Download presentation
Presentation is loading. Please wait.
Published byDarrell Floyd Modified over 9 years ago
1
District Two May 9, 2013 District Two May 9, 2013 Strategic Intermodal System Funding Strategy
2
2 nd Five 2019-2023 2019-2023 Long Range Cost Feasible Plan 2024-2040
3
A Partnership A Partnership
4
NFTPO No. 1 on SHS list. Locally Preferred Alternative shown
5
29510 95 301 95 First Coast Outer Beltway $1,380,000
6
29510 95 301 95 I-95 Corridor $79,258 $42,837
7
29510 95 301 95 I-95 Corridor $15,200
8
I-95 Corridor 29510 95 301 $70,000 in 2 nd Five 10 95
9
I-95 Corridor 29510 95 $55,000 95
10
29510 95 301 95 I-95 Corridor
11
WP Project No. 213323-1 I-95/I-295 North Interchange FYPhase Amount 2015RW$ 7,000,000 2016CST $130,000,000 95 295 17
12
I-95 Corridor 29510 95 301 95 $15,000
13
29510 95 301 95 I-10 Corridor $41,058 $45,367 $ 5,068 $64,209 $79,258 $234,960
14
29510 95 301 95 $58,503,000 in 2 nd Five Years
15
$70,392 $33,000 $168,279 $62,719 $16,148 $82,864
16
209658-4 Add lanes and Reconstruct WP Project No. 209658-4 I-295 (SR 9A) from I-95 to Dames Point Bridge FYPhaseAmount 2014ROW$ 4,013,000 2014ENV $ 3,225,000 2017 CST $123,670,000 209301-3 Add lanes and Reconstruct WP Project No. 209301-3 I-295 (SR 9A) from SR 9B to JTB FYPhaseAmount 2015RRU$ 3,250,000 2015 CST $29,366,000 WP Project No. 209301-4 I-295 (SR 9A) Dames Point Bridge to SR 202 JTB FYPhaseAmount Design underway 209301-4 Add lanes and Reconstruct Construction now funded in CF $165,411
17
Strategic Intermodal System Funding Strategy $1,288,200,000$1,288,200,000 Long Range Cost Feasible Plan 2024-2040 Transportation has a tremendous Economic impact
18
Florida Department of Transportation James G. Bennett, P.E. Urban Transportation Development Manager (904) 360-5646 James.Bennett@dot.state.fl.us THANK YOU!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.