Presented to Wisconsin Department of Transportation presented by Brian Scott SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07 ITS Sketch Plans Corridor.

Similar presentations


Presentation on theme: "Presented to Wisconsin Department of Transportation presented by Brian Scott SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07 ITS Sketch Plans Corridor."— Presentation transcript:

1 presented to Wisconsin Department of Transportation presented by Brian Scott SRF, SEH, EK and Cambridge Systematics, Inc. 7/31/07 ITS Sketch Plans Corridor Sketch Plan Methodology – Update

2 1 Agenda Schedule/Progress Management Update – John Corbin Presentation – Sketch Planning Update - SRF, EK, SEH Threshold Updates Deployment Density – Spectrum Update Corridor Examples −Beltline −Fox Valley −Capital Long Range Plan Input - Chris Hedden Next Steps

3

4 Management Update

5 Sketch Planning Update

6 Thresholds Update

7 6 Threshold Adjustment Original Adjusted

8 7 Process Raw Data Threshold Map Develop Raw Data Corridor Map Smooth Segments Analyze Smoothed Segments Apply Operations Oriented Recommendations (Mileposts) Next Steps Meeting with Regions – Operations Chiefs and Planning Chiefs Produce final maps and recommendations for all corridors

9 Deployment Density Update

10 9 Deployment Density – Urban Interstate/Expy

11 10 Deployment Density – Rural Interstate/Expy

12 11 Deployment Density – Urban and Rural Other

13 12 Beltline Corridor – Raw Threshold Data

14 13 Beltline Corridor – Smoothed Data

15 14 Beltline - Mileposts

16 15 Fox Valley Corridor – Raw Data

17 16 Fox Valley Corridor – Raw Data

18 17 Fox Valley Corridor

19 18 Fox Valley Corridor

20 19 Fox Valley – Milepost Adjustment Data

21 20 Fox Valley Corridor – Revised Mileposts

22 21 Fox Valley Corridor – Revised Mileposts

23 22 Fox Valley Corridor Insert SEH Methodology

24 23 Fox Valley Corridor – DMS

25 24 Capitol Corridor

26 25 Capitol Corridor - Signals

27 26 Statewide – Additional Information Layers RWIS Fiber optic cable State Patrol microwave network State Patrol MDN

28 Connection 2030 Input

29 28 Input into Connections 2030 LRP Submitted draft data set 7/23/07 Only red and orange links Table Text Suggested Sketch Planning data set Version 3.0 submitted Contains updated thresholds

30

31

32

33 Mid-Term (5-10 Years) US 29 Operations deployments recommended south of Fond du Lac MPA to milepost xxx. xXx OperationsImplement Operations technologies as recommended by WisDOT Operations Sketch Plan xxx

34 Next Steps

35 34 Statewide Map – Signals

36 35 Next Steps (Short Term) Complete SW and NE Region Maps Obtain consensus from WisDOT Regions & BHO Complete SE Region Maps Complete NW and NC Regions Data collection – existing systems & infrastructure

37 36 Next Steps (Mid – Term) Technology Scan Validate results in Regional workshops SE, NW, NC)

38 37 Next Steps (Finalize) Develop Infrastructure & Operations Plan Aggregate Plans (Freeways, Arterials, ATIS) Prioritize Corridors Integrate into existing WisDOT planning processes Apply recommendations to near-term corridor projects for implementation