Download presentation
Presentation is loading. Please wait.
Published byFelicity Edwards Modified over 9 years ago
1
2012 AAPL ANNUAL MEETING SPONSORS PLATINUM GOLD SILVER SAN FRANCISCO SEMINAR GOLF A wholly owned subsidiary of ExxonMobil BRONZE
2
58 th Annual Meeting - San Francisco June 13-16, 2012 DRILLING Planning to Production AAPL - Copyright © 2012. All Rights Reserved.
3
DRILLING - Planning to Production Planning Site Selection and Preparation Conductor Casing and Water Source Drilling Rig Mobilization Rig Structure and Layout Rig Systems Drilling Surface Hole Running and Cementing Surface Casing Drilling Production Hole Well Evaluation Techniques Production Casing Rigging Down and Moving Out AAPL - Copyright © 2012. All Rights Reserved.
4
Planning Geology / Seismic Offset Drilling Data Well Design and Rig Selection AFE / Cost Estimate
5
Site Selection and Preparation Staking of Location Location Size Road Access Surface Ownership and Damages
6
Conductor Casing & Water Source Function of Conductor Casing Water Sources
7
Drilling Rig Mobilization Ingress and Egress Size and Weights Number of Truck Loads
8
Rig Structure and Layout Substructure Rig Floor Mast Support Equipment
9
Rig Systems Hoisting Rotating Circulating
10
Drilling Surface Hole Spud Bottom Hole Assembly Turning to the Right – Makin’ Hole Making a Connection “Tripping” – Pulling drill pipe out of the hole
11
Running & Cementing Surface Casing Casing Float Equipment Casing Crew and Tools
12
Drilling Production Hole Drilling out of Surface Casing Drilling Concerns Directional Drilling Zones of Interest
13
Well Evaluation Techniques Mud Logs Wireline Logs Logging While Drilling Drill Stem Testing Core Samples
14
Production Casing Production Casing Design Cement Design
15
Rigging Down and Moving Out Rigging Down Rig Preparing for Completion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.