Presentation is loading. Please wait.

Presentation is loading. Please wait.

Type DOIS login & Password. Click MSP Base Information Maintenance.

Similar presentations


Presentation on theme: "Type DOIS login & Password. Click MSP Base Information Maintenance."— Presentation transcript:

1 Type DOIS login & Password

2 Click MSP Base Information Maintenance

3 Click drop down arrow and select the desired route number

4 Click Display Notice the schedule time & schedule interval In order to fix the schedule time & schedule interval, the supervisor would need to re- create the pivot plan.

5 1.Click Route & Unit Maint tab 2.Click Pivot Plan Maintenance

6 Display the desired route number by clicking on the drop down arrow

7 Why re-create the pivot plan? Update the MSP schedule time Update MSP schedule interval Improve MSP On-Time scan score Eliminate negative schedule interval

8 1.Click Create New Pivot Plan 2.Select the first Sector Segment 3.Hold down the shift key and select several segments 4.Click Create Logical groups 5.Continue to group sector segment until the very end 6.Click Save and Assign Route Proximity LG = Logical Group SS = Sector Segments LG will changed to SS after you click Create New Pivot Plan

9 Why update the Pivot Plan? It updates the MSP schedule time It updates the MSP schedule interval Improve MSP On-Time scan score Eliminate negative schedule interval By updating the Pivot Plan it ensures that the scheduled data is correct. By ensuring you have correct data, you will be able to discover street expansion, pinpoint areas of concern, and improve Street Efficiency.


Download ppt "Type DOIS login & Password. Click MSP Base Information Maintenance."

Similar presentations


Ads by Google