1 TRF LIMITED (A TATA ENTERPRISE) COAL HANDLING PLANT PACKAGE JHARLI

2 1. Wagon Tipplers with Side Arm Chargers- 4 sets 2
1. Wagon Tipplers with Side Arm Chargers- 4 sets 2. Apron Feeders- 4 sets 3. Reversible Stacker cum Reclaimer- 2 nos 4. Crushers- 4 nos 5. Screens- 4 nos 6. Motorized Traveling Trippers- 6 nos 7. Automatic Sampling system- 2 sets 8. Passenger cum Goods elevators- 2 sets 9. Utilities such as dust extraction, dust suppression and ventilation.

3

4 Work Status- The highest building of CHP TP-5 has been completed in 58.0 mtr and Crusher House 37.0 mtr is 40 % completed approxly TRF is working on this project site 24X7. One 200 MT crane, one 100 MT crane, one 75 MT crane and Two 18 MT cranes have already been mobilized at the site, apart from seven 12 MT capacity hydra cranes. Mechanical work of Crusher House is also in progress Civil work of project is approxly near end.s The approximate manpower engaged at the site is 750 per day Mechanical erection of two wagon tippler is as under- Endring, Side Beam, Side Beam assembly, Cradle Assembly, Static Beweighbridge, Line shaft Assembly, Clamp, arm-4 nos., Hydraulic power pack, oil cooler pack is also erected till now.

5 CHP LAYOUT

6 OVERALL PLANNING AREAWISE/ ACTIVITYWISE FOR BALANCE WORK

7 OVERALL GALLERY AND TERSTLE PROGRAMME FOR CHP

8 NEXT

9 Erection in Progress in Con-5A/B on March’09

10 after some time

11 CON-5A/B ERECTION

12 Up Next is ………

13 TP-5 ERECTION ON MARCH’09

14 after some time

15 TP-5 ERECTION ON APRIL’09

16 after some time

17 TP-5 ERECTION ON JANUARY’10

18 Crusher House ERECTION

19 1. 100% Safety comply at our Civil Agency
Safety Tips:- 1. 100% Safety comply at our Civil Agency 2. 98% Safety comply at our Structural Agency 3. Safety Training held at site 4. Celebrated 4th March as Safety Day 9. Safety Banners and Safety Board distributed at site

20

21

22 THANK YOU THANK YOU THANK YOU THANK YOU THANK YOU sunil sharma THANK YOU THANK YOU