18 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Spoilage, Rework, and Scrap Chapter 18
2
18 - 2 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 1 Distinguish among spoilage, rework, and scrap.
3
18 - 3 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Terminology Spoilage refers to unacceptable units discarded or sold for reduced prices. Rework is units that are repaired. Scrap is material left over.
4
18 - 4 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 2 Describe the accounting procedures for normal and abnormal spoilage.
5
18 - 5 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Normal Spoilage Normal spoilage is spoilage that is an inherent result of the particular production process and arises even under efficient operating conditions. Normal spoilage rates should be computed using total good units completed as the base, not total actual units started in production.
6
18 - 6 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Abnormal Spoilage Abnormal spoilage is spoilage that should not arise under efficient operating conditions. Companies record the units of abnormal spoilage and keep a separate Loss from Abnormal Spoilage account.
7
18 - 7 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Process Costing and Spoilage Example Big Mountain, Inc., manufactures skiing accessories. All direct materials are added at the beginning of the production process. In October, $95,200 in direct materials were introduced into production. Assume that 35,000 units were started, 30,000 good units were completed, and 1,000 units were spoiled (all normal spoilage).
8
18 - 8 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Process Costing and Spoilage Example Ending work in process was 4,000 units (each 100% complete as to direct material costs). Spoilage is detected upon completion of the process. Spoilage is typically assumed to occur at the stage of completion where inspection takes place.
9
18 - 9 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Process Costing and Spoilage Example Approach A recognizes spoiled units when computing output in equivalent units. Approach B does not count spoiled units when computing output in equivalent units.
10
18 - 10 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Approach A Example Costs to account for$95,200 Divide by equivalent units 35,000 Cost per equivalent unit$ 2.72 Good units completed: 30,000 × $2.72$81,600 Add normal spoilage: 1,000 × $2.72 2,720 Costs of good units transferred out$84,320 Work in process: 4,000 × $2.72 10,880 Costs accounted for$95,200
11
18 - 11 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Approach B Example Costs to account for$95,200 Divide by equivalent units 34,000 Cost per equivalent unit$ 2.80 Good units completed: 30,000 × $2.80$84,000 Costs of good units transferred out$84,000 Work in process, ending: 4,000 × $2.80 11,200 Costs accounted for$95,200
12
18 - 12 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 3 Account for spoilage in process costing using the weighted-average method.
13
18 - 13 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Weighted-Average: Spoilage The following example is for the month of November and relates to Big Mountain, Inc. Direct materials are introduced at the beginning of the production cycle. Conversion costs are added evenly during the cycle.
14
18 - 14 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Weighted-Average: Spoilage Normally the spoiled units are 2% of the output. Assume that Big Mountain, Inc., had 1,000 units in the beginning work in process inventory, 100% complete for materials ($9,700), and 60% complete for conversion ($10,000).
15
18 - 15 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Weighted-Average: Spoilage Ending work in process inventory was 4,000 units (100% materials and 20% conversion). Costs added during the month were $87,500 for materials and $72,000 for conversion. What are the costs assigned to the units completed, spoiled, and in ending work in process inventory?
16
18 - 16 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Physical Units (Step 1) Work in process, beginning (November 1) 100% material, 60% conversion costs 1,000 Started during November:35,000 36,000 Good units completed and transferred out:31,000 Work in process, ending inventory: 100% material 20% conversion costs 4,000 35,000
17
18 - 17 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Physical Units (Step 1) What is the number of spoiled units? 36,000 – 35,000 = 1,000 What is the normal spoilage? 31,000 × 2% = 620 What is the abnormal spoilage? 1,000 – 620 = 380
18
18 - 18 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Compute Equivalent Units (Step 2) Materials Conversion Completed and transferred31,00031,000 Normal spoilage 620 620 Abnormal spoilage 380 380 Ending inventory 4,000 800 Equivalent units36,00032,800 100%20%
19
18 - 19 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Compute Equivalent Unit Costs (Step 3) Materials Conversion Beginning inventory$ 9,700$10,000 Current costs 87,500 72,000 Total$97,200$82,000 Equivalent units 36,000 32,800 Cost per unit $2.70 $2.50
20
18 - 20 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Summarize Total Costs (Step 4) Work in process beginning inventory: Materials$ 9,700 Conversion 10,000 Total beginning inventory$ 19,700 + Current costs: Materials $87,500 Conversion 72,000 = Costs to account for$179,200
21
18 - 21 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Good units completed and transferred out (31,000 units): Costs before adding normal spoilage: 31,000 × ($2.70 + $2.50) $161,200 Normal spoilage: 620 × ($2.70 + $2.50) 3,224 Total$164,424
22
18 - 22 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Abnormal spoilage: 380 × ($2.70 + $2.50)$ 1,976 Work in process, ending (4,000 units): Direct materials (4,000 × $2.70)$10,800 Conversion (800 × $2.50) 2,000 Total$12,800
23
18 - 23 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Costs of units completed and transferred out (including normal spoilage)$164,424 Cost of abnormal spoilage 1,976 Costs in ending inventory 12,800 Total costs accounted for$179,200 The $1,976 cost of abnormal spoilage is assigned to the Loss from Abnormal Spoilage account.
24
18 - 24 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 4 Account for spoilage in process costing using the first-in, first-out (FIFO) method.
25
18 - 25 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Physical Units (Step 1) Work in process, beginning (November 1): 100% material, 60% conversion costs 1,000 Started during November35,000 36,000 Good units completed and transferred out: From beginning inventory 1,000 Started and completed30,000 31,000
26
18 - 26 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Physical Units (Step 1) Work in process, ending inventory: 100% material, 20% conversion costs4,000 Normal spoilage 620 Abnormal spoilage 380
27
18 - 27 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Compute Equivalent Units (Step 2) Materials Conversion Good units completed and transferred out: From beginning inventory 0 400 Started and completed30,00030,000 Normal spoilage 620 620 Abnormal spoilage 380 380 Ending inventory 4,000 800 Equivalent units35,00032,200
28
18 - 28 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Compute Equivalent Unit Costs (Step 3) Materials Conversion Current costs$87,500$72,000 Divided by equivalent units 35,000 32,200 Cost per unit $2.50 $2.236* *$2.236 (rounded)
29
18 - 29 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Summarize Total Costs (Step 4) Work in process beginning inventory: Materials$ 9,700 Conversion 10,000 Total beginning inventory$ 19,700 + Current costs: Materials$ 87,500 Conversion 72,000 = Costs to account for:$179,200
30
18 - 30 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Good units completed and transferred out: From beginning inventory: Work in process$ 19,700.00 Conversion costs added in current period (400 × $2.236) 894.40 Total$ 20,594.40 Started and completed: 30,000 × ($2.50 + $2.236)$142,080.00
31
18 - 31 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Costs before adding normal spoilage: ($20,594.40 + $142,080.00)$162,674.40 Normal spoilage: 620 × ($2.50 + $2.236) 2,936.32 Total$165,610.72
32
18 - 32 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Abnormal spoilage: 380 × ($2.50 + $2.236)$1,799.68 Work in process, ending (4,000 units): Direct materials (4,000 × $2.50)$10,000 Conversion (800 × $2.236) 1,789 Total$11,789
33
18 - 33 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Assign Total Costs (Step 5) Costs of units completed and transferred out (including normal spoilage)$165,610.72 Cost of abnormal spoilage 1,799.68 Costs in ending inventory 11,789.00 Total costs accounted for$179,200.00 The $1,799.68 costs of abnormal spoilage are assigned to the Loss from Abnormal Spoilage account.
34
18 - 34 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 5 Account for spoilage in process costing using the standard-costing method.
35
18 - 35 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Standard-Costing: Spoilage The standard-costing method makes calculating equivalent unit costs unnecessary and so simplifies process costing.
36
18 - 36 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Journal Entries Assume that the completed units are transferred to Finished Goods. What are the journal entries? Finished GoodsXXX Work in ProcessXXX To transfer good units completed in November
37
18 - 37 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Journal Entries Loss from Abnormal SpoilageXXX Work in ProcessXXX To recognize abnormal spoilage detected in November
38
18 - 38 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 6 Account for spoilage in job costing.
39
18 - 39 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage With a job-costing system, companies can decide to assign normal spoilage to specific jobs. Alternatively, they can allocate normal spoilage to all jobs as part of manufacturing overhead. Loss from abnormal spoilage is recorded as a cost of the period.
40
18 - 40 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage Assume that 5 parts out of 40 parts of Whitefish Machine Shop’s Job #10 are spoiled (normal). Costs assigned prior to the inspection point are $1,000 per part. The current disposal price of the spoiled parts is $200 per part. When the spoilage is detected, the spoiled goods are inventoried at $200 per part.
41
18 - 41 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage Normal spoilage attributable to a specific job: When normal spoilage occurs because of the specifications of a particular job, that job bears the cost of the spoilage reduced by the current disposal value of that spoilage. What is the journal entry?
42
18 - 42 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage Materials Control (spoiled goods at current disposal value): 5 × $2001,000 Work in Process Control (Job #10)1,000 To recognize disposal value of spoiled parts
43
18 - 43 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage Work in Process (Job # 10) Parts 40,000Parts 1,000 (40 × $1,000)(5 × $200) Balance 39,000 What is the total cost of the 35 good units? (35 × $1,000) + (5 × $800) = $39,000
44
18 - 44 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage Normal spoilage common to all jobs: In some cases, spoilage may be considered a normal characteristic of a given production cycle. The spoilage is not charged to a specific job. What is the journal entry?
45
18 - 45 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage Materials Control (spoiled goods at current disposal value): 5 × $2001,000 Manufacturing Overhead Control (normal spoilage)4,000 Work in Process Control (Job #10)5,000 To recognize spoiled parts
46
18 - 46 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage Abnormal spoilage: If the spoilage is abnormal, the net loss is highlighted and always charged to an abnormal loss account. Assume that the 5 parts of Whitefish Machine Shop’s Job #10 are considered abnormal spoilage. What is the journal entry?
47
18 - 47 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Job Costing: Spoilage Materials Control (spoiled goods at current disposal value): 5 × $2001,000 Loss from Abnormal Spoilage4,000 Work in Process Control (Job #10)5,000 To recognize spoiled parts
48
18 - 48 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 7 Account for rework in job costing.
49
18 - 49 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Rework Units Example Normal rework attributable to a specific job: Assume that the 5 parts of Whitefish Machine Shop’s Job #10 can be reworked for a total cost of $1,800. $5,000 of costs associated with these parts have already been assigned to Job #10 before rework. What is the journal entry?
50
18 - 50 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Rework Units Example Work in Process (Job #10) 1,800 Various Accounts 1,800 To charge rework costs to the job Normal rework common to all jobs: Debit Manufacturing Overhead Control (rework costs). Abnormal rework: Debit Loss from Abnormal Rework.
51
18 - 51 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Learning Objective 8 Account for scrap.
52
18 - 52 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Recognizing Scrap Scrap is recognized in the accounting records either at the time of its sale or at the time of its production. Sale of scrap, if immaterial, is often recognized as other revenues.
53
18 - 53 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Recognizing Scrap Example Assume that Job #10 of Whitefish Machine Shop generates normal scrap with a total sales value of $300 (it is assumed that the scrap returned to the storeroom is sold quickly). Recognizing scrap at the time of its sale: What is the journal entry?
54
18 - 54 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Recognizing Scrap Example Cash or Accounts Receivable 300 Sales of Scrap 300 To record other revenue sale of scrap Scrap attributable to a specific job: Job-costing systems sometimes trace the sale of scrap to the jobs that yielded the scrap. Assume that the scrap can be traced specifically to Job #10.
55
18 - 55 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Recognizing Scrap Example What is the journal entry? Cash or Accounts Receivable300 Work in Process (Job #10)300 To record sale of scrap Scrap common to all jobs: Cash or Accounts Receivable300 Manufacturing Overhead Control300 To record other revenue sale of scrap
56
18 - 56 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Recognizing Scrap Example Assume that the scrap is inventoriable. What is the journal entry when scrap is attributable to Job #10 and it is returned to the storeroom? Materials Control300 Work in Process (Job #10)300 To record scrap returned to stores
57
18 - 57 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Recognizing Scrap Example What is the journal entry when scrap is common to all jobs and it is returned to the storeroom? Materials Control300 Manufacturing Overhead Control300 To record scrap returned to stores
58
18 - 58 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Recognizing Scrap Example What is the journal entry when scrap is sold? Cash or Accounts Receivable300 Materials Control300 To record other revenue sale of scrap
59
18 - 59 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Recognizing Scrap Example What is the journal entry when scrap is reused? Work in Process Control300 Materials Control300 To record use of scrap
60
18 - 60 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster End of Chapter 18