1
Sunset Substation Community Design Meeting #3
2
Agenda Welcome and Introduction Final Vision Statement Solar Study Analysis Alternate Design Schemes Preliminary Cost Comparison Questions and Comments
3
www.sunsetsubstation.org
4
Vision Statement Abstract Statement to Guide Future Decision Making
5
Vision Statement 1. This public parcel should be repurposed for community use. 2. Incorporate renewable energy technologies that allow power generation and public use to coexist. 3. Empower and inspire community involvement in the maintenance and stewardship of the site.
6
Solar Study Analysis
7
Solar Access - Middle of Site
8
Solar Access - NE Corner of Site
9
Sample 23 kW Installation
10
Parameters
12
Precedents
17
Design Schemes
18
The Big Roof Scheme
19
Alley W. 65th St. Covered Plaza Community Building Storage & Solar Equipment 32nd Ave. NW
20
The Big Roof Scheme
22
The Pair Scheme
23
Alley W. 65th St. Plaza Community Building Storage & Solar Equipment 32nd Ave. NW
24
The Pair Scheme
26
The Wedge Scheme
27
Alley W. 65th St. Covered Outdoor Plaza Community Building Storage & Solar Equipment 32nd Ave. NW
28
The Wedge Scheme
31
Conceptual Cost Comparison Total Project $660,000 Solar Component (160 panels) $390,000 Total Project $775,000 Solar Component (131 panels) $450,000 THE BIG ROOF SCHEME Total Project $730,000 Solar Component (114 panels) $285,000 THE WEDGE SCHEME THE PAIR SCHEME
32
THE PAIR SCHEMETHE BIG ROOF SCHEMETHE WEDGE SCHEME