Chesapeake City Bridge Crack Study
2
Introduction Adrian Kollias, P.E.
US Army Corps of Engineers Philadelphia District Introduction Adrian Kollias, P.E. Philadelphia District Bridge Program Manager
3
Overview Present problem Previous repair attempts Modeling
Final solution
4
95 1 295 95 40 C&D Canal 13 301 Philadelphia Wilmington DELAWARE
MARYLAND 95 NEW JERSEY 40 C&D Canal 13 Baltimore DELAWARE 301 Dover MARYLAND
5
Chesapeake & Delaware Canal Crossings
MD Rte DE Rts 806 71 DE Rte US Rte 213 9 US Maryland Delaware 13 301 Chesapeake Bay Delaware Bay Conrail Chesapeake City Bridge 2 Lanes Summit Bridge 4 Lanes St. Georges Bridge 4 Lanes Reedy Point Bridge 2 Lanes N
6
Terminology Fracture Critical Members: tension members or tension components of members whose failure would be expected to result in the collapse of partial collapse of a bridge Fatigue: the tendency of a member to fail at a lower stress when subjected to cyclical loading than when subjected to static loading. Fatigue crack – any crack caused by repeated cycle loading. Fatigue life – the length of service of a member.
7
Chesapeake City Bridge
Arch Pier Floorbeam Tie Girder
8
Description Tied-arch structure Two traffic lanes, Maryland Rte. 213
3,954 feet in length Two-girder, fracture critical structure ADT = 14,825 (2004) ADTT = 2,635 (2006) Constructed Overall structural condition is fair Design live load: HS20-44 The bridge is a tied-arch structure located 14 miles west of Reedy Point, Delaware. Consists of the tied-arch main span and 32 simply supported approach spans. The structure was constructed during the period
9
Cracks at 3 Locations: L0, L0’, L1’
11
Bridge Floor System Deck Stringers Tie Girder Sliding Bearings
Cracked Connection Angle Locations Floorbeam
12
Crack Location Track Crack Propagation with Bi-weekly Inspections
13
Crack Location Track Crack Propagation with Bi-weekly Inspections
14
Crack Location Track Crack Propagation with Bi-weekly Inspections
15
Chesapeake City Bridge
Reason for Concern Public Safety Potential for partial bridge failure if corrective measures are not taken Major traffic thoroughfare connecting both northern and southern Delmarva Peninsula in Maryland Connects Northern and Southern Chesapeake City
16
Attempt #1 Drilling Holes
17
Replace Top Portion of Cracked Angles
Attempt #2 Replace Top Portion of Cracked Angles New Angle Section
18
After failed Attempt #2, developed numerical models to investigate the cracking and analyze bridge behavior. Determine that frozen stringer bearings are causing the cracks and must be replaced.
19
Original Bronze Bearings
Stringer Bronze Plate Sole Plate Filler Plate Bearing Plate Floorbeam Top Flange
20
Original Bronze Bearings
Crevice Corrosion
21
Attempt #3: Replace “Frozen” Stringer Bearings
Diaphragm Stringer Sliding Bearings Floorbeam
22
New Neoprene Bearings Sole Plate Neoprene Bearing Pad Bearing Plate
23
- Replaced 72 bearings out of 180 total
Repairs performed in 2003 - Replaced 72 bearings out of 180 total - Repaired connection angles for 6 floorbeams out of a possible 16 total Cost: $945,000 Duration: 210 calendar days
24
Cracks reappear at the angle connections 1-year after bearing repair.
Need to re-evaluate numerical models and design a repair retrofit for the angles to prevent future cracking.
25
Global Model
26
Global Modeling: Details and Assumptions
Modeled using STAAD.Pro 2005 Created using beam and shell elements All members modeled as beam, except deck slab which is modeled using shell elements Rigid elements and offsets to account for differences in c.g. locations of members New elastomeric stringer bearings modeled as tri-directional linear springs Remaining original stringer bearings are modeled as restrained in 3 directions South main arch bearings free to expand longitudinally and rotate about transverse axis North main arch bearings fully fixed Deck is continuous (i.e., can transfer axial force from one panel to another)
27
Calibration of the Global Model
Calibrated to measured global deflection data Calibrated to measured strains from two previous diagnostic tests Overall goal of the calibration Capture the key features of the global response in terms of global deflection and floorbeam stress Strive for realistic agreement in magnitudes, given very complex behaviors and small magnitudes of measured deflection and stress
28
Initial Findings a. Cracking is Due to Relative Rotation between Tie Girder & Floorbeam b. Cracking is Due to Fatigue not Strength b. Continuous Deck Model Best Predicts Floorbeam Stresses Matching Actual Field Measurements c. Frozen Stringer Bearings and Stiff Deck Joints are both Contributing to the Cracking
29
Deflection Under Test Vehicle
30
Completely Continuous
Model Results Discontinuous Slightly Continuous Completely Continuous
31
Remove Sample of Rubber Deck Joint Material to Test Stiffness
32
Deck Joints
33
Deck Joint
34
Original Deck Joint Design - 1977
Rubber Seal ½” x ¼” Steel Support Bars
35
Deck Joints are Restrained from Movement
Fused Steel Bars
36
Typical Deck Joint Fused Steel Bars
37
Typical Deck Joint Fused Steel Bars Show joint busters video.
38
Double Click to See Video
Joint Busters I Double Click to See Video Show Joint Video
39
Double Click to See Video
Joint Busters II Double Click to See Video
40
High-Pressure Power Washer
41
do not achieve infinite fatigue life even
Models indicate existing FTGC angles do not achieve infinite fatigue life even with bearings and deck joints repaired.
42
Retrofit Design Process
Obtain Design Forces – Global Model Develop Preliminary Retrofit Designs (2 Stiffened + 2 Softened) Incorporate Retrofit – Local Model Verify Retrofit Effects - Global Model Finalize Retrofit Design
43
Local Model
44
Fatigue Analysis Fatigue life is function of stress range
Conducted using actual traffic data (cycles) and vehicle weight crossing bridge Fatigue category C for out-of-plane displacement behavior Criteria from AASHTO Guide Specifications and LRFD Specifications
45
Current Repair Contract
Replace top portions of FTGC angles with thicker angle members at L0 to L5 and L1’ to L5’. Replace all deck joint compression seals Replace neoprene bearings at exterior stringers at Floorbeams L1 to L3 and L1’ to L3’. Restore bronze plate bearings at Floorbeams L4 to L7 and L4’ to L7’. Cost: $1.3 million