Download presentation
Presentation is loading. Please wait.
Published byLeslie Phillips Modified over 9 years ago
1
UCSF Medical Center at Mission Bay Proposed Fourth Street Public Plaza Mission Bay CAC February 9, 2012 1
2
Agenda Overview: UCSF Medical Center at Mission Bay Proposal: Fourth Street Public Plaza –Plaza Area Concept –Proposed Design Multi-Use Promenade Amphitheatre Central Plaza Grove Bench Walk –Circulation –Milestones and Public Input 2
3
Children's Hospital – 183 beds –urgent/emergency care and pediatric primary and specialty outpatient care Women's Specialty Hospital – 36 beds –cancer care, specialty surgery, a 36-bed birth center and select women's ambulatory services Cancer Hospital – 70 beds –first step to full cancer services at MB Outpatient Building and Helipad Energy Center (central plant) Parking The Plan for Mission Bay – 2014 Integrated Children’s, Women’s Specialty and Cancer Hospitals 3
4
Children’s (183 beds) Women’s (36 beds) Cancer (70 beds) Energy Center Children’s & Women’s UCSFResearchCampus (Future Cancer 2020) MARIPOSA STREET FOURTH STREET Helipad Hospital Outpatient 4
5
UCSF Benioff Children’s Hospital 5
6
Third Street Plaza 6
7
Outpatient Building and Helipad 7
8
Proposal: Fourth Street Public Plaza Opportunity to create a warm and welcoming open space for all community members – including patients, visitors, staff Public realm – pedestrians, bike path, landscaping Farmer’s markets; concerts; urban experience Accessible by fire/emergency vehicles and can be easily opened in an emergency that requires through traffic After extensive consultation the City Family is supportive of proposed design 8
9
Mission Bay Context Plan 9 4 th Street Public Plaza
10
Constituents’ Goals 10 Community:Garden feel, “not corporate”; clear pedestrian access; vehicular access in emergency Hospital:Drop off loops; welcoming/healing environment; place for events Patients, Visitors:Relaxing; clear way-finding; waiting area City Family:Remains public realm; reduce cars; pedestrian oriented; storm water; ADA access SFFD:Emergency access Bicycle Coalition:Through path; safety Child Life:Engaging for children; interactive Staff:Safety at night; place for meetings/lunch
11
Proposed Design 11
12
12 Concept Plan – Phase 1
13
13 Concept Plan – Phase 2
14
14 Multi-use Promenade
15
15 Promenade images Multi-use Promenade – From North
16
16 Multi-use Promenade – View South
17
17 Multi-use Promenade – Plaza
18
18 Multi-use Promenade – From South
19
19 Promenade Access
20
20 Fourth Street Public Plaza
21
21 Amphitheater
22
22 Amphitheater – From North Drop-off
23
23 Amphitheater – From Central Plaza
24
24 Amphitheater – From Central Plaza
25
25 Amphitheater – From Top
26
26 Amphitheater – From Bridge
27
27 Central Plaza
28
28
29
29 Front Porch Grove
30
30 Grove – From South Drop-Off
31
31 Grove – From South
32
32 Bench Walk
33
33 Bench Walk – Pedestrian
34
34
35
35
36
Circulation 36
37
Primary Movement Corridors 37
38
38 Class I Bicycle Lane: Separate ROW Class II Bicycle Lane: Striped lane Class III Bicycle Lane: Shared with arrow striping Existing Bicycle Network & Currently Proposed Changes to Mission Bay Plan
39
Traffic Analysis of Proposed Change The closure of Fourth Street to vehicular through traffic was analyzed as a project alternative in UCSF’s 2008 Medical Center at Mission Bay EIR Traffic improvement measures have been identified to address effects if Fourth Street were closed to vehicular through traffic Implementation of these measures would allow intersections to operate at acceptable levels of service UCSF would fund the implementation of these measures 39
40
New Right Turn Lane Street Widening, Turn Lanes and Median Restriping in Existing ROW Fourth Street Public Plaza Energy Center Turnout New Traffic Signal Proposed Traffic Improvement Measures Changes to Optimize Circulation Changes for 4 th Street Public Plaza 40
41
Milestones and Public Input 41
42
Anticipated Project Milestones Nov 2011: Design competition for landscape architect Feb 2012: Draft EIR Published Mar 2012: Draft EIR Public Hearing Mar 2012: Plaza Design Complete Summer 2012: Final EIR Summer 2012: UC Certification of EIR, Approval of Budget & Design Jul or Sep 2012: SF Board of Supervisors 42 Continued
43
Anticipated Project Milestones (continued) Sept 2012:Underground utility construction begins Nov 2012:Plaza construction documents complete Mar 2013:Approval and Permits from State Fire Marshal and SF DPW May 2013:Plaza construction begins 2015: UCSF Medical Center at Mission Bay opens 43 Public input opportunities follow
44
Opportunities for Public Input Past Opportunities 2008 – 2009Community design meetings Jun 1, 2011UCSF Mission Bay CAG Action Team Jul 12, 2011Dogpatch Neighborhood Association Sep 12, 2011South Beach Mission Bay Rincon Hill Neighborhood Association Oct 15, 2011Potrero Hill Festival information table Oct 22, 2011Potrero Hill History Night information table Nov 9, 2011Dogpatch Neighborhood Association 44
45
Opportunities for Public Input Anticipated Opportunities 2012 January 23UCSF Community Meeting February 9Mission Bay Citizens Advisory Committee March 12South Beach/Rincon/Mission Bay Neighborhood Assn March 13 Dogpatch Neighborhood Association Feb–MarDraft EIR Public Comment Period March Draft EIR Public Hearing March DPW Director Hearing on Major Encroachment Permit Summer UC Certification of EIR, Approval of Budget and Design SummerSuccessor Agency Oversight Board Meeting on Public Plaza Design Summer (Potential) MTA Board Meeting on Fourth Street Summer (Potential) Planning Commission Meeting on General Plan Referral Summer SF Board of Supervisors 45
46
END OF PRESENTATION 46
47
47 Circulation – Phase 1
48
48 Circulation – Phase 2
49
49 Promenade Access Phase 1
50
50 Promenade Access Phase 2
51
51 Promenade Tree Spacing Study – West Elevation
52
Future Widened Mariposa Street 52
53
Future Widened I-280 Off-Ramps 53
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.