Presentation is loading. Please wait.

Presentation is loading. Please wait.

Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast.

Similar presentations


Presentation on theme: "Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast."— Presentation transcript:

1 Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast Europe Business Forum 22-23. November, Istanbul THE REPUBLIC OF SERBIA MINISTRY OF TRANSPORT

2 Five major trans-national axes

3 Seeto Map

4 Transport Master Plan 2010-2027 Estimates for the 15-20 year-periodEUR mil Rehabilitation of Corridor 10. 730.0 Reconstruction and modernisation – electrification – construction of the second track on Corridor 10. 2,600.0 ERTMS level 2 on Corridor 10. 170.0 Rehabilitation of other railways 1,200.0 New projects 400.0 Total 5,100.0 Total, Corridor 10. (without indirect costs, expropriation costs and project documentation) 3,500.0

5 Ongoing and future projects EBRD – 100 mil e – procurement new EMU EBRD – 65 mil e - multi lokomotives EIB – 80 mil e – Lines on Corridor 10. EIB – 200 mil e - Stara Pazova – Novi Sad EBRD – 35 mil e - row material for 112 km on Coridor 10. Ebrd – 95 mil e - 130 km on Corridor 10. Russion loan - 800 mil e Kuwait loan - 27 mil e Intermodal terminal – 20 mil e

6 Tender for project Procurement of 25 EMU for passenger transport has been finished. The project is financed from EBRD loan in the amount of 100 million euros Preparation of tender documentation for 15 multi-system electric locomotives in the amount of 65 million euros, financed by EBRD. Project rehabilitation and modernization on the sections of the Corridor 10. network (Gilje - Cuprija - Paracin) finance by EIB in the amount of 41 million euros, is ongoing. Very soon will be publish tender for Supply of Equipment and Execution of the Works of the Electrotechnical Facilitieson this section.

7 For the Project of rehabilitation truck along key sections of Corridor X (112 km) was published the Public Invitation to submit bids in August 2012, in the amount of 30 million Euros, financed by EBRD. For Procurement of mechanizations for track maintenance was also published the Public Invitation to submit bids in August 2012, in the amount of 5 million Euros, financed by EBRD.

8 Preparation of main project for Renewal of the Section Beograd - Rakovica – Resnik, as well as the Rehabilitation of sections along Corridor X (approximately 116 km of truck), in the amount of 95 million Euros, financed by EBRD. Negotiation for the Project on modernization of the railway line on section Stara Pazova - Novi Sad with EIB, in the amount of 200 million Euros is ongoing.

9 9 Overhauled single track electrified sections Newly electrified single track sections Double track lines Russion loan - $ 800 million for: Construction of the line Belgrade-Pancevo (55 million Euros) Rehabilitation 6 sections along Corridor 10. of 112 km of truck (55 million Euros) Reconstruction of the railway Belgrade-Bar (200 million Euros) New line construction Valjevo-Loznica (270 million Euros) and Procurement of diesel trains (75 million Euros).

10 It is anticipated signing in December of the Loan and Guarantee Agreement with the Kuwait Fund for Arab Economic Development, in the amount of 27 million euros, for the construction of Belgrade Center-Prokop (Phase 1). The project comprises the construction of phase 1 of the new Belgrade Centre Railway Station in Prokop with an area of about 37,000 square meters containing 8 main railway tracks with 4 sidings, 5 platforms with two connecting subways, metro tunnel structure underneath the station, technical control post and passenger services, in addition to electrical and mechanical works for trains and passenger related services and utility infrastructures.

11 The Preliminary Project Feasibility Study for the construction of the intermodal terminal in Batajnica, financed by IPA 2008 in the amount of 2 million Euros, is finished in April 2012. After that, we are expecting support EU funds of 85% for construction of the intermodal terminal in Batajnica with estimated value of 15,5 million Euros. Future intermodal terminal will have a direct connection with Corridor 10. will be connected with the railway station in Batajnica. Surface of intermodal terminal with access roads is about 13 ha. Near intermodal terminal is planned development of the logistics center on surface of about 80 ha.

12 Thank You for Your Attention


Download ppt "Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast."

Similar presentations


Ads by Google