1 AMBER Areal Mean Basin Estimated Rainfall COMAP Symposium 00-3 Robert S. Davis, Pittsburgh WFO Presented by Tom Filiaggi
2
2 AMBER Overview AMBER Overview All watersheds in county warning area are defined to a Minimum Basin Area (MBA) of 2 mi 2 to show spatial rainfall distribution.All watersheds in county warning area are defined to a Minimum Basin Area (MBA) of 2 mi 2 to show spatial rainfall distribution. The WSR-88D polar grid (1 o by 1km) is mapped to the defined watersheds.The WSR-88D polar grid (1 o by 1km) is mapped to the defined watersheds. Average Basin Rainfall (ABR) is computed for each watershed every volume scan.Average Basin Rainfall (ABR) is computed for each watershed every volume scan. An hourly ABR rate is determined from the single volume scan (5-6 min.) of ABR.An hourly ABR rate is determined from the single volume scan (5-6 min.) of ABR.
3
3 National Basin Delineation 30Sep1999 – NWS agrees to fund the AMBER National Basin Delineation project by NSSL for all of the United States.30Sep1999 – NWS agrees to fund the AMBER National Basin Delineation project by NSSL for all of the United States. ArcInfo used to define the watershed boundaries.ArcInfo used to define the watershed boundaries. USGS 1 arc second (30 m) DEM data supplied by EROS Data Center.USGS 1 arc second (30 m) DEM data supplied by EROS Data Center. www.nssl.noaa.gov/teams/western/basinswww.nssl.noaa.gov/teams/western/basins
4
4
5
5
6
6
7
7
8
8 AMBER Watershed Division All watersheds in the county warning area are divided into hydrologic segments no larger than 10 mi 2.All watersheds in the county warning area are divided into hydrologic segments no larger than 10 mi 2. A Minimum Basin Area of 2 mi 2 is used in the initial NSSL stream creation procedure.A Minimum Basin Area of 2 mi 2 is used in the initial NSSL stream creation procedure. Each forecast office may modify the NSSL stream database (subdivide or aggregate).Each forecast office may modify the NSSL stream database (subdivide or aggregate).
9
9 AMBER 10 mi 2 Watersheds Operational 01May1985Operational 01May1985 Basins defined on “Fishing stream map of Pennsylvania.Basins defined on “Fishing stream map of Pennsylvania. Color Graphics display of WSR-57 rainfall estimates RADAP-II data (2 o x 1 nm grid)Color Graphics display of WSR-57 rainfall estimates RADAP-II data (2 o x 1 nm grid) 36 county map backgrounds with overlay of defined streams watersheds.36 county map backgrounds with overlay of defined streams watersheds. No ABR computation.No ABR computation.
10
10
11
11
12
12
13
13
14
14 Little Pine Creek Stage (ft) 30May1986 (UTC)
15
15
16
16 DHR WSR-88D Bin Assignment Polar grid 1 o by 1km DHR grid is mapped to all defined watershed segments. This allows ABR computation in 5-6 minute time steps.DHR grid is mapped to all defined watershed segments. This allows ABR computation in 5-6 minute time steps. DHR grid is mapped to all defined Urban Areas to compute ABR urban rainfall.DHR grid is mapped to all defined Urban Areas to compute ABR urban rainfall. Single 1km DHR bins are assigned to location of all rain gages, allowing gage comparison with radar estimated rainfall.Single 1km DHR bins are assigned to location of all rain gages, allowing gage comparison with radar estimated rainfall.
17
17
18
18
19
19 Pine Creek Aftermath RADAP-II provided excellent rainfall estimates for bucket survey gages and for ABR in watersheds down to 3mi 2.RADAP-II provided excellent rainfall estimates for bucket survey gages and for ABR in watersheds down to 3mi 2. Disaster survey team recommended that a 1-hour flash flood guidance (FFG) be initiated.Disaster survey team recommended that a 1-hour flash flood guidance (FFG) be initiated. Analysis of flash flood watersheds needed to be reduced from 10 mi 2 to at least 3mi 2.Analysis of flash flood watersheds needed to be reduced from 10 mi 2 to at least 3mi 2.
20
20 AMBER 3 mi 2 Watersheds Operational 01May1990 (RADAP-II data)Operational 01May1990 (RADAP-II data) MBR and ABR computations.MBR and ABR computations. 01June1993 WSR-88D Installed.01June1993 WSR-88D Installed. Operational 01May1996 (WSR-88D data)Operational 01May1996 (WSR-88D data) Watershed analysis accomplished on 7.5 minute topographic maps and MBA reduced to 3 mi 2.Watershed analysis accomplished on 7.5 minute topographic maps and MBA reduced to 3 mi 2. ABR computations only.ABR computations only.
21
21 Flash Flood Threat and ABR Severity of flash flooding is directly related to the observed ABR in a watershed.Severity of flash flooding is directly related to the observed ABR in a watershed. The time period of the ABR determines the ABR rate. The higher the ABR rate, the greater the risk of serious flash flooding.The time period of the ABR determines the ABR rate. The higher the ABR rate, the greater the risk of serious flash flooding. ABR varies as function of watershed area. As watershed area increases, ABR and ABR rate tend to decrease.ABR varies as function of watershed area. As watershed area increases, ABR and ABR rate tend to decrease.
22
22 FF Scale for Flash Flooding ABR in inches FF0 ABR = FFG to < FFG + 0.5FF0 ABR = FFG to < FFG + 0.5 FF1 ABR = FFG + 0.5 to < FFG + 1.5FF1 ABR = FFG + 0.5 to < FFG + 1.5 FF2 ABR = FFG + 1.5 to < FFG + 2.5FF2 ABR = FFG + 1.5 to < FFG + 2.5 FF3 ABR = FFG + 2.5 to < FFG + 3.5FF3 ABR = FFG + 2.5 to < FFG + 3.5 FF4 ABR = FFG + 3.5 to < FFG + 4.5FF4 ABR = FFG + 3.5 to < FFG + 4.5 FF5 ABR = FFG + 4.5 to < FFG + 5.5FF5 ABR = FFG + 4.5 to < FFG + 5.5 FF6 ABR = FFG + 5.5 or higher.FF6 ABR = FFG + 5.5 or higher.
23
23 ABR Rate Based on 5-6 minute observed ABR.Based on 5-6 minute observed ABR. Hourly ABR Rate = ABR x 3600/vsec, where vsec= the number of seconds in the volume scan.Hourly ABR Rate = ABR x 3600/vsec, where vsec= the number of seconds in the volume scan. ABR Rate is used to identify watersheds currently receiving the heaviest rainfall, before the flash flood producing accumulation occurs.ABR Rate is used to identify watersheds currently receiving the heaviest rainfall, before the flash flood producing accumulation occurs.
24
24 AMBER Z/R Gage Comparison The single 1km DHR bin that contains the rain gage is used to compute the radar rainfall estimate.The single 1km DHR bin that contains the rain gage is used to compute the radar rainfall estimate. Tropical vs. Standard Z/R usage can be estimated using 15 minute gage data.Tropical vs. Standard Z/R usage can be estimated using 15 minute gage data. Gage comparisons should be done to verify validity of the WSR-88D rainfall estimates.Gage comparisons should be done to verify validity of the WSR-88D rainfall estimates.
25
25 Pitcairn, PA Flash Flood 01-02July1997
26
26
27
27
28
28
29
29
30
30 Aber’s Creek #5328 01July1997 10.8mi 2
31
31 Thompson Run #6306 01July1997 2.4mi 2
32
32 Thompson Run Flooding Three feet of water was reported on Route 22 near the outflow of Thompson Run into Aber’s Creek at 2320UTC.Three feet of water was reported on Route 22 near the outflow of Thompson Run into Aber’s Creek at 2320UTC. Route 22 is the main parkway through the eastern suburbs of Pittsburgh.Route 22 is the main parkway through the eastern suburbs of Pittsburgh. The road was closed for almost an hour due to the high water.The road was closed for almost an hour due to the high water.
33
33
34
34 Dirty Camp Run #5323 01July1997 3.3mi 2
35
35 Dirty Camp Run(2) #6305 01July1997 1.5mi 2
36
36 Dirty Camp Run(1) #6304 01July1997 1.8mi 2
37
37 Dirty Camp Run(1-2) #6304/5 01July1997 ABR Rates
38
38
39
39
40
40 Pitcairn Flash Flooding About 10 million dollars of flood damage occurred in the city of Pitcairn.About 10 million dollars of flood damage occurred in the city of Pitcairn. Residents in Pitcairn reported that Dirty Camp Run was up near bankfull before the heavy rain began in town.Residents in Pitcairn reported that Dirty Camp Run was up near bankfull before the heavy rain began in town. The peak of the flooding in Pitcairn occurred from 01July/2330 UTC to 02July/0030 UTC.The peak of the flooding in Pitcairn occurred from 01July/2330 UTC to 02July/0030 UTC.
41
41 Tropical Z/R Cases Standard Z/R: Z = 300R 1.4Standard Z/R: Z = 300R 1.4 Tropical Z/R: Z = 250R 1.2Tropical Z/R: Z = 250R 1.2 Maximum Rate Cap 5.0 in/hr?Maximum Rate Cap 5.0 in/hr? Tropical Storm not required!!!Tropical Storm not required!!!
42
42 Standard and Tropical Z/R
43
43 Conclusions Small watersheds definition is the key to detection of flash flooding.Small watersheds definition is the key to detection of flash flooding. ABR Rate gives early warning for flash flood potential.ABR Rate gives early warning for flash flood potential. Time duration of rainfall display impacts forecaster perception of flash flood threat.Time duration of rainfall display impacts forecaster perception of flash flood threat. User selectable time window needed.User selectable time window needed.
44
44 AMBER Summary ABR provides basin specific rainfall to determine flash flood risk (ABR-FFG)ABR provides basin specific rainfall to determine flash flood risk (ABR-FFG) ABR rate focuses forecaster attention on critical streams before flooding occurs.ABR rate focuses forecaster attention on critical streams before flooding occurs. History of ABR helpful in adjusting FFG for multiple rainfall events.History of ABR helpful in adjusting FFG for multiple rainfall events. Basin specific ABR allows forecaster to mention “threat area” in warning text.Basin specific ABR allows forecaster to mention “threat area” in warning text.
45
45 AMBER Data Sources ArcView and the spatial analyst extension. www.esri.comArcView and the spatial analyst extension. www.esri.com USGS Data (3 arc second DEM data) edcwww.cr.usgs.govUSGS Data (3 arc second DEM data) edcwww.cr.usgs.gov EPA Data (RF3 data files) www.epa.gov/OST/BASINS/gisdata.htmlEPA Data (RF3 data files) www.epa.gov/OST/BASINS/gisdata.html Ami Arthur aarthur@enterprise.nssl.noaa.govAmi Arthur aarthur@enterprise.nssl.noaa.gov Paul.Jendrowski@noaa.gov (SOO KHNL)Paul.Jendrowski@noaa.gov (SOO KHNL)
46
46 AMBER Case Studies ftp 198.206.50.10 public buff.ppt 13Jul96buff.ppt 13Jul96 epgh99.ppt 18May99epgh99.ppt 18May99 pitcairn.ppt 01Jul97pitcairn.ppt 01Jul97 zion.ppt 27Jul98zion.ppt 27Jul98 ohio98.ppt 26Jun98ohio98.ppt 26Jun98 dallas95.ppt 05May95dallas95.ppt 05May95 ftc97.ppt 28Jul97ftc97.ppt 28Jul97 kc1998.ppt 04Oct98kc1998.ppt 04Oct98 Buffalo Creek, COBuffalo Creek, CO Pittsburgh, PAPittsburgh, PA Cedar City, UTCedar City, UT Eastern OhioEastern Ohio Dallas, TXDallas, TX Fort Collins, COFort Collins, CO Kansas City, MOKansas City, MO
Similar presentations