1
Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune 2005- December 2008 310, 000 sq ft ExpansionTotal Cost = $181 million
2
Site Layout Arial photos taken by: Frank Wiese of The Morning Call, July 11 2006
3
Technical Analysis 1 Gain higher LEED rating –Currently Silver –Obtain a Gold rating Analysis of rooftop rain water collection system for grey water use Waterless urinals Courtesy of: http://www.lakotawatercompany.com/images/AnimatedRainwater.gif
4
Technical Analysis 2 Control air quality to reduce risk of illness to workers and patients in existing building Alternate phasing of construction to allow cleaner facilities Analysis of products and techniques to prevent contaminants entering the building
5
Technical Analysis 3 Propose using a pre- cast hollow core floor system Reduce amount of labor Reduce schedule time Develop system cost comparison Current System: Poured Slab on Metal Deck Alternate System: Pre-cast Hollow Core Concrete Floor