The Solar Tower 1.Principles of operation 2.Carbon cost of manufacture 3.$$ cost and carbon credits

Similar presentations


Presentation on theme: "The Solar Tower 1.Principles of operation 2.Carbon cost of manufacture 3.$$ cost and carbon credits"— Presentation transcript:

1 The Solar Tower 1.Principles of operation 2.Carbon cost of manufacture 3.$$ cost and carbon credits http://notes.chem.usyd.edu.au/course/schmidtt/chem3adv/Chem%203%20(adv)-3.ppt By Dr Timothy W. Schmidt University of Sydney AUSTRALIA

2 1. Principles of operation Solar radiation Hot air Wind turbines 1000m

3 1. Principles of operation Glass panels trap heated air – the real greenhouse effect! 50°C typical. Peak flux averaged over 24h Peak flux (instant equilibration)

4 1. Principles of operation Assume T const Heavy air column Light air column

5 1. Principles of operation Kinetic energy in air mass  60 2.  v 2 =4MW 120m Designers say 200MW This requires the air in the base of the tower to be moving at 221m/s… unless I am mistaken. problem the real air flow in this chimney is 10 to 15 m/s a pressure gap exists between upstream and downstream the turbine. The theoretical power output (before subtracting various losses) is equal to this pressure gap multiplied by the voluminal air flow, in m³/s. This pressure gap calculates as in the hydrostatic problem, by integrating, over the whole chimney height, the voluminal weight difference between outside and inside the chimney.

6 2. Carbon cost of manufacture Glass panels! 20,000,000 m 2 100,000 kg 1.3 TJ OK – only 2h of operation Source: www.greenhouse.gov.au 5g/m² ratio for the glass cover seem underestimated => more then 2h

7 2. Carbon cost of manufacture Tower 1,000 m 2,000,000 m 3 concrete 4.6 Tg 26 PJ 8 years of power OK Source: www.greenhouse.gov.au In reinforced concrete only two components are CO2 unfriendly: the steel reinforcement, and the cement powder. The others (sand, pebbles, water) have no carbon cost. => "8 years" is overestimated.

8 3. $ cost Tower cost estimated at 170 M€ 2,000,000 m 3 concrete = 30M€ Add labour – plausible Glass $10/m 2 $200M = 140M € Add labour – plausible

9 3. $ cost 200 MW power station 680 GWh/a We get 905 kWh/tonne CO2 Abate 750,000 tonnes CO2/a Can sell for 20 € 15M€ pa