1 RMS Workshop Retail Systems Disaster Recovery ERCOT May 6 th, 2014.

Similar presentations


Presentation on theme: "1 RMS Workshop Retail Systems Disaster Recovery ERCOT May 6 th, 2014."— Presentation transcript:

1 1 RMS Workshop Retail Systems Disaster Recovery ERCOT May 6 th, 2014

2 2 Addressing Retail DR Needs Mandy Bauld

3 3 1.Understand the Current State 2.Define & Understand the Requirement 3.Close the Gap (Next Steps) Addressing Retail DR Needs

4 4 1.Understand the Current State 2.Define & Understand the Requirement What is the RMS position on a Recovery Time Objective (RTO) for the retail systems in the event of retail system outages? This information is required in order for ERCOT to effectively take any “next step” actions regarding DR for retail systems. 3.Close the Gap (Next Steps) ERCOT’s Primary Objective for Today

5 5 1.Understand the Current State Market needs education on what it takes for ERCOT to failover to level set expectations of the current state Market needs to understand dependencies and decision making process around a failover Market needs information about ERCOT’s failover testing and planning for returning to the primary site 2.Define & Understand the Requirement Various opinions expressed regarding downtime (need a limit on the downtime; need full operation within 24 hours; 24 hours downtime is unacceptable) Even after systems were “back up” there were still configuration issues in the DR environment and still had backlog to work through… more than acceptable… it was not fully restored Cleanup work was more than expected The market’s manual work-around capability is limited, is not sustainable, and is not without risk Incomplete or delayed communication has a direct impact on market ability to make decisions and manage customer expectation through the event 3.Close the Gap (Next Steps) Identify options that improve ERCOT’s and the market’s ability to meet the defined requirements RMS Feedback Summarized (April 1, 2014 RMS Meeting)

6 6 March 11 th Outage Timeline Overview – Retail DR Capability & Process System Outage Communications System Outage Requirements Work-Around Processes Planned Failover Communications Agenda

7 7 March 11 th Outage Timeline Dave Pagliai

8 8 System Outage on March 11, 2014 Impacted Services Retail Transaction Processing, MarkeTrak, eService (service requests and settlement disputes), Retail Data Access & Transparency through MIS and ercot.com, Settlement & Billing processes, ercot.com, Retail Flight Testing (CERT), MPIM, Texas Renewables website (REC), NDCRC through the MIS

9 9 System Outage on March 11, 2014 Infrastructure Failure - Tuesday 03/11/14 @ 9:27 AM Restoration of Market Facing Systems Tuesday 03/11/14 Texas Renewables (REC) – www.texasrenewables.com – 03/11/14 @ 4:01 PMwww.texasrenewables.com Settlement & Billing processes – 03/11/14 @ 4:36 PM Ercot.com – 03/11/14 @ 5:20 PM Wednesday 03/12/14 Registration (Siebel) – 03/12/14 @ 1:15 PM MPIM – 03/12/14 @ 1:15 PM Retail Transaction Processing – 03/12/14 @ 2:10 PM MarkeTrak API - 03/12/14 @ 2:10 PM MarkeTrak GUI - 03/12/14 @ 2:10 PM MIS Retail Applications - 03/12/14 @ 2:10 PM NDCRC through the MIS – 03/12/14 @ 3:02 PM Retail Transaction Processing backlog complete – 03/12/14 @ 10:15 PM

10 10 System Outage on March 11, 2014 Restoration of Market Facing Systems (continued) Thursday 03/13/14 CERT – 03/13/14 @ 3:13 PM This was actually unrelated to the infrastructure outage. Friday 03/14/14 eService (service requests and settlement disputes) – 03/14/14 @ 5:30 PM

11 11 Communications 1 st Market Notice: Tuesday, 3/11 at 12:27 PM 1 st Retail Market Conference Call: Tuesday, 3/11 at 1:00 PM Regular Market Notices and Retail Market Conference Calls through Friday, 3/14 Final notice on Monday, 3/17

12 12 The outage impacted various internal ERCOT applications and tools required to communicate both internally and externally, and access procedural documentation ERCOT’s registration system failed to initialize in the alternate data center, requiring application servers to be rebuilt, delaying the restoration of several other Retail systems/services Challenges

13 13 Overview – Retail DR Capability & Process Aaron Smallwood

14 14 Pre-2011– No DR environment or failover capability, strategy was to utilize iTest environment if extended outage occurred December 2010 – Retail/Commercial Systems DR environment delivered and tested by the data center project –Evolving state of maturity –Strategy: failover in a major outage event when primary system cannot be restored within required timeframe –Recovery Time Objective (RTO): generally, 24 hour recovery of core systems and services –Recovery Point Objective (RPO): 0 data loss –Testing Strategy : recovery site operability tested annually Retail/Commercial Systems DR Background

15 15 Retail/Commercial Systems – Current DR Capability Capable of operating out of the primary or alternate data center Capable of a 24 hour Recovery Time Objective (RTO) –Moving operations to an alternate data center within 24 hours –Historically have accomplished in less than 24 hours Capable of a 0 data loss Recovery Point Objective (RPO) Historical use of DR capability: December 2012 – Unplanned failover First “real” use of the DR environment June 2013 – Planned failover First transition back to the primary environment March 2014 – Unplanned failover

16 16 Outage events are like fingerprints… each is unique. Issue are initially handled as an IT Incident –First Priority – find the issue –Identify the scope of impacted systems and functions –Identify options and limitations for restoration and recovery –Make recommendations and coordinate restoration –Engage Business SMEs and Market Communications team Potential for an extended outage? –Mobilize the Disaster Management Team Executive management and Director-level leadership across the company –The DMT monitors the situation throughout the event to understand the scope of problem, impacts, and make “the big decisions” –Examples: the 12/3/2012 and the 3/11/2014 outages ERCOT Retail DR - Context For security reasons ERCOT cannot provide specific details regarding environments or business continuity plans.

17 17 The systems are not currently capable of “real-time” failover Once the failover decision is made, IT follows procedures to: –Verify readiness of the alternate environment –Control data replication streams during the transition –Configure integrated systems to point to the alternate environment Business follows procedures to: –Prioritize recovery efforts –Work with IT to determine where processes left off and where they should start after recovery –Determine and mitigate potential for data loss –Determine if/what work-arounds may be necessary upon recovery –Verify ability to use systems in the alternate environment –Support Market Communications ERCOT Retail DR - Process

18 18 System Outage Communications Ted Hailu

19 19 Initial and Subsequent Communications (when/how) Contingency Plans for email communication Communication outside the Market Notice process System Outage - Communications

20 20 System Outage Requirements Dave Michelsen

21 21 What is the market’s priority for recovery of retail services? –What is the quantitative and/or qualitative impact of the unavailability of each service? What is the RTO for each? May need to Consider: –Operating timelines –Importance of time of day (AM vs PM) or day of week and time of day –Tolerance level relative to invoking safety net procedures –Cost to support increases as the RTO decreases System Outage Requirements

22 22 System Outage Requirements Retail ServicePriorityRTO Retail Transaction Processing Disputes & Issues Flight Testing Data Access & Transparency (reports/extracts) Data Access & Transparency / Ad-Hoc Requests

23 23 Work-Around Processes Dave Michelsen

24 24 Are the current processes sufficient? –Move-In(s) Switch Hold Removals –Move-Outs(s) –Others? Workaround Process

25 25 Planned Failover Communications Dave Michelsen

26 26 Communication for a planned transition between sites –i.e., transition from the alternate data center back to the primary data center –Follow normal processes regarding outages/maintenance communication –Transition would be performed in a Sunday maintenance window Planned Failover Communications

27 27 The Parking Lot

28 28 TBD Parking Lot Items