Presentation is loading. Please wait.

Presentation is loading. Please wait.

INDUSTRIAL TRAINING INSTITUTE (GIRLS) IMC SOCIETY, BARSHI ROAD, LATUR- 413 531 District -LATUR, MAHARASHTRA STATE Tel. No. 02382-221050 Fax No. 02382-221998.

Similar presentations


Presentation on theme: "INDUSTRIAL TRAINING INSTITUTE (GIRLS) IMC SOCIETY, BARSHI ROAD, LATUR- 413 531 District -LATUR, MAHARASHTRA STATE Tel. No. 02382-221050 Fax No. 02382-221998."— Presentation transcript:

1 INDUSTRIAL TRAINING INSTITUTE (GIRLS) IMC SOCIETY, BARSHI ROAD, LATUR- 413 531 District -LATUR, MAHARASHTRA STATE Tel. No. 02382-221050 Fax No. 02382-221998 E-mail : iti_latur_g@yahoo.co.in UPGRADATION WITH VIDEOCON INDUSTRIES, AURANGABAD AS INDUSTRY PARTNER ESTD.1992 S-1

2 S-2 Sr. no.ACTIVITYDESCRIPTION 1 Institute CategoryWomen 2 EstablishmentAugust, 1992 3 Intake228 4 Total Land6.07 Hectors 5 Construction of building 1509.87 sq.mts 6 Plantation2180 trees 7 IMC formation08-02-2008 8 Industry PartnerM/s Videocon Industries Limited Aurangabad 9 Awards -Rajiv Gandhi Prashaskiya Gatimanta Abhiyan 2006,2007, 2008 & 2009 from DistrictCollector,Latur ABOUT INSTITUTE

3 TARGET AND ACHEIVEMENT Sl No ParticularsTargetAchievement 1Expansion – Intake (In Nos.) 500116 TO 324 2Loan Amount Received (Rs. In Lacs) 25097 3Seed Money (Rs. In Lacs) 125- 4Civil Work (Rs. In Lacs)6554.14 5Machinery & Equipment (Rs. In Lacs) 4027.94 6Lab Set up Furniture (Rs. In Lacs) 10.503.30 7All Other Expenses (Rs. In Lacs) 34.5014.92 S-3

4 CIVIL WORK STATUS  CONSTRUCTION OF COE BUILDING  Built up Area 7406 sq.ft.  Estimated Cost87.76 lakhs  Accepted Rate by the Contractor 52.20 lakhs  Savings in construction cost35.55 lakhs  Total proposed expenditure 60.00 lakhs  Total Expenditure as on today54.14 lakhs EXISTINGCOE S-4

5 ACADEMICS  100 % Admissions  AITT Results above 90%  Continuous guidance from the higher authorities and faculties. Visit of Hon. Bhanwar Lalji, Principal Secretary, AP Govt. to DM under IMC Display of quality jobs (COE) VISIT OF HON. J.D.BHUTANGE SAHEB DIR.(TRG) MUMBAI YearAdmi ssion Appea red Drop outs PassedResult 2006-071129813%8385% 2007-0880774 %6990 % 2008-091121093 %9991 % SPECIAL EVENTS S-5

6 Exclusive Data Bank YEARAPPEAREDPASSED OUT EMPLOY ED SELF EMPLOY MENT Further Edn 2006-079883294410 2007-087769313008 2008-0910999524012 TOTAL28425111211430 ABSTRACT  Placement in Partner-Industry VIDEOCON INDUSTRIES LTD. Aurangabad  Placement in ONIDA, Thane  Placement in B.G.APPLIANCES A’bad  MOU likely to be signed with BOMBAY RAYON Fashions limited Latur for supplying trained woman for garment factory. Project requirement is 1500 trained woman PLACEMENTS 90% TCPC S-6

7 INFRASTRUCTURE FACILITIES UPGRADED EXTERNAL BEFOREAFTER ENTRANCE APPROACH BEUATIFICATION S-7

8 BEFORE- 300 Sapling PLANTATION S-8 AFTER - 2180 Sapling INFRASTRUCTURE FACILITIES UPGRADED EXTERNAL

9 BEFOREAFTER DM SECTION S-9 INFRASTRUCTURE FACILITIES UPGRADED BUILDING BACK SIDE OLD BUILDING COE NEW BUILDING

10 BEFOREAFTER IT & ESM SECTION SP SECTION INFRASTRUCTURE FACILITIES UPGRADED-INTERNAL S-10

11 BEFOREAFTER FURNITURE SET- UP EBT - 4 FURNITURE SET UP CLASSROOM INFRASTRUCTURE FACILITIES UPGRADED-INTERNAL DUAL DESK SAMPLE SANCTION ORDER PLACED S-11

12 INFRASTRUCTURE NEWLY CREATED FOR COE COE NEW BUILDING LAB SET UP EBT -3 (WITH SECTION LIB) LAB SET UP EBT -2 (WITH SECTION LIB) LAB SET UP EBT -1 S-12

13 INFRASTRUCTURE NEWLY CREATED FOR COE S-13 LAB SET UP EBT -4 LAB SET UP EBT -5 AL PARTITION LAB SET UP EBT -6

14 OTHER ACTIVITIES Installation of garden lamps Installation of solar lamps S-14 Plantation ( maintenance ) Rain-Water Harvesting

15 OTHER ACTIVITIES S-15 Eye camp Free medical check ups Yoga Training

16 Attitude Change Training for Trainers & Trainees Art of Living – Navchetana workshop from 1-2-2010- to 5-2-2010 Meditation, Pranayama, the health, hygene in daily life & human values. Closing ceremony by DY. Collector, Anadkar saheb Art of Living – Navchetana workshop of Shri Shri Ravishankarji through art of living family, Latur branch-head Dr. Pranita Chakurkar. S-16

17 Overall Cleanliness – 5 S S-17

18 AWARDS- Rajiv Gandhi Prashaskiya Abhiyaan Award S-18 2006 2008 2009 2007

19 IRG ThroughBenefi ciaries Income (Rs. In lakhs MES & Short Term Courses 52114.72 POTS-0.69 COE Fees & IMC Quota Admissions -1.02 TOTAL16.43 RESOURCE GENERATION (2009-10) It’s Woman ITI Out of Rs. 16.43 lacs, the amount actually received is Rs.6.02 lacs. Remaining Rs.10.41lacs is awaited from RDAT, Mumbai Mrs. Mahalaxmi Fulware, Income –Rs.8000/- p.m. Mrs. Gadade Chhaya Digambar, Income- Rs.6000/- p.m. S-19

20 Resource Generation (2009-10) It’s Woman ITI Mrs. Gaikwad Rajashri, Income-Rs.9000/- p.m. Mrs. Chapolikar Anita, Income, Rs.7000/- p.m. Mrs. Pawale(Ex-PFV Trainee-, Income- Rs. 8000/- p.m. Mrs. Devre Prabhavati, Income-Rs.10000/- p.m. S-20

21 S-21 Sr. no. ACTIVITYDOI 1 Revenue Generation of Rs.12 lacs Thr’ Advance courses in Animation,Web Designing,MES,POTS,etc By Dec’2010 2 Advance Module TrainingAUG’10 3 100% Admissions to ALL TRADESAUG’10 4 100%Placement of Electronics,COPA,SP Advance Module thro’IMC By Dec’2010 5 To Fullfill demand of BRFL by inducting 1500 trained woman in Garment Sector Sep’10 6 To Start Hi-Tech Garment Training CentreAug’10 MOVING FORWARD 2010-11

22


Download ppt "INDUSTRIAL TRAINING INSTITUTE (GIRLS) IMC SOCIETY, BARSHI ROAD, LATUR- 413 531 District -LATUR, MAHARASHTRA STATE Tel. No. 02382-221050 Fax No. 02382-221998."

Similar presentations


Ads by Google