4 4  Design, build, and test devices to be used in a “hot cell” environment that removes molten salt from the Mark-V Electrorefiner and freezes it in appropriate sizes.  Specifications  Process must remove at least 16,500 cm 3 of salt in one week  Cubes can be no bigger than 2 inches by 2 inches by 2 inches to fit grinder

5 5 FunctionOption 1 2 3 4 Removal Method Dipping Tray Pressure Differential BucketArchimedes Screw Removal Tool ElevatorCranePipe SuctionMotorized Freezing to Size Required Venturi Atomizing Salt TraysBreakingIcemaker Transport to Container FunnelWeir/TroughFlexible Metal Tubing Manipulators

6 6 Removal Method: Dipping Tray Removal Tool: Motorized Freezing: Tray Transport to Container: Weir/Trough

7 7 Removal Method: Pressure Differential Removal Tool: Pipe Suction Freezing: Venturi Atomizing Salt Transport to Container: Flexible Metal Tubing

8 8 Removal Method: Bucket Removal Tool: Crane Freezing: Tray Transport to Container: Manipulators

9 9 Tray Valve Acme Screw Lid Bucket Displacement Body Gear Drive Crane Rod

10 10 Problem: Spilling during transportation Solution Lid

11 11 Problem: Remove smaller amount Solution Displacement Body

12 12 Problem: Bucket holds 15,000 cm 3

13 13 Problem: Smaller footprint for tray Solution Folded Tray

14 14 We couldn’t make an actual prototype, so instead we made test apparatuses

15 15

16 16 Salt ReleasePlug Test: See if salt releases from pocket Result: Salt released every time Test: See if plug can be removed after salt gets in threads Result: Plug was removed with great difficulty

17 17 Bucket Spilling Test: See if lid prevents spilling Result: Lid prevented spilling Bucket Emptying Full opened valve: 3 minutes Controlled flow rate: 6.5 minutes Tray Splashing Full opened valve: too much Controlled flow rate: very little Tray Overflow Test: See if pockets fill before overflow Result: Tends to overflow before all pockets are filled

18 18 Problem: Total volume of salt removed in bucket per cycle is only 15,000 cm 3 Solution: Align valve handle so its vertical to increase room Problem: Plug idea does not look promising Solution: Test plug idea more or ditch idea altogether Problem: Tray does overflow before all cubes are filled Solution: Put a ¼ inch or more lip around outside of tray

19 19  Sponsors at INL  Tom Johnson  Tom Pfeiffer  Lead Instructor  Dr. Steve Beyerlein  Graduate Mentors  Bill Crane  Idaho Engineering Works (IEW)  Machine Shop Supervisor  Russ Porter  Salt Testing Expert  Natalie Gese