The ecar Ireland Project Smart Grid Technology Watch Event September 18th 2014 John Whelan, ESB ecars
2
Agenda The ecar Ireland Project – Conception
Electric Vehicles in Ireland Charge Point Infrastructure Charge Point Management System Grid Impacts
3
Agenda The ecar Ireland Project – Conception
Electric Vehicles in Ireland Charge Point Infrastructure Charge Point Management System Grid Impacts
4
Ecar Ireland Program Government targets 2020
- 10% of all vehicles electric - 10% of all road energy transport will be renewable Early supply of electric cars MOU signed with Mitsubishi, Renault-Nissan and Toyota Government incentives €5000 grant Zero VRT Lowest road tax band Accelerated Capital Allowance (Businesses) Government taskforce to deliver other incentives ESB is rolling out the infrastructure
5
Ireland as a Test Bed for Electric Vehicles
Large wind penetration Limited range between cities Type of homes Good climate for batteries Single network company
6
CO2 Emissions Internal Combustion Engine End of chain emissions 2010
2015 150 g/km 130 g/km Electricity Generation COAL 130 g/km GAS 50 g/km WIND 0 g/km
7
Agenda The ecar Ireland Project – Conception
Electric Vehicles in Ireland Charge Point Infrastructure Charge Point Management System Grid Impacts
8
Electric Vehicles in ESB’s Fleet
Old Electric Vehicles from Current Electric Vehicles – Allied Peugeot / Micro-vett Fiat Fiorino / Smiths Edison
9
Electric Vehicles Available in Ireland
Mitsubishi iMiEV Nissan Leaf Mitsubishi Outlander Renault Kangoo Renault Zoe BMW i3
10
Other Electric Vehicles in Ireland
Smiths Newton (Celtic Linen) Smiths Newton (Grange Builders Providers) Smiths Newton (OPW)
11
All Major Car Manufacturers Have EV Programs
12
EV Components Battery Pack Inverter Charger + DC-DC Converter AC Motor
13
Agenda The ecar Ireland Project – Conception
Electric Vehicles in Ireland Charge Point Infrastructure Charge Point Management System Grid Impacts
14
Charging Infrastructure
HOME / WORK PUBLIC FAST 6 – 8 hours 1 – 2 hours 80% in 20 minutes
15
Home Charge Points First 2000 installed for free
16/32 amps, single-phase Fed from customer distribution board
16
Public AC Charge Points
22kW double socket (three-phase 32 amps) RFID card reader GPRS communications with back office Internal MID metering
17
Fast Charge Points DC – CHAdeMO 50kW DC/AC – CCS 50kW Fast AC – 44kW
18
Ireland’s Current Charge Point Network
851 – Domestic and Commercial Charge Points 805 – AC Public Charge Points 61 – Fast Charge Points Total
19
Agenda The ecar Ireland Project – Conception
Electric Vehicles in Ireland Charge Point Infrastructure Charge Point Management System Grid Impacts
20
Back Office
21
Agenda The ecar Ireland Project – Conception
Electric Vehicles in Ireland Charge Point Infrastructure Charge Point Management System Grid Impacts
22
Power Quality Measurements
23
Charging Profiles (Slow AC) – Nissan Leaf
24
Charging Profiles (Fast DC) – Nissan Leaf – DBT FCP
25
Macro Level Grid Impacts
26