Download presentation
Presentation is loading. Please wait.
Published byLaureen West Modified over 9 years ago
1
Safety Regulation Group Slide 1 INCAPACITATION AND REPLACEMENT OF SENIOR CABIN CREW MEMBERS Presentation to OST 29 November 2005
2
Safety Regulation Group Slide 2 BACKGROUND JAA received enquiries as to interpretation Working Paper produced Identified information in different areas Possible to misinterpret Could lead to non-compliance
3
Safety Regulation Group Slide 3 BACKGROUND OST tasked Cabin Crew Steering Group to produce material Discussed at CCSG 05-3 Draft NPA produced
4
Safety Regulation Group Slide 4 RIA Purpose – no misinterpretation Options – adoption or rejection Impacts No impact on those who comply Possible commercial and financial impact on those that do not
5
Safety Regulation Group Slide 5 SUMMARY Ensure clarification and standardisation between NAA’s Enhance flight safety Allow flexibility in exceptional circumstances
6
Safety Regulation Group Slide 6 TEXT PROPOSAL JAR-OPS 1.1000 Senior cabin crew members (d) Insert additional sentence This shall only be permitted for one sector and only from an aerodrome where standby cabin crew are not normally available.
7
Safety Regulation Group Slide 7 SUPPLEMENTARY INFORMATION WP also required clarification for ‘replacement’ Discussed by the CCSG Not included in NPA Possible significant cost implication Not practical for small operators
8
Safety Regulation Group Slide 8 JAR-OPS 1.990 Recent query regarding reduction of cabin crew below minimum required Industrial action or sickness Appropriate to include similar requirement in 1.990?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.