Stick Mann Remodeling a Bathroom
2
My Background Interested in construction from a young age Took 5 sections of woodshop in high school
3
Future Implications Attending Stick Building University this fall Majoring in Construction Technology Would enjoy owning a construction company
4
Identifying the Project Upgrade desperately needed for the guest bathroom in my parent’s house Water damage from the sink, shower, and toilet Complete demolition and rebuild Removal of moldy materials Reframing the room and changing the dimensions
5
Identifying the Project Continued… Needs a tile floor (including sub floor) Updates necessary for heating ducts New PEX plumbing needed throughout New sink, shower, and toilet Complete redo of electrical, sheetrock, and paint
6
Skills I Needed to Learn Demolishing and removing materials Framing a room Plumbing with PEX pipe and fittings Inserting junction boxes, rewiring outlets/switches, and lights
7
Skills Continued… Installing a sink, toilet, and one piece shower/bath Tiling Hanging sheetrock, taping, texturing, and painting
8
My Timeline September 2010: ask Sticky Stickmasterson to be my mentor October 2010: complete my research paper—with help from the Internet, How-to Books, and Sticky Stickmasterson November 2010: meet with Sticky and then begin demolition December 2010: complete 30 hours of work—fixing the duct work and replacing the subfloor January 2011: meet with Sticky—have him help me with framing, plumbing, installing tub, and completing electrical—30 more hours of work February 2011: install the tile floor, grout, caulk, sheetrock, tape, and paint— Sticky will guide me throughout this process—another 30 hours of work—the project should be complete!!!
9
My Mentor Sticky Stickmasterson Asked in July to be my mentor General Contractor 35 years of experience Willing to meet with me 2x a month Professional Bodybuilder
10
The Project Begins… Met with Sticky in late October Began demolition on bathroom
11
More Demolition Pictures
12
Subfloor Install Completed this in December with Sticky’s help Repaired duct work, re-routed electrical/plumbing Reinsulated and retrofitted joists as needed
13
Framing Sticky helped me with plumb, level, and 16 inch centers Learned how to use a nail gun
14
Shower/Tub Install with Plumbing
15
Toilet and Sink Installation
16
Tiling Laid down membrane Installed cement board Cut tile with a straight cutter, saw, and snippers Applied grout and seal
17
Sheetrock, Taping, Texture, and Paint Hung green board Applied a membrane Taped and sprayed texture Painted a caramel color
18
Completed Project Completed date was February 28, 2011
19
More Pictures of Completed Project
20
Conclusion New Learning: – Framing, tiling, plumbing, electrical, duct work, sheetrock, texturing, and painting What this means for me: – Jump start for college – Be able to work construction jobs to make extra money – Ability to remodel my own home
21
Thank you for listening to my presentation about remodeling my bathroom. Questions…