RECOVERY and RECONSTRUCTION after the PAKISTAN EARTHQUAKE CHOOSING OPTIONS THAT WILL FACILITATE LONG-TERM RECOVERY FROM THE OCTOBER 8, 2005 DISASTER.

Similar presentations


Presentation on theme: "RECOVERY and RECONSTRUCTION after the PAKISTAN EARTHQUAKE CHOOSING OPTIONS THAT WILL FACILITATE LONG-TERM RECOVERY FROM THE OCTOBER 8, 2005 DISASTER."— Presentation transcript:

1 RECOVERY and RECONSTRUCTION after the PAKISTAN EARTHQUAKE CHOOSING OPTIONS THAT WILL FACILITATE LONG-TERM RECOVERY FROM THE OCTOBER 8, 2005 DISASTER

2 OCTOBER 8, 2005 PAKISTAN EARTHQUAKE

3 LONG-TERM RECOVERY NEEDS AFTER PAKISTAN EARTHQUAKE  NEED 2 TO 3 MILLION NEW DWELLINGS THAT ARE EARTHQUAKE RESILIENT.  NEED NEW SCHOOLS THAT ARE EARTHQUAKE RESILIENT.  NEED NEW HOSPITALS THAT ARE EARTHQUAKE RESILIENT.  NEED INFRASTRUCTURE THAT IS EARTHQUAKE RESILIENT.

4 GOALGOAL  COMMUNITIES BECOMING RESILIENT TO GROUND SHAKING, LANDSLIDES, AND THE AFTERSHOCKS  COMMUNITIES ADOPTING AND IMPLEMENTING PUBLIC POLICY MANDATES FOR MITIGATION, PREPAREDNESS, EMERGENCY RESPONSE, AND RECOVERY AND RECONSTRUCTION

5 OBJECTIVESOBJECTIVES  TO MARSHAL AND INTEGRATE EACH COMMUNITY’S STAPLE FORCES,..  …GIVING THEM AN EQUITY IN DESIGNING PROCESSES FOR BECOMING EARTHQUAKE RESILIENT.  TO MARSHAL AND INTEGRATE EACH COMMUNITY’S STAPLE FORCES,..  …GIVING THEM AN EQUITY IN DESIGNING PROCESSES FOR BECOMING EARTHQUAKE RESILIENT.

6 PROCESSES FOR BECOMING EARTHQUAKE RESILIENT  IMPROVING PUBLIC AWARENESS  IMPROVING PROFESSIONAL EDUCATION AND TRAINING  IMPROVING MONITORING AND WARNING SYSTEMS  IMPROVING PUBLIC AWARENESS  IMPROVING PROFESSIONAL EDUCATION AND TRAINING  IMPROVING MONITORING AND WARNING SYSTEMS  IMPROVED BUILDING CODES FOR NEW BUILDINGS  IMPROVED STANDARDS FOR NEW INFRASTRUCTURE  STRENGTHENING AND RETROFIT OF EXISTING STRUCTURES  EXPANDING INTERNATIONAL COOPERATION  IMPROVED BUILDING CODES FOR NEW BUILDINGS  IMPROVED STANDARDS FOR NEW INFRASTRUCTURE  STRENGTHENING AND RETROFIT OF EXISTING STRUCTURES  EXPANDING INTERNATIONAL COOPERATION

7 OBJECTIVESOBJECTIVES  USING STATE-OF- ART TOOLS TO ASSESS HAZARDS AND RISK (E.G., GROUND SHAKING MAPS AND HAZUS )  USING EMERGING TECHNOLOGY TO REDUCE VULNERABILITY IN THE BUILT ENVIRONMENT (E.G., ACTIVE AND PASSIVE ENERGY DISSIPATION)

8 STARTING POINTS  IN-COUNTRY BASIC AND APPLIED RESEARCH  LESSONS FROM THE OCTOBER 8, 2005 DISASTER  IN-COUNTRY BASIC AND APPLIED RESEARCH  LESSONS FROM THE OCTOBER 8, 2005 DISASTER  MAPS  INFORMATION  GUIDELINES FOR APPLICATIONS BY EMERGENCY MANAGERS, BUILDING OFFICIALS, AND URBAN PLANNERS  MAPS  INFORMATION  GUIDELINES FOR APPLICATIONS BY EMERGENCY MANAGERS, BUILDING OFFICIALS, AND URBAN PLANNERS

9 LESSONS FROM PAKISTAN EARTHQUAKE  THE EARTHQUAKE OCCURRED ALONG THE MAIN BOUNDARY THRUST ZONE (MBT).  THE MBT RUNS ALONG THE HIMALAYAN ARC FOR ABOUT 2,500 KM..

10 LESSONS FROM PAKISTAN EARTHQUAKE  CONSTRUCTION WAS MAINLY CONCENTRATED ON THE FLOOD- PLAIN DEPOSITS OF THE NEEHLAN, JAHLUM, AND KUNHAR RIVERS.  BUILDINGS IM MUZAFFARABAD SITED ON SAND AND GRAVEL DEPOSITS WERE SEVERELY DAMAGED.  BUILDINGS SITED ON ROCK WERE NOT SEVERELY DAMAGED.

11 EARTHQUAKE HAZARDS MODEL EXPOSURE MODEL VULNERABILTY MODEL SEISMOTECTONIC SETTING LOCATION OF STRUCTURE QUALITY OF DESIGN AND CONSTRUCTION RESISTANCE TO LATERAL FORCES IMPORTANCE AND VALUE OF STRUCTURE POLITICAL PROCESS ACCEPTABLE RISK MITIGATION COSTS EXPERIENCE AND RESEARCH DAMAGE ALDORITHM INCORPORATE NEW KNOWLEDGE INSPECTION AND REGULATION IMPLEMENTATION OF SEISMIC SAFETY POLICY ASSESSMENT OF RISK