An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.

Similar presentations


Presentation on theme: "An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary."— Presentation transcript:

1 An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary

2 Background Existing Conditions Study process Alternatives Approved Plan Lessons Learned Status Presentation Outline

3 Background An integral part of Calgary transportation network The original main street of Forest Lawn community A secondary highway with regional connections Transit corridor with high transit ridership 17 Avenue Southeast Corridor:

4 Background In 2007 - Land Use Planning & Policy (LUPP) initiated Southeast 17 Corridor Study, In 2009 – Transportation Planning advanced a Transportation Planning Study to: Support the land use Increase mobility choices Develop a Transit supportive corridor Optimize infrastructure Develop Complete Street Identify a transit corridor connecting to the downtown

5 Background Study Area

6 Background: Land Use and Transportation Skeletal Road Arterial Street Industrial Arterial Urban Boulevard Neighborhood Boulevard Parkway

7 Existing Conditions Segment Right-of-Way (m) AADT# of Lanes 26 – 36 St38 – 5129,150 4 – 6 lanes 36 – 52 St20 – 5123,100 4 lanes 52 – 68 St29 – 3825,750 4 lanes 68 – 84 St47 – 4915,850 4 lanes

8 Background Calgary

9 Existing Conditions Mode Mode Share Pass. over 2 hrs Drivers75%4,934 Passengers8%493 Transit17%1,140 Bicycle0%0 Pedestrian0%0 TOTAL100%6,568 Transit Mode Share WB Trips (2009 AM Peak)

10 Existing Conditions Transit Mode Share EB Trips (2009 AM Peak) Mode Mode Share Pass. over 2 hrs Drivers70%3,435 Passengers7%344 Transit23%1,140 Bicycle0%0 Pedestrian0%0 TOTAL70%3,435

11 Safety Concerns Disjointed and discontinuous sidewalks Inconsistent alignment and cross-section A single narrow sidewalk to accommodate active modes Lack of sidewalks and platforms at transit stations Access management issues Existing Conditions

12 Study Process The study process included : Development of a Shared Vision Brainstorming Sessions Stakeholder Consultation Public Information Sessions Development and Evaluation of Alternatives Conflict Resolution Lessons Learned Presentation to Council Final Report

13 Study Process Land Use: Character Areas Deerfoot to 36 St.36 St. to 54 St. 54 St. to Stoney

14 ALT 1: Median BRT with 4 Lanes of Traffic Alternatives

15 ALT 2: Curbside BRT with 4 lanes of traffic Alternatives

16 ALT 3: Median BRT with 2 Lanes of Traffic Alternatives

17 Alternatives Evaluation Based on the input received from the internal and external stakeholders, the alternatives were evaluated using the following multi factorial criteria: Safety Operations Alternative Modes Cost Social and Environmental Impacts Forest LawnInglewood Transit Improvement Operations and Safety Land Use and Community Impact Technical Feasibility Cost Implications

18 Approved Plan

19 Approved Plan: East of Deerfoot

20

21 Approved Plan Land Required to Support Future Development

22 A dedicated transitway Serves lands adjacent to Blackfoot Truck Stop Continues local transit through (9th Ave SE) Inglewood Connects to SE LRT alignment Long Term Approved Plan: West of Deerfoot

23 Approved Plan: West of Deerfoot – At Blackfoot truck Stop

24 Approved Plan: West of Deerfoot Short-Term Peak period peak direction transit lanes on 9th Ave S.E.

25 Lessons Learned Listen to your stakeholders Be prepared to talk Have open and candid discussions Every idea has a merit to be considered Hold a brainstorming session at the front end Include provision for unscheduled meetings Resolve issues through mini workshops PM to PM communication only ◦

26 Status Council directed Administration to: Evaluate and prioritize this project for inclusion in the next update of Transportation Infrastructure Improvement Plan (now Investing in Mobility), and Seek funding opportunities to advance the first phase of the project

27 Questions

28 Modified Alternative 1 East of Deerfoot

29 Modified Alternative 2 East of Deerfoot

30 Approved Plan: East of Deerfoot

31

32 Integration of land use and transportation Four lane road Median transit lanes Bike lanes A boulevard Sidewalk Access consolidation Angle parking Linear and pocket parks

33 Background Transportation: Street Palette

34 Cost Estimates

35 Consultation Visioning Exercise Brainstorming Sessions Stakeholder Consultation Conflict Resolution Study Process