Download presentation
Presentation is loading. Please wait.
Published byJonathan Quinn Modified over 9 years ago
2
Certified Service Training Start Centrifugal Trash Pumps
3
Certified Service Training Centrifugal Trash Pumps 2” – 4” (50 – 100mm)
4
Certified Service Training Pump Housing
5
Certified Service Training Housing Cover w/volute Suction inlet port Housing O-rings
6
Certified Service Training Volute Discharge port Inlet Suction Port Index rib Recirculation hole
7
Certified Service Training Impellers and Mechanical Seals Carbon-Ceramic seal Insert New 2” & 3” 4”4” Silicon-Carbide seal
8
Certified Service Training Engine Shafts 2 & 3 inch4 inch
9
Certified Service Training Pump Maintenance Daily before use Check fuel level & condition Check engine oil Inspect air filter Check hoses, fittings & visible hardware After 20 hours First oil change After 50 hours Clean/replace air filter After 100 hours Change engine oil Change spark plug Clean engine fins Clean carb filters After 300 hours Check/adjust valves Check/adjust impeller clearance
10
Certified Service Training Centrifugal Trash Pumps This concludes your training on Wacker pumps.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.