Download presentation
Presentation is loading. Please wait.
Published byMatilda Butler Modified over 9 years ago
1
1 COALTRANSPORTATIONON INDIAN RAILWAYS
2
TRANSPORTATION IS A DERIVED DEMAND & DEPENDS UPON THE GROWTH OF ECONOMY. RAILWAY FREIGHT BUSINESS LARGELY DEPENDENT UPON THE PERFORMANCE OF CORE SECTOR. 2
3
3
4
YEARLOADING IN MT%AGE GROWTHGDP GROWTH (%)/ CORE SECTOR (%) 1950-5173.2 3.8 2.0 % 2001-02492.5 X TH PLAN 02-03518.745.334.3 03-04557.397.458.5 04-05602.788.147.5 05-06667.2010.699.0 06-07728.779.239.6 XI TH PLAN 07-08794.218.989.0/ 5.2 08-09833.314.926.8/ 2.8 09-10887.996.568.0/ 6.6 10-11921.513.778.4/ 6.6 11-12969.785.246.5/ 4.4 XII TH PLAN 12-131009.834.275.0/2.6 13-141053.54.324.7/3 4
5
5 PERFORMANCE VIS-À-VIS ECONOMY YearGDP GrowthIIP Growth Core Sector Growth Freight Loading Growth 2005-069.488.63.910.69 2006-079.5712.98.49.23 2007-089.3215.55.28.98 2008-096.722.52.84.92 2009-108.595.36.66.56 2010-118.918.26.63.77 2011-126.692.955.24 2012-134.471.16.54.13 2013-144.74-0.134.32 (in % age)
6
6 CommodityRailway Ldg. Growth 2013-14 Core sector growth 2013-14 Coal2.360.8 Pig Iron and Finished Steel 9.274.3 Cement3.773.0 Fertilizers-3.351.5 POL0.771.7 Total4.333 COMPARISON OF CORE SECTOR GROWTH VIS-À-VIS RAILWAY LOADING
8
8 CommodityTonnes Originating (in MT) NTKMs (in millions) Average Lead (in km) Earnings ( in cr.) Coal508.1026971353139987.15 RMSP17.33100605801560.81 Iron & Steel38.55343428915805.33 Iron Ore124.25436033519163.67 Cement109.81597125448665.32 Foodgrains54.386822712557894.39 Fertilizers44.38364528214535.89 POL41.94283456765405.37 Containers43.604878911194339.62 other Goods71.21526267396111.29 Total 1053.5565186961993468.84 % variation (y-o-y) 4.321.56-2.6710.23
11
11 COMMODITY WISE LOADING
12
12
13
Wagons- IR owned general purpose and Special wagons, Private Customer/Container/SFTO, Jointly Owned. Locomotives – Diesel and Electric Network Capacity. Terminals- Public Goodsheds, Sidings and Private Freight Terminals Manpower - esp Running staff Maintenance Capacity- Regular and Periodic Overhaul 13
14
Year Wagon Holding Wagon Acquisition Diesel Loco Holding Elect. Loco Holding Total Loco holding 2008-09207,58715,261496435868550 2009-10206,70715,597502238258847 2010-11219,23116,638513740339170 2011-12230,22918,357519743099506 2012-13237,50816,894534545689956 2013-14245,2928,3145500484110341 14
15
WAGON INDUCTIONS-COAL TRAFFIC Type of Wagon for commodi ty 2008-092009-102010-112011-122012-132013-14 2014-15 (Target) BOXN+ BOBRN 5,7815,5355,61911,6837,0004,0108,000 TOTAL 11,51413,43416,63818,35715,6268,31413,162
16
Year ELECTRIC LOCOS DIESEL LOCOS 2009-10 240232 2010-11 260223 2011-12 298236 2012-13 330293 2013-14 302331 2014-15 (Target) 280330
17
Type of WagonHOLDING 1 st APRIL 2014 BCN 64,460 BOXN 1,03,874 BOBRN 14,632 BRN+BOST 19,068 BTPN/BTFLN 12,651 BOBS/BOY 2,854 TOTAL 2,29,532 WAGON HOLDING
18
18 WAGON TYPE HOLDING (in rakes) LOADING POTENTIAL (in rakes/day) BOXN1620> 350 BOBR220>100
19
19 WAGON TURN ROUND ON INDIAN RAILWAYS
20
20 WAGON UTILIZATION ON INDIAN RAILWAYS
21
21 WAGON TYPE 2012-132013-14 BOXN4.60 BOBR3.012.36 (In Days)
22
COAL TRANSPORTATION
23
IN VIEW OF THE IMPORTANCE OF COAL FOR THE NATIONAL ECONOMY, IMPROVING COAL TRANSPORTATION HAS BEEN ACCORDED HIGHEST PRIORITY BY RAILWAYS IMPROVED COAL TRANSPORTATION HAS RESULTED IN REDUCTION IN VENDIBLE COAL STOCKS WITH CIL FROM 70.9 MT AS ON 1 st APRIL 2012 TO < 30 MT IN AUGUST 2014 FACILITATED GROWTH OF COAL BASED THERMAL POWER GENERATION IN THE COUNTRY- 8.2% GROWTH IN 2013-14 & 15% GROWTH IN 2014-15 (UPTO JULY) 23
25
25 YearRAIL CO-EFFICIENT (%) 2008-0966.99 2009-1065.44 2010-1169.87 2011-1270.91 2012-1371.40 2013-14*71
26
26 Source Loading in Rakes/Day Coal India Ltd191 Singareni Collieries21 Imported75 Others65 Total353 LOADING OF COAL ON INDIAN RAILWAYS
28
28 RAILWAYAverage Lead (in km) Central Railway491 Eastern Railway525 East Central Railway570 East Coast Railway400 Southern Railway305 South Central Railway351 South Eastern Railway397 South East Central Railway659 South Western Railway428 Western Railway1081
29
North India Bay of Bengal Arabian Sea CCL / BCCL ECL NCL CIC Korba WCL SCCL M AP K Gujarat IB TLHR Chennai NTPC
30
PORTRakes per day MUMBAI PORT 0.65 PARADEEP PORT 8.55 DHAMRA PORT COMPANY LIMITED 8.94 ADB COAL HANDLING PLANT, PARADEEP PORT TRUST 2.23 GANGAVARAM PORT 6.19 VIZAG SEAPORT PRIVATE LTD.VISAKHAPATNAM 1.06 VISHAKHAPATNAM-PORT 6.13 KAKINADA SEA PORT 3.68 KRISHNAPATNAM PORT 11.23 HALDIA DOCK COMPLEX BULK 4.65 HALDIA DOCK COMPLEX & GENERAL 2.13
31
PORT Rakes per day MANGLORE PORT 1.29 KARAIKAL PORT 1.84 TUTICORIN PORT 0.35 MARMAGAO HARBOUR 4.81 KANDLA PORT 2.29 MUNDRA PORT CARGO COMPLEX 2.13 WEST PORT SIDING 5.16 DAHEJ PORT 8.16 NAVLAKHI 2.19 TOTAL OF ALL PORTS83.65
32
IMPORT OF STEAM COAL BY POWER SECTOR HAS GROWN FROM 3 MT IN 2002-03 TO 100 MT IN 2013-14 RAILWAYS HAS BEEN ABLE TO COMPLETELY MEET THE DEMAND FOR TRANSPORTATION OF IMPORTED COAL TO POWER HOUSES BY FOLLOWING A “LOGISTICS PLAN” OPTIMIZATION OF RAILWAY RESOURCES FOR TRANSPORTING BOTH IMPORTED AND DOMESTIC COAL HAS BEEN ENSURED IF LOGISTICS PLAN IS NOT FOLLOWED, RAILWAYS MAY NOT BE ABLE TO MEET THE DEMAND FOR TRANSPORTATION OF IMPORTED & DOMESTIC COAL POWER HOUSES IN CENTRAL INDIA LINKED TO WESTERN PORTS – HIGHER TRANSPORTATION COST CHOICE IS BETWEEN HIGHER TRANSPORTATION COST WITH ASSURED SUPPLY & LOWER TRANSPORTATION COST WITH ERRATIC SUPPLY CAPACITY ENHANCEMENTS TO FACILITATE MOVEMENT FROM EASTERN PORTS PLANNED – MAY TAKE SOME TIME 32
34
WB/DVC/FKK/KLG HLZ PRDP BADARPUR TLHR VZP KRPH+KPKD SMDR RDM+ PRLI KAKINADA KRISHNA CHENNAI KPCL GUJ NTPC- RSTP/VSTP/ SSTP/TD/ UCR/DER/ KRBA/BIA RAJ/PUN/ HARYANA/ UP MUMBAI MAHA DHAMRA
35
35 VARIATIONS IN COAL LOADING
36
CIL LOADING-REDUCING BANDWIDTH LOADING IN THE YEAR R MONTH2008200920102011201220132014 JAN163168169172184210211 FEB170172173168194208210 MAR174178176180196223207 APR158153155176180200197 MAY150147154160182184187 JUN145153152158176186180 JUL138143155164175188174 AUG135146157138156180 SEP143141150131157182 OCT152150163154184169 NOV163 168177187189 DEC162168169184201200 % VAR292617402932
37
PROCESS OF LOADING CIL IR Pithead Crushing Transporting to siding Loading Supplying Rake Dispatches
38
38 BANDWITH FOR COAL LOADING FROM WESTERN PORTS (In terms of Rakes) Mundra Port West Port Siding Kandla PortNavlakhi Dahej PortPipavavTOTAL Avg per day Jan-14129-41451172135311 Feb-14120-204267102599 Mar-143014417611342140713 Apr-142710118391701036512 May-14231791861141843014 Jun-141918439432221151817 Jul-146616070692532464221
39
PATH AHEAD FIRST MILE CONNECTIVITY CRUCIAL: ALL WEATHER ROADS, TRUCKS,ETC. REDUCED BAND WIDTH:LOADING UNIFORMLY THROUGHOUT THE YEAR WITH BAND OF MAX 10 RAKES BETWEEN MINIMA AND MAXIMA. AT PORTS SUPPLIES TO BE CONTINUOUS – NO SPURTS. REDUNDANCY IN HANDLING INFRASTRUCTURE INCL STORAGE SPACE.
40
NETWORK STATUS & UPGRADATION 40
41
Delhi Mumbai Chennai Kolkata High Density Corridor (Golden Quadrilateral + Diagonals) 16% of route Km carries 52% of passenger & 58 % of freight
42
42 DEDICATED FREIGHTCORRIDOR NETWORK MUMBAI DELHI CHENNAI KOLKATA LUDHIANA VIJAYAWADA Sanctioned projects Unsanctioned projects VASCO
43
Tori-Shivpur line- Forest clearances received -Handing over of land to Railways in process -TDC - July’17 Shivpur-Kathautia line- Land acquisition applications filed for processing Stage I forest clearance. NOC for forest land awaited Jharsuguda-Barpalli-Sardega line- Stage-II forest clearance recieved– TDC - June’16 Bhupdevpur-Korichapar-Dharamjaigarh- SPV formed- Land acquisition & forest clearance under process- TDC-Sep’16 43
44
S.NoName of Project 1Kalyan-Kasara 2Wardha-Nagpur 3Bhopal-Bina 4Bina-Kota 5Habibganj-Bhudni-Itarsi 6Bhadrak-Nergundi 7Champa-Jharsuguda 3rd line 8Talcher-Sambalpur 9Bilaspur-Urkura 10Khodri-Annupur with flyover at Bilaspur 11 Champa - Byepass line 12 Salka Road-Khongsara - Annuppur Doubling (90 km) 13 Durg-Rajnandgaon 3rd line 14 Kalumna-Nagpur
45
45 LIST OF PORT CONNECTIVITY PROJECTS IN PROGRESS RailwayConnected to Port Name of ProjectCost (Rs. Cr.)TDC (tentative) CRMumbaiDedicated freight line between Wadala and Kurla 1042016-17 ECORParadipHaridaspur-Paradip new line.1000NF ECORVishakhapatnamKottavalasa-Simhachalam North 4th line doubling 100.76Completed and commissioned. ECORVishakhapatnamVizianagram-Kottavalasa 3rd line 248.16Completed and commissioned. ECORVishakhapatnam, Dhamra, Paradeep Rajatgarh-Barang doubling275.22014-15 ECORVishakhapatnam, Dhamra, Paradeep Khurda Road-Barang 3rd line2212014-15 SERHaldiaDoubling of 1) Panskura- Haldia section 1) Rs 86.91 2) Rs 171.02 Rajgoda-Tumluk – completed and commissioned. Tamluk- Basulya (52%) work completed.
46
46 Railwa y Connected to Port Name of ProjectCost (Rs. Cr.) TDC (tentative) SCRKrishnapatnamObulavarpalle- Krishnapattanam new line930Venkatachalam-Krishnapatnam – completed and commissioned. Balance is in progress. SREnnoreThe new Chord line. (Puttur – Attipattu)527NA SWRMarmogaoHubli-Ankola337.82NA SWRMarmogaoDoubling of Hospet –Vasco section21272016-17 WRKandlaBhildi-Viramgam gauge conversion589.43NA (55%) CONNECTIVITY PROJECTS - IN PROGRESS
47
Enhanced Axle Load operations from 20.32 to 22.9 25 T on mineral routes. Extend to all routes. Develop wagons for 25 T. Targeted investments on low cost but high return traffic facility works incl terminals. HEAVIER, FASTER, LONGER—MANTRA FOR HIGHER GROWTH
48
HEAVIERFASTERLONGER PROLIFERATE 22.9 T AXLE LOAD RUNNING ON ALL ROUTES NEW WAGONS TO RUN AT 100KMPH LOADED AND 100KMPH EMPTY DISTRIBUTED POWER SYSTEM AND LONG HAULS ARE SOLUTIONS TO GENERATE ADDITIONAL THROUGHPUT AND OVERCOME CAPACITY CONSTRAINTS UPGRADE IRON ORE ROUTES AND DFC FEEDER ROUTES TO 25T AXLE LOAD GET 25T AXLE LOAD WAGONS ON PRIORITY 48
49
FDI IN RAIL INFRASTRUCTURE PRIVATE INVESTMENT THROUGH PFT, SFTO, AFTO & LWIS POLICY PPP SCHEMES FOR NETWORK AUGMENTATION- DEVELOPMENT OF LOGISTICS PARKS EMPTY FLOW DISCOUNT SCHEME E-REGISTERATION OF DEMAND 49
50
Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.