Download presentation
Presentation is loading. Please wait.
Published byLinette Stevenson Modified over 9 years ago
1
„We can together use the power of water”
2
73,000 Gorazde, Žilići bb, Bosnia and Herzegovina Goražde Sarajevo 55 km
3
Considering the Study of Energy Sector B&H it is expected the growth of electricity consumption of 64% untill 2020. Recommendation of the Study as soon as possible start with building new power plants such as hydro and wind power plants. Energy sector is the most attractive sector for investing 60% of unused hydro potential Enormous market for electricity export Bosnia&Herzegovina is signatory of the International Energy Community Treaty Treaty established single market for electricity in 33 European countries
4
Profitable production of electricity, Good climate conditions, Environmentally acceptable project, Hidro power plant more than 5 year in function, Possibillity to build 3 new HPPs, Consumption of electricity has continuos growth. “HPP Osanica 4” has all necessary documentations: Concession contract, Town planning consent, Building license & technical acceptance, Environment and water permits, License of Federal Energy Regulation Commission – FERK-a.
5
Area of the river basin16,7 km 2 Lenght of conduction canal1535 m Lenght of penstock 290 m Average annual flow0,520 m3/s Project flow0,700 m3/s Gross fall112 m Net fall105 m Installed power of unit630 kW Annual electricity production2,5 GWh
6
The share of equity - € 600,000 or 50% Investment in new projectscooperation with potential investor Company: Eco Energy d.o.o. City: Gračanica Post No:75320 Adress:Sarajevska 1 Director:Muamer Jarovic Phone: +387 35 707 800 Fax: +387 35 707 801 E-mail: d.salibasic@ecoenergy.ba Web adress: www.ecoenergy.ba Company is 100% owned by private persons Financing: Total investment of- € 1.200.000; Strategic partner - € 600,000;
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.