1
CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE
2
Turbidity curtain installed to isolate low dock and bulkhead wall work areas, protecting the harbor and nearby waters from effects of construction.
3
Repairing extensive concrete damage on dock structural components.
4
Grouting voids in the bulkhead wall.
5
View of the completed project, with the construction barges still in the harbor. New armor stones can be seen protecting the breakwater, dock, and bulkhead wall.
6
Repaired breakwater: large voids in the concrete and rock masonry structure were grouted, and larger armor stones were placed to protect the wall from high seas.
7
Repaired concrete breakwater cap, and newly placed larger armor stones to protect dock and breakwater.