Download presentation
Presentation is loading. Please wait.
Published byShavonne Johnston Modified over 9 years ago
1
PROPOSED SCHOOL BUDGET 2013-2014 SCHOOL YEAR
2
BUDGET SUMMARY GENERAL FUND2012-20132013-2014Increase/Decrease WITHDRAW CAP RESERVE$150,000$275,000$125,000 SURPLUS$479,430$275,955($203,475) LOCAL TAX LEVY$13,678,927$14,110,079$431,152 or 3.15% MISCEL. REVENUE$165,000$180,000$15,000 TUITION REVENUE$100,000$0($100,000) EXTRAORDINARY AID$0$116,728 STATE AID$735,696$811,293$75,597 TOTAL$15,309,053$15,769,055$460,002 or 3 % DEBT SERVICE2012-20132013-2014Increase/Decrease SURPLUS $1 0 LOCAL TAX LEVY$494,012$519,918$25,906 TOTAL$494,013$519, 919$25,906
3
SOURCES OF REVENUE
4
HOW ARE THE DISTRICT’S FUNDS SPENT:
5
ENROLLMENT HISTORY
6
COMPARATIVE SPENDING Total Comparative Cost Per Pupil 2013-2014 Source: School District Budget Statement Woodland Park BOE$12,531 Totowa BOE$14,613 Little Falls BOE$14,449
7
BUDGET POINTS Proposed budget stays within state tax cap Shifts existing resources by eliminating and adding positions for more effective educational programs Adds (1)new PE/Health teacher for Charles Olbon and Memorial Schools Adds new part-time K-2 art teacher Adds new part-time technology support position(2 days per week)
8
BUDGET POINTS Continued Eliminates 6 part time aide positions Eliminates 1 part time Basic Skills teacher position Reduces 1 grade 3 class and increases 1 grade 2 class to align with enrollment Begin to phase in wireless computer network district wide Allows for 7.6% increase in health insurance benefits net of employee contributions
9
PLANS FOR 2013-2014 Continuation of training for staff for the implementation of Common Core Standards in English Language Arts and Math. Continuation of our Readers and Writers Workshop Program. Attendance of Teachers at the Columbia Teachers College Readers and Writers Summer Institute for intensive training.
10
PLANS FOR 2013-2014 Development of new middle school schedule to foster the middle school philosophy. Preparation for PARCC for the 2014-2015 School Year. Implementation of Linkit!, a strategic data driven instruction based program for Math and ELA and evaluation system that pin-points areas of need for each student, from grades two to eight.
11
PLANS FOR 2013-2014 Continuation of a Math Lab and institution of an English Language Arts Lab at Memorial School. Continuation of Peer Tutoring, ESL Tutoring, and Articulation with PVHS. Continuation of Professional Learning Communities and meaningful articulation across district schools. Continuation of ongoing training for district staff with a Literacy Consultant
12
FACILITY HIGHLIGHTS REALIZED IN 2012-2013 Memorial School First full year operation of new Cafeteria at Memorial School -Food Service program operated without subsidy Major flood restoration project completed for interior of school -Classroom floors, doors, painting, gym floor, science labs, library New front entrance, signage, HVAC, parking lot expansion
13
FACILITY HIGHLIGHTS REALIZED IN 2012-2013 Continued Beatrice Gilmore School - Four classroom addition, renovations, parking lot expansion Charles Olbon School - Three classroom addition, HVAC system, window shades
14
FACILITY IMPROVEMENTS PLANNED FOR 2013-20 14 Charles Olbon School -Parking lot expansion to start May 1, 2013 Administration Building – New flooring and interior painting
15
TAX IMPACT Property taxes for the average home assessed at $364,724 local school tax will increase from $3,073 to $3176 or $ 103 per year – $ 8.58 per month TAX CALCULATION: tax rate increases from $.8428 per hundred to $.8710 cents per hundred(Residents must plug in homes assessed value then divide by 100 times.8710 for local school tax)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.