1
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary
2
Purpose To identify the most influential cost factors affecting housing construction in Saudi Arabia and to make recommendations based on these factors.
3
Outline Introduction Introduction Literature Review Literature Review Research Methodology Research Methodology Results & Analysis Results & Analysis Conclusion Conclusion Recommendations Recommendations
4
Introduction Importance of housing sector Importance of housing sector –Basic human needs –Social implications –Largest single expenditure –Socioeconomic development
5
Challenges Population growth Population growth Saudi life style Saudi life style Affordable housing Affordable housing
6
Literature Review Identify common cost factors Identify common cost factors Use these factors in the study Use these factors in the study Factor Categories: Factor Categories: 1.Environmental 2.Operational 3.Contractual 4.Estimation 5.Financial
7
Environmental Factors Weather Effects Weather Effects Construction Demand Construction Demand Culture Shock Culture Shock Site Location & Conditions Site Location & Conditions Local Competition Local Competition Local Economy Local Economy Local Skills (Education/Training) Local Skills (Education/Training) Foreign Firm Domination Foreign Firm Domination Local Laws & Regulations Local Laws & Regulations Labor Nationality Labor Nationality
8
Operational Factors Project Planning & Scheduling Project Planning & Scheduling Project Coordination Project Coordination Construction Design Construction Design Materials & Workmanship Materials & Workmanship On-Site Control On-Site Control Work Experience Work Experience On-Site Disputes On-Site Disputes
9
Contractual Factors Management of Contract Management of Contract Type of Contract Used Type of Contract Used Overtime/Expedition Stipulations Overtime/Expedition Stipulations Design Changes Design Changes Duration of Contract Duration of Contract Qualified Labor Availability Qualified Labor Availability
10
Estimation Factors Material Cost Estimation Material Cost Estimation Labor Cost Estimation Labor Cost Estimation Equipment Cost Estimation Equipment Cost Estimation Equipment Maintenance Estimation Equipment Maintenance Estimation Interest Rate Estimation Interest Rate Estimation Productivity Expectations Productivity Expectations Supplier Expectations Supplier Expectations Historical Data Availability Historical Data Availability
11
Financial Factors Financing Financing Inflation Inflation Currency Exchange Rates Currency Exchange Rates
12
Research Methodology Opinion of Saudi professionals Opinion of Saudi professionals Qualifications: Qualifications: –Consultants, contractors, or developers –10 years experience Opinions gathered via questionnaire Opinions gathered via questionnairequestionnaire Responses are indexed for analysis Responses are indexed for analysis Index formula: Index formula:Index=[(A*5)+(B*4)+(C*3)+(D*2)+(E*1)]/N
13
Results & Analysis 35 Respondents: 35 Respondents: –16 Contractors –14 Consultants –5 Developers
14
Consolidated Ratings
15
Consolidated Ranking Rank Cost Factor Cost Factor 1 Qualified Labor Availability Qualified Labor Availability 2 Materials & Workmanship Materials & Workmanship 3 Construction Design Construction Design
16
Segregated Rankings RankConsultantsContractorsDevelopers 1 Design Changes Laws & Regulations On-Site Disputes 2 Duration of Contract Planning & Scheduling Work Experience 3 Qualified Labor Availability Construction Design Project Coordination
17
Correlation ConsultantsContractorsDevelopers Consultants100%22%26% Contractors22%100%49% Developers26%49%100%
18
Environmental Factors
19
Operational Factors
20
Contractual Factors
21
Estimation Factors
22
Financial Factors
23
Study Limitations Survey Target Survey Target Respondent Pool Respondent Pool Divergent Responses Divergent Responses Subjectivity of Respondents Subjectivity of Respondents Type of Projects Type of Projects Geographical Scope Geographical Scope
24
Conclusion Summary Summary By Respondent: By Respondent: –Consultants 1. Design Changes 2. Contract Duration –Contractors 1. Laws & Regulations 2. Planning & Scheduling –Developers 1. On-Site Disputes 2. Work Experience
25
Conclusion (Cont.) By Factor: By Factor: –Environmental 1. Laws & Regulations 2. Competition (Cost Saving) –Operational 1. On-Site Disputes 2. Planning & Scheduling –Contractual 1. Overtime/Expedition 2. Overtime/Expedition –Estimation 1. Equipment Costs 2. Interest Rates –Financial 1. Inflation 2. Financing
26
Recommendations Contractors center stage Contractors center stage Laws & Regulations: Laws & Regulations: –Authorities: Publicize –Contractors: Challenge Planning & Scheduling Planning & Scheduling –Reconsider/relax plans & schedules –Empower planners & schedulers