids to Navigation (ATON) Marine Environmental Protection (MEP) Law Enforcement Ports, Waterways and Coastal Security (PWCS)
6
Missions: Inland SAR Hoist capable helos MH-60 MH-65 High Water Rescue Swift Water Rescue Communications (800 MHz) Tertiary Cell Phone ARES
7
Missions: Marine Environmental Protection
8
Missions: MTSR/ATON
9
Stray Buoys
11
Partners Federal Army Corps of Engineers Environmental Protection Agency State/County/Local State/Eastern Branch/County EOC’s & 911 Centers Coastal Municipalities (Fire/Police/EMS) NCDOT Bridges/Ferry Divisions NC Wildlife/Marine Patrol Industry State Ports Pilots
12
Partnerships: ACOE/EPA
13
Emergency Ferry Routes
14
Questions?
15
HMS BOUNTY SAR Case Challenges
17
Timeline (all times local) Sunday 28 OCT 2130: SCC receives email via agent that HMS BOUNTY w/ 16POB is disabled and T.O.W. 90NM SE of Cape Hatteras. SCC is unable to establish direct comms with vessel SCC Requests C-130 from A/S E-City to investigate. ~2330: C-130 on-scene, establishes comms. Overnight the C-130 remains on-scene, provides comms link as situation worsens. SCC coordinated plan to abandon ship after sunrise.
18
87NM
19
Timeline Continued Monday: 0426: Vessel capsizes crew forced to abandon ship 0430: SCC requests A/S E-City launch 2 MH-60’s 0641: CG-6012 on-scene, hoisting one survivor 0756: CG-6012 BINGO, 5 survivors o/b 0856: CG-6031 BINGO, 9 survivors o/b ~0900: SCC determines 2 crewmembers remain missing, begins search planning. 1638: CG-6043 recovers 1 unresponsive PIW in search area. Tuesday 1632: Transferred SMC to D5 Friday 1830: D5 grants ACTSUS
20
87NM
21
Debris 30NM
23
SAR EFFORT STAT SHEET CASE TOTALS: Total area (SQNM): 10877.21 Total track miles: 6214.11 Searches Conducted - 22 H-60 – 5 C-130 – 7 C-144 - 2 ELM – 3 GALLATIN - 5 Total Sorties 19 Investigation and Hearing Pending
24
Contacts SCC 24x7: 910-343-3880 LT Sullivan Kevin.J.Sullivan2@uscg.mil 910-343-3876
25
Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.