1
How much is your product worth?
Materials Cost Labour Cost Electricity Cost Profit
2
How much is your product worth?
Materials Cost GI sheeting 10m Weld electrodes 4m Nails Steel pipework 5m Paint 9m concrete
3
Pipe Cost (rupees/m) 0.5’ 26 1.5’ 66 2’ 82 2.5’ 98 3’ 164 Total Length 3’ Pipe = ( x ) + ( x ) 5m 6 4m 6 + ( x ) 9m 3 = 81m Total Cost 3’ Pipe = x 81m 164 Rs/m = 13284 Rs Roof Compression – 3’ 10m Total Length 1.5’ Pipe = x 7m 3 = 21m 4m Total Cost 1.5’ Pipe = x 21m 66 Rs/m = 1386 Rs 7m 5m 9m Total Cost = 13284 Rs 1386 Rs Posts – 3’ = 14670 Rs Roof Tension – 1.5’ Purlins – 3’
4
Required Dry Volume = x 1.4m3 1.65 = 2.31m3 Material Cost Cement 200 Rs./kg Sand 245 Rs./m3 Gravel 81 Rs./m3 Volume cement = x 1/10 2.31m3 = 0.231m3 Bags Cement = / 0.231m3 0.0332m3/50kg bag cement = 7 bags 10m Cost cement = x 200Rs. 7 bags 4m = 1400Rs. Volume sand = x 3/10 2.31m3 = 0.69m3 7m 5m Cost sand = 169Rs. 9m Volume gravel = x 6/10 2.31m3 = 1.39m3 Concrete Mix – 1:3:6 Volume: 1.4m3 Cost gravel = 113Rs. Total Cost = 1682Rs.
5
Material Cost (rupees/m2) GI 270 Plastic GI 431 Total Roof Area = x x 4m 10m 2 = 80m2 Total Cost Roof = x 80m2 270 Rs/m2 = 21600 Rs GI Sheeting Total Cost = 10m 37952 Rs. 4m 7m 5m 9m
6
How much is your product worth?
Materials Electricity Labour Project Planning Can see when tasks need to be done – saves time Can see who needs to do each task – people always occupied, not bored Can predict and keep track of costs
7
Unrealistic timescale
Project Planning Why things go wrong: Time Assumptions No clear aim Bad Planning Unrealistic timescale Cost Quality Wrong leadership Bad Communication
8
Critical Path What is the shortest time in which a project will finish? Example:
9
Critical Path What is the shortest time in which a project will finish? Example: 1 Market 30 Walk to market 30 Wash dishes 15 Wash veg 15 Cut Veg