FLUKA status and plan Sixth TLEP workshop CERN, 16 -18 October 2013 F. Cerutti #, A. Ferrari #, L. Lari *, A. Mereghetti # # EN Dept. & *BE Dept.
2
Outline 2 1. A few reminders about Synchrotron Radiation 2. FLUKA implementation 3. Some geometrical considerations 4. Results 5. Conclusions & Future works October 17 th, 2013Luisella Lari - Sixth TLEP workshop
3
SR Emission 3October 17 th, 2013Luisella Lari - Sixth TLEP workshop Presented by A. Ferrari at the 4 th TLEP workshop (April 2013)
4
SR Emission 4October 17 th, 2013Luisella Lari - Sixth TLEP workshop
5
Fluka implementation of SR 5October 17 th, 2013Luisella Lari - Sixth TLEP workshop For more details see A. Ferrari at the 4 th TLEP workshop (April 2013)
6
E e- =175 GeV 80km machine; Radius at the dipole = 9.8 km 81% Bending Magnets; E crit = 1.21 MeV; E= 9 GeV/turn, dE/ds=1.39 keV/cm in the dipoles P = 9 x I[mA] MW = 9 x 10mA = 90 MW in the whole accelerator; dP/ds= 1.39 x I[mA] W/cm in the dipoles SR photons generated and tracked above 100 eV (99.999% of the total power), average energy of the photons =400 keV (E>100 eV) ; Assumed parameters 6October 17 th, 2013Luisella Lari - Sixth TLEP workshop
7
The starting idea 7October 17 th, 2013Luisella Lari - Sixth TLEP workshop Presented by A. Ferrari at the 4 th TLEP workshop (April 2013)
8
Preliminary layout of 1 FODO cell for TLEP 8October 17 th, 2013Luisella Lari - Sixth TLEP workshop 1/2 Quad. 1.5m Quad. 1/2 Quad. ~21.3m long dipole Courtesy B. Holzer Circumference of 80km !!! 50 cm Sext.
9
Preliminary layout of 1 FODO cell for TLEP 9October 17 th, 2013Luisella Lari - Sixth TLEP workshop 10.5m Dipole 50 m 50m -4*10.5m -2*1.5m -4*0.5m= 3 m3/10 =0.3m each interconnect 1.5m Quad. Note that Sextupoles were not yet considered in the actual Fluka model 1/2 Quad. 1.5m Quad. 1/2 Quad. ~21.3m long dipole 50 cm Sext.
10
Preliminary layout 10October 17 th, 2013Luisella Lari - Sixth TLEP workshop Courtesy A. Milanese Courtesy R. Kersevan Not yet an available quad. design but the B yes! Courtesy B. Holzer 2 proposed materials for the beam pipe EPOXY Updated cooling H2O channel ID 16mm 30 cm
11
10.5 m long dipole for 1 Beam line 11October 17 th, 2013Luisella Lari - Sixth TLEP workshop Beam pipe without shielding (no lead) but with cooling water channel TLEP 80 km
12
FLUKA model: summarizing 12October 17 th, 2013Luisella Lari - Sixth TLEP workshop 10.5m Dipole 1.5m Quadrupole implemented just as the analytical magnetic field 0.3 m 5* 24 cm long Absorbers 0.3 m Centered S S S S 0.3 m 25 mm Cu-OFS (0.085% Ag) (20:10) QD Lead
13
Total power 13October 17 th, 2013Luisella Lari - Sixth TLEP workshop All results take into account a Beam current = 10 [mA]
14
Luisella Lari - Sixth TLEP workshop H2O channel 14 October 17 th, 2013 Dipole S S S S Abs Q Power in the H20 for all the ABSORBERS: 14.7 W (shield) and 4.5 W (no shield) Power in the H20 for all the MAGNETS: 6.7 W (shield) and 87 W (no shield) 39 W42 W6 W 0.9 W 1.7 W 4.9 W0.1 W 7 W7.2 W0.16 W0.2 W0.05 W Heating of the in-pipe shield: need to move the H2O channel further in ?
15
Power density in the dipole beam-pipe 15October 17 th, 2013Luisella Lari - Sixth TLEP workshop Averaged along the Dipole length
16
Peak power density in the dipole beam-pipe 16October 17 th, 2013Luisella Lari - Sixth TLEP workshop Dipole length [cm]
17
Dose in the coils 17October 17 th, 2013Luisella Lari - Sixth TLEP workshop Averaged along the Dipole length
18
Peak Dose on the coils 18October 17 th, 2013Luisella Lari - Sixth TLEP workshop Mask?
19
Ozone production 19October 17 th, 2013Luisella Lari - Sixth TLEP workshop Adapted from NCRP Report 51, under the assumption of no O 3 dissociation over the air renewal time vent : For example, for P=10 W, V 10 8 cm 3, vent 10 h at saturation C O3 12 ppm Corrosion of the materials?
20
For SR emission the effects of absorbers were shown for the 80km TLEP option. A considerable reduction of the power deposited into the dipoles, in particular thanks to the absorbers immediately downstream of the dipoles. Not a critical integrated energy into the water channels with and without absorbers. A factor of 10 difference with and without absorbers for the power density in the dipole beam pipe and for the dose on the coils. Masks? Ozone production has to be carefully considered for limiting the corrosion of the materials. Limits? Conclusions 20 October 17 th, 2013 Luisella Lari - Sixth TLEP workshop
21
Future work 21October 17 th, 2013Luisella Lari - Sixth TLEP workshop Possible follow-up: Other magnets design for dipoles, quadrupoles and sextupoles. Following impedance considerations, an updated version of the in-pipe shielding with possible different integration of the water cooling channel into the absorbers. Changing the orientation of the dipoles could be a gain for the ozone but not for the coils. See also L. Rossi at the 3 rd TLEP workshop (January 2013) TLEP 80 km