Download presentation
Presentation is loading. Please wait.
Published byAlisha Preston Modified over 9 years ago
1
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan
2
M2: Team Paradigm Team Paradigm
3
M2: Team Paradigm Project Status 18-525, Integrated Circuits Design Project Design Proposal (Done) Architecture Proposal (Done) Gate level Design(Done) Component Layout (DRC & LVS): DONE basic components: 100% functional blocks: 100% Component Simulation: DONE basic components: 100% functional blocks: 100% To be done: Chip Layout Spice Simulation of Entire Chip
4
M2: Team Paradigm Overall Floorplan
5
M2: Team Paradigm Floor plan Proposal rom shift reg reg 4bit 16x1 mux Add rom shift reg Add 4bit 16x1 mux 16bit 4x1 mux reg Add reg Add 16bit 4x1 mux ctrl 500u 200u
6
M2: Team Paradigm
7
Critical Path 8 Clock Cycles original 4 clock cycles now for Registers Flow through large mux
8
M2: Team Paradigm LVS'ed Components & Spice Simulations Register
9
M2: Team Paradigm
13
LVS'ed Components & Spice Simulations Adder
14
M2: Team Paradigm
21
LVS'ed Components & Spice Simulations Subtractor
22
M2: Team Paradigm
25
LVS'ed Components & Spice Simulations ROM
26
M2: Team Paradigm Old Rom Layout
27
M2: Team Paradigm Old Hspice Results
28
M2: Team Paradigm New Layout of Rom
29
M2: Team Paradigm New Hspice Results
30
M2: Team Paradigm LVS'ed Components & Spice Simulations SRAM
31
M2: Team Paradigm SRAM LAYOUT
32
M2: Team Paradigm
34
::conclusion & questions
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.