Download presentation
Presentation is loading. Please wait.
Published bySherilyn Stanley Modified over 9 years ago
1
BATTLEMENT CREEK FIRE USDI, Bureau of Land Management
Grand Junction District Glenwood Springs Resource Area July 17, 1976
3
FUELS Primary fuel type was Gamble oak
A severe frost on 14 June had killed a high percentage of the leaves
5
WEATHER The closest weather station was Rifle, 12 miles to the ENE
No weather observations were taken on the fire The closest weather station was Rifle, 12 miles to the ENE At the time of the accident the weather in Rifle was 93 F, dew point 55 (RH 28%), winds NE at 4
6
FROM THE ACCIDENT REPORT
“At the time of the accident, the atmosphere was unstable, normal up-slope winds were occurring, winds aloft were generally light SW and ranged from 5-15 m.p.h. from 6,600 feet to 31,000 feet m.s.l.”
7
FROM THE ACCIDENT REPORT
“Observers on the fire at the time of the accident reported high winds at ground level m.p.h. and above.”
8
TOPOGRAPHY West Aspect Elevation 8550 Slopes ranged from 10-75%
9
ORIGIN 11 July: 1600 HRS, Fire reported
Contained at ½ acre by Grand Valley VFD 12-14 July: Fire monitored by Grand Valley VFD 15 July: Fire escapes 16 July: Fire has grown in size to over 500 acres, B-26 air tanker crashes with one fatality
10
FIRE PERIMETER, 17 JULY
12
Project Rulison 1969 An underground nuclear detonation
A 43 kiloton bomb, 8,426 foot deep To investigate the possibility of using nuclear explosions to extract natural gas from low grade deposits Marginally successful in causing the gas to collect in the cavity and fissures produced by the bomb The gas was too radioactive to be sold commercially The site was threatened by the fire
13
7/17 ASSIGNMENTS lower upper Happy Jack Hotshots were assigned to burnout the line starting from point A to point D B-26 Accident x
14
7/17 ASSIGNMENTS lower upper Happy Jack Hotshots were assigned to burnout the line starting from point A to point D B-26 Accident x
15
7/17 ASSIGNMENTS lower Mormon Lake Hotshots were assigned to improve and burnout the line starting from point E to point G upper
16
7/17 ASSIGNMENTS lower Mormon Lake Hotshots were assigned to improve and burnout the line starting from point E to point G upper
17
Mormon Lake Hotshots Happy Jack Hotshots
20
FROM THE ACCIDENT REPORT
“Apparently, neither crew knew of the specific location or assignment of the other.”
29
Mormon Lake Hotshots, 1976
35
“Apparently, neither crew knew of the specific location or assignment of the other.”
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.