Castellanza Workshops 22-26 October 2007 Hydroelectric power plant in Solina, Poland.

Similar presentations


Presentation on theme: "Castellanza Workshops 22-26 October 2007 Hydroelectric power plant in Solina, Poland."— Presentation transcript:

1 Castellanza Workshops 22-26 October 2007 Hydroelectric power plant in Solina, Poland

2

3 Thea area of the artificial lake is 22 square kilometers and it has the biggest capacity, that is 472 millions of cubic meters. The lake is 60 meters deep. Thea area of the artificial lake is 22 square kilometers and it has the biggest capacity, that is 472 millions of cubic meters. The lake is 60 meters deep.

4 The biggest attraction of Solina is the dam on the river San. It creates the biggest artificial lake in Poland. The biggest attraction of Solina is the dam on the river San. It creates the biggest artificial lake in Poland.

5 The hydroelectric power station in Solina was first used in 1968. In the years 2000 - 2003 the dam was modernized and as a result the power output Of the power station was increased from 136 mW to 200MW. The annual Production of electricity by the dam is 112GW The hydroelectric power station in Solina was first used in 1968. In the years 2000 - 2003 the dam was modernized and as a result the power output Of the power station was increased from 136 mW to 200MW. The annual Production of electricity by the dam is 112GW

6 Electric duct and the electric turbine in the dam.

7 The overflow section of the dam

8

9

10

11

12

13

14

15

16 And some historical photos of the construction And some historical photos of the construction

17

18 Farmer Solina village which was flooded by the waters of the lake.

19

20

21

22 …THE END… …THE END…