Download presentation
Presentation is loading. Please wait.
Published byMeredith Atkinson Modified over 9 years ago
1
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs Bathroom Remodel
2
Original bathroom for house Metal window Carpet floor covering Cast Iron Tub Ceramic Tile Walls Wallpaper previously removed and adhesive painted over Vanity deteriorating
3
Demolition and repair Sub-floor repaired in areas Drywall repaired around vanity Plumbing drain line replaced
4
Improvements… Glass Block Window replaced metal framed window Hardi-backer installed prior to ceramic tile flooring and tub-surround Fiberglass Tub replaced cast iron tub
5
Final Result New Flooring New Walls New Vanity & Top New Tub New Accessories New Lighting New Paint New Bathroom!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.