Download presentation
Presentation is loading. Please wait.
Published byHubert Casey Modified over 9 years ago
1
GFP Industry Group Meeting October 6-7, 2004 U NIQUE ID ENTIFICATION (UID)
2
Action Items from last meeting Determine status of ordnance white paperJames Identify the data elements required and other issues for items at disposalTom R. Solicit industry opinion on NSN issuesPat S. (AIA) Develop VLIN white paperLeAntha Examine DLIS mapping for NSN to UID capabilityBruce, Pam, Max Update data elements list and distributeJohn M. Develop scenarios around kitsPat J., Rich C. Determine process for industry to notify government that a UID is retiredMax Develop definitions for status categories; vet against other definitionsPam, Max, Judy Follow up with DCMA (Marge Cunningham) regarding PCARSSEric S. Share the full data structure for registryPam R. Incorporate GFP field into DFARS final rule as a reporting indicatorLou G., Tom R.
3
UID GFP Industry Group Discussion Topics/Updates NPMA meeting in July (Sparks, NV) VLIN White Paper Retired UID white paper NSN/Cataloging discussions
4
Current UID Policy and Implementation Developments (LeAntha Sumpter and Lydia Dawson)
5
USD (AT&L) Objectives and Goals Update Integrate the various UID efforts working with the Joint Staff, Personnel and Readiness, PA&E, CIO and NII, Comptroller, Logistics, I&E and Acquisition Domains Develop a master plan and timeline integrating UID for Real Property, Personal Property, and RFID Develop strategy for managing GFP Develop a legacy UID policy and integrate the depot maintenance action plan
6
Data Roadmap Time Line FY-07 FY-06 FY-05 FY- 04/05 Enterprise Visibility AccountabilityValue OrganizationProgramLocationStatus AT&L/P&RPA&EAT&LCJCS/P&R/AT&L Legal Controlling Custody Steward Property (AT&L) Real PropertyPersonal Property AT&L People (P&R) PersonRole P&R CJCS/P&R/AT&L FormalAd HocBudgetACATAbsoluteRelativeCondition Disposition
7
What we have learned about Property Cannot get clean audit or asset visibility without standardizing data and processes DoD has countless property management systems ranging from paper to automated systems, spanning accountability, maintenance, disposal, inventory, and distribution Currently personal property handoffs occur inconsistently (probably at least 75 different processes) Target three receipt and acceptance approaches – Will take five years to re-engineer all; deployment undetermined Step one – DoD and Business Partners (Include GFP Registry) Step two – Internal DoD Step three – External Federal and Foreign Step four – Real Property Re-engineering effort should be directed by AT&L for property
8
Property UID Systems Environment “To Be” UID Registry Services PPUIDRPUID GFP Accountability & Value Maintenance Systems Property Systems Config.Mgt Systems External Data Sources EPC Registries Catalogs Registry Data Capture DoD Legacy Systems Updates for Changes Organization Value Status WAWF WIP Accounting Batch Entry FFP Capture Cost Type Direct Data Entry Expanded Access 9/04 Real Property Direct Access PCard Supply Depots
9
Reengineering Property Transfers
10
UID Plan for Government Furnished Property Guidance to Government – Policy then DFARS All solicitations issued after Jan 06 must use UID business rules All GFP sent after January 2006 must have UID unless DCMA verifies in GFP registry that the contractor has an approved UID corporate or facility implementation plan AT&L issuance of GFP Policy – October 04
11
UID Plan for Government Furnished Property Guidance to Contractors - DFARS 2005 No 1662 report required for Sept 05 if all existing property in GFP registry by July 05 using virtual UIDs Jan 06 All GFP property recorded in GFP registry* DCMA updates existing contractor T&Cs using block changes Jan 07 CAC/PKI target date for GFP functionality Add Real Property capability *Password enabled
12
Final UID DFARS Rule with Proposed Changes Requirement Clarifications –Items under $5K: Equipment and reparable items when they are serially managed, mission essential, or controlled inventory Material and consumable items when the requiring activity determines that permanent identification is required –General requirement for commonly accepted commercial marks if UID not required - deleted –Definitions added for Issuing Agency and Lot or Batch number –Embedded items; Any serially managed subassembly component, or part Exceptions Added –Contingency operations –Items acquired from a small business or under FAR Part 12 for commercial items, when – More cost effective for the Government to assign, mark, and register the UID after delivery, and HCA approves D&F (CAE for – ACAT I)
13
GSA – DoD UID Campaign New contracts should consider the UID requirement at award – set a new bar Establish UID training for GSA Associates who will perform “Get it Right” reviews Restructure the presentation of the policy, standards and UID documentation –UID website redesign –Continue the outreach and communication strategy Highlight the positive aspects of UID to vendors and customers –Options available in final DFARS rule –Enhances levels of visibility and accountability, enterprise efficiencies –Strengthen customer relationships through superior maintenance offerings resulting in increased customer satisfaction, i.e., better partnerships’ Opportunities for GSA and vendors –Establish a marking schedule for UID labels and plates –Establish a UID training schedule
14
UID Training Campaign DAU/NDIA Sponsored Events –Oct 22, Defense Supply Center Philadelphia General and Industrial Supplier Expo – King of Prussia, PA –Dec 17, USSOCOM Conference and Exhibit – Tampa, FL NCMA Midwest Conference – Oct 28, University of Minnesota DoD Small Business Training Conference – Oct 26-28, Temecula, CA
15
Next Steps September 04 USD (AT&L) issue legacy policy forecast Refine plan to re-engineer receipt and acceptance –Develop plan to resource data strategy October 04 –USD (AT&L) approve plan to resource data strategy (MID structure) –Refine master plan, timeline and resources to integrate UID for Real Property, Personal Property, and RFID –USD (AT&L) issue GFP UID policy –Staff revised directive on unique identity November 04 –USD (AT&L) issue task to re-engineer receipt and accountability –USD (AT&L) strategy summit with SAEs and DCMA December 04 –Issue Real Property UID Guidance –USD (AT&L) Legacy policy issuance
16
Government Furnished Property Overview
17
GFP Policy Priorities All GFP in the hands of contractors is serialized with a UID, either virtual or physical, no later than January 1, 2006. DCMA and the Components modify terms and conditions in contracts using block changes using as facilities become UID capable. All solicitations issued after January 2006 contain UID provisions applied to prospective GFP Enhancement to applications should accommodate the business rules related to GFP UID items.
18
GFP Policy Questions – Virtual UIDs Virtual UID Business Rules/Process is key Should virtual UID’s be the permanent UID? –Yes Should we allow a two step process (eventual UID would be different than the virtual)? –No Should virtual UID’s be limited to construct #1? If not, why not? –No, virtual UIDs shoculd not be limited to Construct #1
19
Stationary GFP in Use (IPE/OPE/ST/STE). Mark when reentering inventory. Contractor establish virtual Unique Item Identifiers (UIIs), using Construct #1. Business rules 32-36 apply. GFP in Storage. Mark when placed in use. Contractor establish virtual UIIs, using Construct #1. Business rules 32-36 apply. GFE Moving in and out of Plant. Entity that initiates movement marks items upon movement. Business rule 33 applies. GFP Initially Furnished to Contractor. DoD will mark these items before that are furnished. Business rule 37 applies. GFP in GOCOs. Mark or assign virtual as specified in operating contract. GFP IUID Strategies - Review
20
Do we need 5 categories of property distinction for UID? Should inactive GFP be tracked that way? Do we do this today? Would there be added value? If so, would 3 categories suffice with a flag for inactivity? Real Material and Spares Equipment GFP IUID Policy Issues
21
Degree of difficulty to achieve 100% of assets UID’d for –Material –Spares –Equipment How should material that would not normally require UID be tracked? How much movement constitutes the need for location update while in the custody of a contractor?
22
GFP UII Registry GFP Registry of Virtual UIDs Custodian CAGE GFP Item UII Date Issued Date Received Requiring Contract Number Parent/Child Relationships GFP Items By Company By Program UID Registry (GFP UIIs Flagged) Maintenance Systems Property Accountability Systems Contractor GFP Master Plans GFP in Use GFP in Storage Assign Virtual UII Mark with UII when Item Possession is transferred Assign Virtual UII Mark with UII when Placed in Use 100% GFP UIIs Assigned for Asset Accountability & Valuation Track GFP UIIs in Contractor Custody GFP Marked with UII by Issuing Source GFP in GOCO As specified in Operating Contract GOCO – Government-Owned Contractor-Operated Industry Inputs Government Inputs
23
The valuation of an item will be associated with its UID, however the government will maintain the official record of acquisition value. This change will be reflected in DFAR Part 245 GFP Valuation
24
Validate GFP UII Pedigree Data Elements Custodian CAGE GFP Item UII Date Issued Date Received Requiring Contract Number Parent/Child Relationships Property Accountability at Data Level Business Rules for GFP UII Registry Data Capture Interface with Receipt & Acceptance Assignment of Virtual UIIs Retirement of UIIs for GFP Disposals Access Protocols Publish DFARS GFP IUID Rule Implementation Issues
25
Registry Update (Bruce Propert)
26
UID Registry Status Implementation Timeline Concept definition – Oct 03 Development and Test – Nov 03 – May 04 Production – May 04 Move from DLIS domain to bpn.gov domain Sept 04 Functionality Pedigree data capture for End Items Source data from vendors WAWF Shipment Notification Direct electronic Web manual submission Current population 126 UID records 18 contracts 17 unique CAGE codes
27
UID Registry Status (cont.) Recent enhancements throughout UID submission flow Foreign currency indicator for unit cost LD as IAC for DoDAAC Future enhancements January 05 Capability to capture embedded items (e.g., subassembly) Capability to identify Government Furnished Property Capability to capture type of mark Virtual Other unique marks Sets environment for legacy item data capture Government authorization and access to registry Future enhancements – beyond January 05 Reports Location tracking Alias association Event status indicator Electronic query (system to system interaction)
28
Retiring GFP (Lydia Dawson)
29
To explore the DCMA systems for tracking the retirement of personal property [what data elements are needed in the property systems, what data elements are needed from the property systems to update the registry] Lost, Damaged or Destroyed (LDD) Part of eTools Tracks items that are GFP and CAP Tracks items that are no longer usable or currently unable to locate Tracks items by the case number No interface with other systems Plant Clearance Automated Reutilization Screening System (PCARSS) Being rebuilt as part of eTools [12 – 18 months] Tracks items that are GFP or CAP Currently contains most UID fields Tracks the disposition of items at the contractor’s facility [when closed] Based on inventory schedule that the contractor provides to the government Two-Digit disposition code [not consistent with GSA] Approximately 20 unique sales codes Tracks items by the case number Interfaces with DOD, GSA and NASA [tab delimited files] Version 3 will interface with Daisy & may limit archives to 5 years Retiring GFP and Integration with UID Registry
30
Need to define the development and testing timeframe to incorporate UID data into LDD and PCARSS Data submission to UID registry Define the transmission file format and method Are current data elements sufficient for UID registry electronic data entry Trigger to be case closed date UID registry currently only wants GFP items New FAR Rules – CAP reverts to GFP when transferred from contract to contract (DD250) Need to explore the Defense Reutilization and Marketing Service (DRMS), Defense Automated Information System (DAISY) Military Equipment not in contractor facilities Next Steps
31
Data Capture Working Group Goals –Define strategy to migrate to paperless GFP –Explore expanded registry access requirements –Define requirements for on-line GFP Confirm data structure Outcomes –Develop migration strategy –Identify Trigger Points for reporting CAP > GFP Incoming Inventory –Identify additional registry access requirements
32
GFP Working Group Goals –Discuss GFP workflow/decision tree, including Virtual UIDs –Discuss list of data elements required to manage GFP –Discuss roles and responsibilities associated with data elements –Discuss VLINs Outcomes –Refine issue areas –Refine data elements –Identify Trigger Points for reporting/management CAP > GFP Incoming Inventory –Identify additional industry requirements/issues
33
UID Discussion Items
34
Gov’t ID GFP Maintain Stewardship Records (Active/Inactive) Ships New GFP Equipment Flow Contractor Receives Contractor Del’s QA New items Acknowledge Receipt Discrepancy Report (364) Receive asset Initiate Stewardship records ID or mark non-UID’d or Marked items UID data, mark UID data, no mark No UID data, mark No UID data, no mark Loss, Damage, Destruction Modification Disposal Returned to Gov’t Contractor Acquired Buy or Fabricate Authority to Use (letter) Financial Title Maintenance Physical Location Property Stewardship changes Within same vendor To a different supplier In Place Items AbandonScrap Rental Calculations Warranty? Vendor Constraint Notice Transfer Notice
35
Receive New GFP Accept & Register UID (in stewardship) Marke d w/ UID or Equiv. ? Will item be returned to gov’t? Establish “alias” & register Do not mark Yes No Yes Mark prior to delivery to government New GFP Equipment Flow
36
New GFP Contract Flow Receive New GFP Contract plus SOW must specify UID marking requirement Is it under a service contract ? Does it have a physical UID upon arrival? Return to DoD for DoD to apply the UID End Process Yes No (Supply Contract) No Modify contract to have contractor apply the UID DoD waives the UID requirement
37
On-line GFP contractor Supplier DD250 UID Depot Mils1348 Item Data Item GFP I got it It broke Date Rx Condition Contract GFP Items Program Office No online DD1149 – k2k Ship notice 1149 xfers
38
New GFP Equipment Flow GFP Registry of Virtual UIDs Custodian CAGE GFP Item UID Date Issued Date Received Requiring Contract Number Parent/Child Relationships GFP Items By Company By Program UID Registry (GFP UIDs Flagged) Maintenance Systems Property Accountability Systems Contractor GFP Master Plans GFP in Use GFP in Storage Assign Virtual UID Mark with UID when Item Possession is transferred Assign Virtual UID Mark with UID when Placed in Use 100% GFP UIDed for Asset Accountability & Valuation Track UID Items in Contractor Custody GFP Marked with UID by Issuing Source GFP in GOCO As specified in Operating Contract GOCO – Government-Owned Contractor-Operated Industry Inputs Government Inputs
39
32. Tangible personal property items owned by the Government in the possession of a contractor will use the asset identification number used to track the item as the item's serial number within enterprise identifier. 33. Tangible personal property items owned by the Government in the possession of a contractor will use the enterprise identifier of the enterprise maintaining the serial number of the item. 34. A UII should be created for tangible personal property items owned by the Government in the possession of a contractor by using IUID Construct #1. 35. For items that do not require a IUID: If the item is delivered with a commercial item mark, it is acceptable to the Government. If an item is delivered without a commercial item mark, the contractor is not required to obtain one. 36. A UII is not required to be physically marked on tangible personal property items owned by the Government in the possession of a contractor unless the item is moved or delivered to a different location with a different enterprise identifier. 37. Tangible personal property initially furnished to the contractor by the Government will use the UII provided by the Government. If none is provided, establish a UII using the criteria in Rules 32-34. 38. Tangible personal property will also require markings or labels indicating Government ownership. GFP IUID Business Rules
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.