Low-Voltage D.C. Workshop April 8, 2011

Similar presentations


Presentation on theme: "Low-Voltage D.C. Workshop April 8, 2011"— Presentation transcript:

1 Low-Voltage D.C. Workshop April 8, 2011
American Electric Power Energy Storage Deployments Emeka Okafor Research Programs

2 American Electric Power : Company Profile

3 The Evolution of the Electric Utility System
Before Smart Grid: One-way power flow, simple interactions, limited sources of renewable generation After Smart Grid: Two-way power flow, multi-stakeholder interactions, increased penetration of renewable generation Customer DG. We need to be able to control it. Energy Storage gives us that opportunity. Adapted from EPRI Presentation by Joe Hughes NIST Standards Workshop April 28, 2008

4 Smart Grid Enables Energy Storage
But where is the best location/size for the storage ? Adapted from EPRI Presentation by Joe Hughes NIST Standards Workshop April 28, 2008

5 Energy Storage Options

6 AEP’s 1ST Substation Battery
This First Utility-Scale NAS Project in the U.S. was Partially Funded by DOE/Sandia 2006 1MW, 7.2 MWh of NaS battery Deferred New Substation Tyler Mountain Feeder 12 kV bus North Charleston Feeder West Washington Feeder Voltage Regulator 46kV/12kV Transformer 12/16/20 MVA 46 kV Chemical Station Charleston, W.VA. AEP S&C NGK

7 AEP 2006 Project – Peak Shaving
+ 1.2 MW Charge - 1.0 MW Discharge Scheduled trapezoidal Charge & Discharge profiles Summer Month Peak Days Improved the feeder load factor by 5% (from 75% to 80%) 2006 2007 2008 Three Successful Years of Peak Shaving Explain what the charts are: Approx. 90 days of load shapes

8 The New “Islanding” feature is Partially Funded by DOE/Sandia
AEP Storage 2010 – 11MW, 75MWh 1 MW, 7.2 MWh installed in 2006 Deferred substation upgrades 3 - 2MW,14.4 MWH Commissioned in 2009 Implemented “Load Following” Demonstrated “Islanding (Backup Power)” 4MW, 25MWh substation on-line in 2010 The New “Islanding” feature is Partially Funded by DOE/Sandia

9 Load Following Peak Shaving
Circuit Demand

10 Churubusco, IN: Battery Islanding Zones.
Station

11 Islanding (Backup Power) Events
Location Milton, WV Customers on Backup Power 25 700 Duration on Backup Power 48 hours 1hr 17 mins 10 hours Cause of Outage Ice Storm Vehicle Accident Electrical Fault Date Dec 2009 Nov 2010 Mar 2011

12 Community Energy Storage (CES)
CES is a fleet of small distributed energy storage units connected to the secondary of transformers serving a few houses controlled together to provide feeder level benefits. Key Parameters Value Power 25 kW Energy 75 kWh Voltage - Secondary 240 / 120V Battery Li-Ion Round Trip AC Energy Efficiency > 85% 25 KVA Functional Specifications for CES are “OPEN SOURCE” In 2009 EPRI hosted open webcasts to solicit industry wide input.

13 CES – Benefits to the Customer
CES is Operated as a Fleet offering a Multi-MW, Multi-hour Storage Local Benefits: 1) Backup Power 2) Renewable Integration 3) Voltage correction Talk about potential for customer’s to no longer own inverters to convert DC-to-AC this will be done by CES Substation CES Power Lines Communication and Control Links

14 Communication & Control Layout for CES
CES – A Virtual Substation Battery CES is Operated as a Fleet offering a Multi-MW, Multi-hour Storage Local Benefits: 1) Backup Power 2) Renewable Integration 3) Voltage correction Grid Benefits: 4) Load Leveling at substation 5) Power Factor Correction 6) Ancillary services Integration Platform Utility Dispatch Center /SCADA CES Control Hub Communication & Control Layout for CES Substation CES CES CES CES Power Lines Communication and Control Links

15 CES: AEP Ohio gridSMARTSM Demonstration
North CES: 2MW/2MWh; Fleet of kW Units Circuit: Morse Rd 5801; 13 kV, 6.3 MVA Peak Load, 1742 customers Coverage: Approximately 20% of customers Schedule: Mar 2011 Prototype Testing Dec MW Deployment Status: Mar 2011 – 2 Prototypes being tested at AEP’s Dolan Technology Center. Morse Rd 5801

16 Prototype testing at Dolan Technology Center

17 Mock installation at AEP’s Dolan Technology Center
CES Unit Ground Level Mock installation at AEP’s Dolan Technology Center Battery Case Battery Sleeve Simulated Image from S&C Electric Company

18 CES – NE Columbus Project Benefits.

19 Feeder level demand profile showing CES Unit charge and discharge
Load Leveling – Spread Across the CES Fleet Morning Noon Evening Midnight Trigger Level for Discharge Trigger Level for Charge CircuitFeeder’s charge and discharge needs are assessed periodically and divided among CES Units on the circuitfeeder Feeder Load CES # 1 # 2 # 3 Feeder level demand profile showing CES Unit charge and discharge

20 Sustainable Future Deployments
Three Tiers for Sustainable Energy Storage Deployments TECHNOLOGY Validate energy storage technology can meet grid requirements Credible financial benefit to customers Ensure favorable rate recovery treatment BUSINESS PLAN REGULATORY

21 Conclusion Successful deployment of Energy Storage Systems
AEP’s current Energy Storage strategy is focused primarily on Community Energy Storage. Energy Storage System Cost must reduce significantly to become economically justifiable for utility deployment. Market predictions indicate that near-term costs for energy storage may broaden deployment opportunities.