Download presentation
Presentation is loading. Please wait.
Published byMaximilian Simpson Modified over 9 years ago
1
Piotr Richter Professor of Surgery MD PhD The new University Hospital in Krakow
2
Description of Project In 2011, as a result of negotiations with the Ministry of Health, following specifications of the new University Hospital were established: Area of land for investment: 15.28 acres The surface of objects: 109 685 m 2 Volume: 391 709 m 3 Number of beds: 925 Estimated value of investments 1,230,060,000 PLN, including: - Preparatory work and construction – renovations: 886,158,000 PLN - The basic medical supplies: 343,902,000 PLN Completion date: 2019
3
Description of Project The hospital will consist of the following modules: Inpatient module with 925 beds Surgical and diagnostic module Operating theatre module with 24 operating rooms Hospital emergency department with 24 beds Specialist outpatient clinics Educational and administrative unit
4
The biggest medical investment in Poland. The planned hospital is designed so that the objects can fulfil several strategic functions : Diagnostic, using the latest imaging equipment Therapeutic based on the latest and innovative methods of conservative and surgical treatment Educational for the medical staff from southern and south-eastern Poland Allowing for multi-profile scientific clinical studies The transfer to a new location will be associated with a reduction in hospital beds (medical positions). Challenges and cooperation opportunities
5
Thank you very much for your attention
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.