Download presentation
Presentation is loading. Please wait.
Published byBarbra Lawrence Modified over 9 years ago
1
High Level
2
Xiaoqun Mao – GM and Operation Manager Amanda Guo – Finance and HR Manager Sam Zhu – Purchase Manager Boyu Cui – Material and IT Manager Jie Zhang – Sales and Marketing Manager Winky Yu – Facility and Engineering Manager
3
Build a plant and start operation of seamless garments production within 275 days Ramp up production volume of seamless garments from 576K to 1,460K
4
20132014201520162017 Machine 6791215 Machine Operator 22344 Packaging Operator 457811 Technincian 11111
5
Plant locates at Shanghai Songjiang
8
Market Risk – Low Demand for seamless garments in China market due to peoples’ preference Demand for seamless garments in oversea market due to economy situation Risk mitigation: Design garments per customer’s wants and needs Technical Risks – Low All proven technologies with minimum risk Operations – Medium Quality stability On-time Sop Availability of skilled labor and professionals Risk mitigation: Hire experienced operators and retention plans for key employees
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.